Time-Cost Performance Effect of Change Orders from Accelerated Contract Provisions

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 3

Abstract

Accelerated contract provisions (ACPs) such as cost-plus-time (A+B) and incentives/disincentives (I/D) are increasingly common, yet very little is known about their pure time-cost performance effects on change orders. To fill this large knowledge gap, a two-stage research methodology drawing on 1,372 highway improvement projects completed in California was adopted for this study. The Stage I study investigated the marginal change-order impacts of two ACPs, pure A+B and I/D combined with A+B. How ACP change orders affect projects’ time-cost performance was numerically modeled and successfully validated over the Stage II study. The results clearly showed that both ACPs led to more schedule-change and cost-change orders than conventionally contracted projects, whereas I/D combined with A+B performed significantly better than pure A+B in terms of the magnitude of schedule-change orders. This conveys an important recommendation to state transportation agencies (STAs) that A+B be used with an I/D provision. The results and numerical models of this study would help STAs better assess and justify the impact of change orders on the duration and cost of projects, enabling them to more effectively use contingency amounts. Use of the models can also benefit contractors requesting a change order because the models can provide them with advanced knowledge of the probable time-cost growth rates specifically for the pursued ACP.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The research study was funded by the California Department of Transportation (Caltrans) and the authors would like to sincerely acknowledge the assistance and cooperation of Caltrans in obtaining project data, especially to Mr. Anthony Perry and Mr. John Kung at the Division of Construction and the Office of Project Engineers for their contributions to the project data collection. Their assistance was crucial to the successful completion of this research paper. Opinions expressed are those of the authors and are not necessarily those of Caltrans.

References

Al-Momani, A. H. (2000). “Construction delay: A quantitative analysis.” Int. J. Project Manage., 18(1), 51–59.
Alnuaimi, A. S., Taha, R. A., Al Mohsin, M., and Al-Harthi, A. S. (2009). “Causes, effects, benefits, and remedies of change orders on public construction projects in Oman.” J. Constr. Eng. Manage., 615–622.
Anderson, S. D., and Russell, J. S. (2001). “Guidelines for warranty, multi-parameter, and best value contracting.”, Transportation Research Board, Washington, DC.
Assaf, S. A., and Al-Hejji, S. (2006). “Causes of delay in large construction projects.” Int. J. Project Manage., 24(4), 349–357.
Bai, Y., and Li, Y. (2006). “Determining major causes of highway work zone accidents in Kansas.” Kansas Dept. of Transportation, Lawrence, KS.
Bayraktar, M. E., Cui, Q., Hastak, M., and Minkarah, I. (2004). “State-of-practice of warranty contracting in the United States.” J. Infrastruct. Syst., 60–68.
Chen, J.-H., and Hsu, S. (2007). “Hybrid ANN-CBR model for disputed change orders in construction projects.” Autom. Constr., 17(1), 56–64.
Chester, M., and Hendrickson, C. (2005). “Cost impacts, scheduling impacts, and the claims process during construction.” J. Constr. Eng. Manage., 102–107.
Choi, K., Haque, M., Lee, H., Cho, Y., and Kwak, Y. H. (2013). “Macroeconomic labour productivity and its impact on firm’s profitability.” J. Oper. Res. Soc., 2013(64), 1258–1268.
Choi, K., and Kwak, Y. H. (2012). “Decision-support model for incentives/disincentives time-cost tradeoff.” Autom. Constr., 21(2012), 219–228.
Choi, K., Kwak, Y. H., Pyeon, J. H., and Son, K. (2012). “Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects.” J. Constr. Eng. Manage., 323–330.
Choi, K., Kwak, Y. H., and Yu, B. (2010). “Quantitative model for determining incentive/disincentive amounts through schedule simulations.” Simulation Conf. (WSC), Proc., 2010 Winter, IEEE, New York, 3295–3306.
Christiansen, D. L. (1987). “An analysis of the use of incentive/disincentive contracting provisions for early project completion.” Proc., National Conf. on Corridor Traffic Management for Major Highway, Transportation Research Board, Washington, DC.
Edwards, M. (1998). “Highway user’s perspective on innovative contracting/quality in highway construction.” Symp. on Innovative Contracting, Federal Highway Administration (FHWA), Washington, DC.
Ellis, R., and Pyeon, J. (2005). “A study of simulation-based contract incentives and disincentives usage.” Construction Research Congress: Broadening Perspectives, ASCE, Reston, VA.
Ellis, R. D., Jr., Pyeon, J.-H., Herbsman, Z. J., Minchin, E., and Molenaar, K. (2007). “Evaluation of alternative contracting techniques on FDOT construction projects.”
El-Rayes, K. (2001). “Optimum planning of highway construction under A+ B bidding method.” J. Constr. Eng. Manage., 261–269.
El-Rayes, K., and Kandil, A. (2005). “Time-cost-quality trade-off analysis for highway construction.” J. Constr. Eng. Manage., 477–486.
Fayek, A. R., Dissanayake, M., and Campero, O. (2003). “Measuring and classifying construction field rework: A pilot study.”, Univ. of Alberta, Edmonton, AL, Canada.
Fayek, A. R., and Oduba, A. (2005). “Predicting industrial construction labor productivity using fuzzy expert systems.” J. Constr. Eng. Manage., 938–941.
FHWA (Federal Highway Administration). (1989). “Incentive/disincentive (I/D) for early completion.”, U.S. Dept. of Transportation, Washington, DC.
FHWA (Federal Highway Administration). (2012). “Moving ahead for progress in the 21st Century Act (MAP-21): A summary of highway provisions.” U.S. Dept. of Transportation (DOT), Office of Policy and Government Affairs, Washington, DC.
FHWA (Federal Highway Administration). (2014). “MAP-21: Moving ahead for progress in the 21st century.” 〈https://www.fhwa.dot.gov/map21〉 (Jul. 5, 2014).
Fick, G., Cackler, E. T., Trost, S., and Vanzler, L. (2010). “Time-related incentive and disincentive provisions in highway construction contracts.”, National Cooperative Highway Research Program (NCHRP), Washington, DC.
Gransberg, D. D., and Shane, J. S. (2010). “Construction manager-at-risk project delivery for highway programs—A synthesis of highway practice.”, National Cooperative Highway Research Program (NCHRP), Washington, DC.
Hanna, A. S., Camlic, R., Peterson, P. A., and Nordheim, E. V. (2002). “Quantitative definition of projects impacted by change orders.” J. Constr. Eng. Manage., 57–64.
Herbsman, Z. J., Chen, W. T., and Epstein, W. C. (1995). “Time is money: Innovative contracting methods in highway construction.” J. Constr. Eng. Manage., 273–281.
Herbsman, Z. J., and Ellis, R. (1995). Determination of contract time for highway construction projects, Transportation Research Board, Washington, DC.
Holiday, D. B., Ballard, J. E., and McKeown, B. C. (1995). “PRESS-related statistics: Regression tools for cross-validation and case diagnostics.” Med. Sci. Sports Exercise, 27(4), 612.
Hsieh, T.-y., Lu, S.-t., and Wu, C.-h. (2004). “Statistical analysis of causes for change orders in metropolitan public works.” Int. J. Project Manage., 22(8), 679–686.
Ibarra, C., Trietsch, G., and Dudek, C. (2002). “Strategies used by state DOT’s to accelerate highway construction projects.” Texas A&M Univ., Dept. of Civil Engineering, College Station, TX.
Jafarzadeh, R., Ingham, J., Walsh, K., Hassani, N., and Ghodrati Amiri, G. (2015). “Using statistical regression analysis to establish construction cost models for seismic retrofit of confined masonry buildings.” J. Constr. Eng. Manage., 141(5), 04013062.
Jaraiedi, M., Plummer, R. W., and Aber, M. S. (1995). “Incentive/disincentive guidelines for highway construction contracts.” J. Constr. Eng. Manage., 112–120.
Jiang, Y., Chen, H., and Li, S. (2010). “Determination of contract time and incentive and disincentive values of highway construction projects.” Int. J. Constr. Educ. Res., 6(4), 285–302.
Lee, E.-B., Choi, K., and Lim, S. (2008). “Streamlined strategies for faster, less traffic-disruptive highway rehabilitation in urban networks.”, Transportation Research Board, Washington, DC.
Lee, J.-K. (2008). “Cost overrun and cause in Korean social overhead capital projects: Roads, rails, airports, and ports.” J. Urban Plann. Dev., 59–62.
Lewis, C. D. (1982). Industrial and business forecasting methods: A practical guide to exponential smoothing and curve fitting, Butterworth Scientific, London.
Makridakis, S., Wheelwright, S. C., and Hyndman, R. J. (2008). Forecasting methods and applications, Wiley, Hoboken, NJ.
Meyers, L. S., Gamst, G., and Guarino, A. J. (2006). Applied multivariate research: Design and interpretation, Sage, Thousand Oaks, CA.
Montgomery, D. C. (2013). Applied statistics and probability for engineers, 6th Ed., Wiley, Hoboken, NJ.
Moselhi, O., Assem, I., and El-Rayes, K. (2005). “Change orders impact on labor productivity.” J. Constr. Eng. Manage., 354–359.
Napolitan, F., and Zegras, P. C. (2008). “Shifting urban priorities?: Removal of inner city freeways in the United States.”, Transportation Research Board, Washington, DC.
Ott, L., and Longnecker, M. (2010). An introduction to statistical methods and data analysis, Brooks/Cole, Pacific Grove, CA.
Paulsen, C., Gallivan, F., Chavez, M., and Venner, M. (2008). “NCHRP 8-36 Task 72: Guidelines for cost estimation improvements at State DOTs.”, Transportation Research Board, Washington, DC.
Rister, B. W., and Wang, Y. (2004). “Evaluation of current incentive/disincentive procedures in construction.” Kentucky Transportation Center, Univ. of Kentucky, Lexington, KY.
Scott, S., Molenaar, K. R., Ransberg, D. D., and Smith, N. C. (2006). “Best-value procurement methods for highway construction projects.”, Transportation Research Board, Washington DC.
Serag, E., Oloufa, A., Malone, L., and Radwan, E. (2010). “Model for quantifying the impact of change orders on project cost for US roadwork construction.” J. Constr. Eng. Manage., 136(9), 1015–1027.
Sheskin, D. J. (2003). Handbook of parametric and nonparametric statistical procedures, CRC Press, Boca Raton, FL.
Shr, J. F., and Chen, W. T. (2003). “A method to determine minimum contract bids for incentive highway projects.” Int. J. Project Manage., 21(8), 601–615.
Shr, J. F., and Chen, W. T. (2004). “Setting maximum incentive for incentive/disincentive contracts for highway projects.” J. Constr. Eng. Manage., 84–93.
Shr, J.-F., and Chen, W.-T. (2006). “Functional model of cost and time for highway construction projects.” J. Mar. Sci. Technol., 14(3), 127–138.
Shr, J.-F., Ran, B., and Sung, C. W. (2004). “Method to determine minimum contract bid for A+ B+ I/D highway projects.” J. Constr. Eng. Manage., 509–516.
Sillars, D. N. (2007). “Establishing guidelines for incentive/disincentive contracting at ODOT.” Oregon Dept. of Transportation, Corvallis, OR.
Spiegelman, C., Park, E. S., and Rilett, L. (2011). Transportation statistics and microsimulation, Chapman & Hall/CRC, Boca Raton, FL.
Tarpey, T. (2000). “A note on the prediction sum of squares statistic for restricted least squares.” Am. Stat., 54(2), 116–118.
Taylor, T. R., Uddin, M., Goodrum, P. M., McCoy, A., and Shan, Y. (2012). “Change orders and lessons learned: Knowledge from statistical analyses of engineering change orders on Kentucky highway projects.” J. Constr. Eng. Manage., 1360–1369.
Van Dam, T., et al. (2005). “Guidelines for early-opening-to-traffic Portland cement concrete for pavement rehabilitation.”, Transportation Research Board, Washington, DC.
Washington DOT. (2014). “A + B bidding.” 〈http://www.wsdot.wa.gov/projects/delivery/alternative/abbidding〉 (Jul. 13, 2014).
Wichern, S. (2004). “Protecting design-build owners through design liability coverage, independent construction mangers, and quality control procedures.” Transp. Law J., 32(1), 35–56.
Yan, X. (2009). Linear regression analysis: Theory and computing, World Scientific, Singapore.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 3March 2016

History

Received: Feb 19, 2015
Accepted: Aug 11, 2015
Published online: Oct 19, 2015
Published in print: Mar 1, 2016
Discussion open until: Mar 19, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Kunhee Choi, A.M.ASCE [email protected]
Assistant Professor, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 305, College Station, TX 77843-3137 (corresponding author). E-mail: [email protected]
Hyun Woo Lee, M.ASCE [email protected]
Assistant Professor, Dept. of Construction Management, Univ. of Washington, 120 Architecture Hall, Campus Box 351610, Seattle, WA 98195. E-mail: [email protected]
Ph.D. Candidate, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 328, College Station, TX 77843-3137. E-mail: [email protected]
David Bilbo [email protected]
Professor, Dept. of Construction Science, Texas A&M Univ., 3137 TAMU, Francis Hall 310, College Station, TX 77843-3137. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share