Technical Papers
Aug 7, 2015

Acceptance of the Incentive/Disincentive Contracting Strategy in Developing Construction Markets: Empirical Study from India

Publication: Journal of Construction Engineering and Management
Volume 142, Issue 2

Abstract

Modern construction projects often include incentive/disincentive (I/D) provisions in order to serve a variety of different client objectives. Studies have shown both the advantages and disadvantages of using I/D clauses to improve performance. In India, out of 82 construction projects of varied size and nature investigated, only 14 projects of a critical nature were found to have I/D clauses in their contract document. The present study was carried out to identify various attributes affecting the successful use of I/D clauses in achieving their intended purpose. A total of 25 attributes were identified based on a literature review and structured personal interviews that present practical difficulties while using the I/D contracting method and thus, prevent I/D clauses from unlocking their true potential. These attributes have been evaluated based on the results of a survey conducted among experienced professionals working in the Indian construction industry. Factor analysis conducted on responses associated with important attributes identified five key factors: difficulty in contract management, additional effort by project participants, adverse effect on the working relationship of the client and contractor, increased responsibility of the client, and client’s reluctant top management. These factors also explain the reason behind the low acceptance of the I/D contracting method in developing construction markets. Case studies performed in four construction projects show that three out of four projects discussed were delayed due to inadequate understanding and wrong implementation of I/D provisions. This paper will be of interest to academicians and practitioners interested in the use of the I/D contracting method in construction projects.

Get full access to this article

View all available purchase options and get full access to this article.

References

Abu-Hijleh, S. F., and Ibbs, C. W. (1989). “Schedule-based construction incentives.” J. Constr. Eng. Manage., 430–443.
Anderson, S., Shane, J. S., and Schexnayder, C. (2011). “Strategies for planned project acceleration.” J. Constr. Eng. Manage., 372–381.
Arditi, D., Khisty, J., and Yasamis, F. (1997). “Incentive/disincentive provisions in highway contracts.” J. Constr. Eng. Manage., 302–307.
Bajari, P., and Tadelis, S. (2001). “Incentives versus transaction costs: A theory of procurement contracts.” RAND J. Econ., 32(3), 387–407.
Blyth, H. A. (1969). “Design of incentive contracts—Basic principles.” J. Roy. Aeronaut. Soc., 73(822), 119–124.
Bower, D., Ashby, G., Gerald, K., and Smyk, W. (2002). “Incentive mechanisms for project success.” J. Manage. Eng., 37–43.
Bresnen, M., and Marshall, N. (2000). “Motivation commitment and the use of incentives in partnerships and alliances.” Constr. Manage. Econ., 18(5), 587–598.
Broome, J., and Perry, J. (2002). “How practitioners share fractions in target cost contracts.” Int. J. Proj. Manage., 20(1), 59–66.
Bubshait, A. A. (2003). “Incentive/disincentive contracts and its effects on industrial projects.” Int. J. Proj. Manage., 21(1), 63–70.
Carpenter, B., Fekpe, E., and Gopalakrishna, D. (2003). “Performance based contracting for the highway construction industry.”, Koch Industries, Washington, DC.
Chan, W. M., and Chan, P. C. (2010). “Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction.” J. Constr. Eng. Manage., 495–507.
Chen, Q., and Jin, R. (2013). “Multilevel safety culture and climate survey for assessing new safety program.” J. Constr. Eng. Manage., 805–817.
Choi, K., Kwak, Y. H., Pyeon, J., and Son, K. (2012). “Schedule effectiveness of alternative contracting strategies for transportation infrastructure improvement projects.” J. Constr. Eng. Manage, 323–330.
CII (Construction Industry Institute). (1993). “Zero injury techniques.”, Austin, TX.
Crocker, K. J., and Reynolds, K. J. (1993). “The efficiency of incomplete contracts: An empirical analysis of Air Force engine procurement.” RAND J. Econ., 24(1), 126–146.
Dikmen, S. U., and Sutemen, Z. (2011). “Use of incentive contracts in Turkish construction sector.” Proc., 6th Int. Conf. on Construction in the 21st Century: Construction Challenges in the New Decade, CITC-VI, Greenville, NC, 693–700.
Dillon, W. R., and Goldstein, M. (1984). Multivariate analysis, Wiley, New York.
Finchum, J. A. (1972). “Expectation of contract incentives.” Naval Res. Logist. Q., 19(2), 389–397.
Geller, E. S. (1999). “Behaviour-based safety: Confusion, controversy and clarification.” Occup. Health Saf., 68(1), 40–49.
Hasan, A., and Jha, K. N. (2011). “Schedule incentive/penalty provisions in Indian Construction projects.” Proc., 6th Int. Conf. on Construction in the 21st Century: Construction Challenges in the New Decade, CITC-VI, Greenville, NC, 185–192.
Hasan, A., and Jha, K. N. (2013). “Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance.” Int. J. Inj. Control Saf. Promotion, 20(1), 3–12.
Heckman, R. H., and Edwards, B. R. (2004). “Time is money: Recovery of liquidated damages by the owner.” Construction Lawyer, American Bar Association, Chicago.
Herbsman, Z. J., Chen, W. T., and Epstein, W. C. (1995). “Time is money: Innovative contracting methods in highway construction.” J. Constr. Eng. Manage., 273–281.
Herbsman, Z. J., and Ellis, R. (1995). Determination of contract time for highway construction projects, Transportation Research Board, Washington, DC.
Herten, H. J., and Peeters, W. A. R. (1986). “Incentive contracting as a project management tool.” Int. J. Proj. Manage., 4(1), 34–39.
Hinze, J. (2002). “Safety incentives: Do they reduce injuries?” Pract. Period. Struct. Des Constr., 81–84.
Hinze, J., Hallowell, M., and Baud, K. (2013). “Construction-safety best practices and relationships to safety performance.” J. Constr. Eng. Manage., 04013006.
Hwang, B., and Lim, E. J. (2013). “Critical success factors for key project players and objectives: Case study of Singapore.” J. Constr. Eng. Manage., 204–215.
Ibbs, C. W., and Ashley, D. B. (1987). “Impact of various construction contract clauses.” J. Constr. Eng. Manage., 501–521.
Iyer, K. C., and Jha, K. N. (2005). “Factors affecting cost performance: Evidence from Indian construction projects.” Int. J. Proj. Manage., 23(4), 283–295.
Jaafari, A. (1996). “Twinning time and cost in incentive-based contracts.” J. Manage. Eng., 62–72.
Jaraiedi, M., Plummer, R. W., and Aber, M. S. (1995). “Incentive/disincentive guidelines for highway construction contracts.” J. Constr. Eng. Manage., 112–120.
Meng, X., and Gallagher, B. (2012). “The impact of incentive mechanisms on project performance.” Int. J. Proj. Manage., 30(3), 352–362.
Microsoft Project [Computer software]. Redmond, WA, Microsoft.
Mitropoulos, P., and Memarian, B. (2012). “Team processes and safety of workers: Cognitive, affective, and behavioral processes of construction crews.” J. Constr. Eng. Manage., 1181–1191.
Molenaar, K. R., Jeong-II, P., and Washington, S. (2009). “Framework for measuring corporate safety culture and its impact on construction safety performance.” J. Constr. Eng. Manage., 488–496.
National Audit Office. (2001). “The channel tunnel rail link.” Her Majesty’s Stationery Office, London.
National Audit Office. (2004). “London underground PPP: Were they good deals?” Her Majesty’s Stationery Office, London.
National Audit Office. (2006). “The termination of the PFI contract for the national physical laboratory.” Her Majesty’s Stationery Office, London.
National Audit Office. (2009). “The failure of Metronet.” Her Majesty’s Stationery Office, London.
Nolan, B. (1994). Data analysis—An introduction, Polity Press, Cambridge, U.K.
Ogwueleka, A. C., and Maritz, M. J. (2013). “A review of incentive issues in the South African construction industry: The prospects and challenges.” Proc., ICCREM 2013: Construction and Operation in the Context of Sustainability, ASCE, Reston, VA, 83–98.
Overall, J. E., and Klett, C. J. (1972). Applied multivariate analysis, McGraw-Hill, New York.
Primavera [Computer software]. Redwood City, CA, Oracle Corporation.
Rahman, M. M., and Kumaraswamy, M. M. (2004). “Potential for implementing relational contracting and joint risk management.” J. Manage. Eng., 178–189.
Rahman, M. M., and Kumaraswamy, M. M. (2008). “Relational contracting and teambuilding: Assessing potential contractual and non-contractual incentives.” J. Manage. Eng., 48–63.
Rister, B. W., and Wang, Y. (2004). “Evaluation of current incentive/disincentive procedures in construction.” Kentucky Transportation Center, Univ. of Kentucky, Lexington, KY.
Rose, T., and Manley, K. (2010). “Client recommendations for financial incentives on construction projects.” Eng. Constr. Archit. Manage., 17(3), 252–267.
Schexnayder, C., and Anderson, S. (2010). “Emergency accelerated construction.” Proc., Construction Research Congress, J. Ruwanpura, Y. Mohamed, and S. Lee, eds., ASCE, Reston, VA, 837–848.
Segal, G. F., Moore, A. T., and McCarthy, S. (2003). “Contracting for road and highway maintenance.” Reason Public Policy Institute, Los Angeles.
Shen, L., Drew, D., and Zhang, Z. (1999). “Optimal bid model for price-time biparameter construction contracts.” J. Constr. Eng. Manage., 204–209.
Shr, J. F., and Chen, W. T. (2004). “Setting maximum incentive for incentive/disincentive contracts for highway projects.” J. Constr. Eng. Manage., 84–93.
SPSS [Computer software]. Armonk, NY, IBM.
Stukhart, G. (1984). “Contractual incentives.” J. Constr. Eng. Manage., 34–42.
Sun, C., Mackley, A., and Edara, P. (2014). “Programmatic examination of Missouri incentive/disincentive contracts for mitigating work zone traffic impacts.” J. Constr. Eng. Manage., 05013004.
Sun, M., and Meng, X. (2009). “Taxonomy for change causes and effects in construction projects.” Int. J. Proj. Manage., 27(6), 560–572.
Teo, E. A. L., Ling, F. Y. Y., and Chong, A. F. W. (2005). “Framework for project managers to manage construction safety.” Int. J. Proj. Manage., 23(4), 329–341.
Turner, R. J. (2004). “Farsighted project contract management: Incomplete in its entirety.” Constr. Manage. Econ., 22(1), 75–83.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 142Issue 2February 2016

History

Received: Aug 29, 2014
Accepted: Jun 18, 2015
Published online: Aug 7, 2015
Discussion open until: Jan 7, 2016
Published in print: Feb 1, 2016

Permissions

Request permissions for this article.

Authors

Affiliations

Operations Officer, Ramanmandi Dispatch Station, Hindustan Petroleum Corporation Limited, Bathinda, Punjab 151001, India (corresponding author). E-mail: [email protected]
Kumar Neeraj Jha [email protected]
Associate Professor, Dept. of Civil Engineering, Indian Institute of Technology-Delhi, Hauz Khas, New Delhi 110016, India. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share