4D Relationships: The Missing Link in 4D Scheduling
Publication: Journal of Construction Engineering and Management
Volume 142, Issue 2
Abstract
Four-dimensional (4D) schedules have proven successful in planning with their visualization capabilities allowing for coordination and time-space conflict detection. However, when considered in depth, internal aspects of 4D scheduling techniques have not made significant advances from traditional two-dimensional (2D) scheduling. What is missing from 4D scheduling? Why has the interaction between activities, their relationships, and three-dimensional (3D) components not been flexible and adaptive enough? In light of these questions, this paper analyzes the current state of 4D scheduling. The missing element in 4D scheduling is found to be 4D relationships (4DRs). A prototype of 4DRs has therefore been developed to improve 4D scheduling. Finally, guidance on the application of 4DRs in 4D scheduling is presented to help the users come to a thorough understanding of its advantages and disadvantages and potential applications.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002). “Representing work spaces generically in construction method models.” J. Constr. Eng. Manage., 296–305.
American Institute of Architects. (2013). “AIA document G202™–2013, project building information modeling protocol form.” 〈http://www.aia.org/groups/aia/documents/pdf/aiab095711.pdf〉 (Jan. 7, 2014).
BIMForum. (2013). “Level of development specification for building information models.” 〈http://bimforum.org/wp-content/uploads/2013/08/2013-LOD-Specification.pdf〉 (Jan. 7, 2014).
Dawood, N., and Sikka, S. (2008). “Measuring the effectiveness of 4D planning as a valuable communication tool.” ITcon, 13, 620–636.
Echeverry, D., Ibbs, C., and Kim, S. (1991). “Sequencing knowledge for construction scheduling.” J. Constr. Eng. Manage., 118–130.
Golparvar-Fard, M., Peña-Mora, F., and Savarese, S. (2012). “Automated progress monitoring using unordered daily construction photographs and IFC-based building information models.” J. Comput. Civ. Eng., 04014025.
Hegazy, T., and Menesi, W. (2010). “Critical path segments scheduling technique.” J. Constr. Eng. Manage., 1078–1085.
Joyce, E. (2014). “Construction CPM trends: 4D BIM claims taking off.” 〈http://enr.construction.com/opinions/viewpoint/2014/0205-construction-cpm-trends-4d-bim-claims-taking-off-.asp〉 (Apr. 7, 2014).
Kim, H., Anderson, K., Lee, S., and Hildreth, J. (2013). “Generating construction schedules through automatic data extraction using open BIM (building information modeling) technology.” Autom. Constr., 35, 285–295.
Koo, B., and Fischen, M. (2003). “Formalizing construction sequencing constraints for rapid generation of schedule alternatives.” Center for Integrated Facility Engineering (CIFE), Stanford Univ., Stanford, CA.
Lu, M., and Lam, H. (2009). “Transform schemes applied on non-finish-to-start logical relationships in project network diagrams.” J. Constr. Eng. Manage., 863–873.
Mahalingam, A., Kashyap, R., and Mahajan, C. (2010). “An evaluation of the applicability of 4D CAD on construction projects.” Autom. Constr., 19(2), 148–159.
O’Brien, J. J., and Plotnick, F. L. (2006). CPM in construction management, 6th Ed., McGraw-Hill, New York.
Tauscher, E. (2011). “Vom Bauwerksinformationsmodell zur Terminplanung: Ein Modell zur Generierung von Bauablaufplänen.” Ph.D. dissertation, Dept. of Civil Engineering and Construction, Bauhaus Universität Weimar, Germany.
Turkan, Y., Bosche, F., Haas, C. T., and Haas, R. (2012). “Automated progress tracking using 4D schedule and 3D sensing technologies.” Autom. Constr., 22, 414–421.
Information & Authors
Information
Published In
Copyright
© 2015 American Society of Civil Engineers.
History
Received: Feb 9, 2014
Accepted: Mar 16, 2015
Published online: Sep 7, 2015
Published in print: Feb 1, 2016
Discussion open until: Feb 7, 2016
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.