Technical Papers
Mar 26, 2014

Cost and Schedule Risk Analysis of Bridge Construction in Pakistan: Establishing Risk Guidelines

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 7

Abstract

The construction process is inherently prone to risks. Risk management is an essential and integral part of project management on virtually all construction projects. Risk analysis is one of the core components of risk management that enables professionals to quantify and analyze risks that may pose potential threats to project performance in terms of cost, quality, safety, and time. This research was conducted to identify and analyze risks associated with bridge construction in Pakistan. A questionnaire was conducted to collect data. Risks affecting bridge construction project performance were identified through interviews conducted with engineers and managers involved with various bridge projects. Cost and schedule impacts of project risks were supplemented by conducting a case study using the Monte Carlo simulation. The key findings indicate that financial risks were a major factor that affected cost and schedule objectives. The highest ranked factor identified was unavailability of funds with a relative importance index greater than 85. The results of the Monte Carlo simulation were compared to the actual completion times and costs of activities in the case study. In all cases of this comparison, the actual completion date and costs fell within the predicted distribution of the Monte Carlo simulation, indicating that risk analysis can help project managers to manage cost and schedule risks. Additionally, this study provided risk analysis guidelines, which were unclear. The results of this paper can help engineers, cost control managers, and project managers evaluate particular risks on their projects and avoid delays and cost overruns.

Get full access to this article

View all available purchase options and get full access to this article.

References

Ahmed, S. M., Lodi, S. H., and Farooqui, R. U. (2009). “Development of a strategic model for improvement of construction project management education, research, and practice in Pakistan.” The National Academics, Policy and Global Affairs, NW, Washington, DC, 278–339.
Akintoye, S. A., and MacLeod, M. J. (1997). “Risk analysis and management in construction.” Int. J. Proj. Manage., 15(1), 31–38.
Arain, F. M. (2008). “Leveraging on knowledge management approach for effective risk management in building projects.” Bus. Rev., 3(2), 49–63.
Black, C., Akintoye, A., and Fitzgerald, E. (2000). “An analysis of success factors and benefits of partnering in construction.” Int. J. Proj. Manage., 18(6), 423–434.
Carmines, E. G., and Zeller, R. A. (1979). Reliability and validity assessment, Sage Publications, Newbury Park, London, 45–50.
Chan, D. W. M., and Kumaraswamy, M. M. (1997). “A comparative study of causes of time overruns in Hong Kong construction projects.” Int. J. Proj. Manage., 15(1), 55–63.
Choudhry, R. M., and Iqbal, K. (2013). “Identification of risk management system in construction industry in Pakistan.” J. Manage. Eng., 42–49.
Dikemen, I., Birgonul, M. T., and Arikan, A. E. (2004). “A critical review of risk management support tools.” Proc., ARCOM 2004, Association of Researchers in Construction Management, Heriot Watt Univ., Edinburgh, U.K., 1145–1154.
Dillman, D. A. (2000). “Mail and Internet surveys: The tailored design method.” Rehabilitation counseling bulletin April 2001, Wiley, New York, 178–180.
Dillon, R. L., and Paté-Cornell, M. E. (2001). “APRAM: An advanced programmatic risk analysis method.” Int. J. Technol. Policy Manage., 1(1), 47–55.
Farooqui, R. U., Lodi, S. H., and Saleem, F. (2007). “Risk management and trends among construction contractors in Pakistan.” Proc., 4th Int. Conf. on Construction Industry in the 21st Century: Accelerating Innovation in Engineering Management and Technology (CITC IV 2007), Griffith Univ., Gold Coast, QLD.
Field, A. (2000). Discovering statistics using SPSS for Windows: Advanced techniques for the beginner, Sage Publications, London.
Flanagan, R., and Norman, G. (1993). Risk management and construction, Blackwell Scientific Publications, Osney Mead, Oxford, London.
George, D., and Mallery, P. (2006). SPSS for Windows step by step: A simple guide and reference, 17.0 update, Allyn & Bacon, Boston.
Ghosh, S., and Jintanapakanont, J. (2004). “Identifying and assessing the critical risk factors in an underground rail project in Thailand—A factor analysis approach.” Int. J. Proj. Manage., 22(8), 633–643.
Hinze, J. (2012). Construction planning and scheduling, 4th Ed., Prentice Hall, Upper Saddle River, NJ.
Imbeah, W., and Guikema, S. (2009). “Managing construction projects using the advanced programmatic risk analysis and management model.” J. Constr. Eng. Manage., 772–781.
Lian, Y., and Yen, C. B. (2003). “Comparison of risk calculation method for a culvert.” J. Hydraul. Eng., 140–152.
Loosemore, M., Raftery, J., Reilly, C., and Higgon, D. (2006). Risk management in projects, Taylor & Francis, London.
Masood, R., and Choudhry, R. M. (2010). “Identification of risk factors for construction contracting firms—Encompassing mitigation stance.” Proc., 2nd Int. Conf. on Construction in Developing Countries, Florida International Univ., Miami, NED Univ. of Engineering and Technology, Karachi, Services and Maintenance Construction Engineering Services, Cairo, Egypt.
Mulholland, B., and Christian, J. (1999). “Risk assessment in construction schedules.” J. Constr. Eng. Manage., 8–15.
Nasir, D., McCabe, B., and Hartono, L. (2003). “Evaluating risk in construction-schedule model (ERIC-S): Construction schedule risk model.” J. Constr. Eng. Manage., 518–527.
Nunnally, J. C. (1978). Psychometric theory, 2nd Ed., McGraw-Hill, New York.
Ökmen, Ö., and Öztas, A. (2008). “Construction project network evaluation with correlated schedule risk analysis model.” J. Constr. Eng. Manage., 49–63.
Owen, R., and Jones, R. (1994). Statistics, Pitman, London.
Raftery, J. (1994). Risk analysis in project management, E&FN Spon, London.
Reilly, J., and Brown, J. (2004). “Managing and control of cost and risk for tunneling and infrastructure projects.” Proc., Int. Tunneling Conf., Singapore, E & FN Spon, London, U.K., 703–712.
Reilly, J. J. (2005). “Cost estimating and risk management for underground projects.” Proc., Int. Tunneling Conf., International Tunneling Association, Istanbul.
Schuyler, J. (2001). Risk and decision analysis in projects, Project Management Institute, Newtown Square, PA.
Shash, A. A. (1993). “Factors considered in tendering decisions by top UK contractors.” Constr. Manage. Econ., 11(2), 111–118.
U.S. Department of the Navy. (1958). “PERT, program evaluation research task.” Phase 1 Summary Rep., Special Projects Office, Bureau of Ordnance, Washington, DC.
Williams, R. C., Walker, A. J., and Dorofee, A. J. (1997). “Putting risk management into practice.” IEEE Software, 14(3), 75–81.
Windows 17.0 [Computer software]. Chicago, IL, SPSS.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 7July 2014

History

Received: Apr 10, 2012
Accepted: Feb 18, 2014
Published online: Mar 26, 2014
Published in print: Jul 1, 2014
Discussion open until: Aug 26, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Rafiq M. Choudhry, Ph.D., M.ASCE [email protected]
P.E.
Professor, Construction Engineering and Management, Dept. of Civil and Environmental Engineering, College of Engineering, King Faisal Univ., Al-Ahsa-31982, Kingdom of Saudi Arabia; formerly, Professor and Head, Dept. of Construction Engineering and Management, School of Civil and Environmental Engineering, National Univ. of Sciences and Technology, Islamabad, Pakistan (corresponding author). E-mail: [email protected]; [email protected]
Mohammad A. Aslam [email protected]
Planning Engineer, Drake and Scull Construction, P.O. Box 9778, Riyadh 11423, Kingdom of Saudi Arabia; formerly, Graduate Student, Dept. of Construction Engineering and Management, School of Civil and Environmental Engineering, National Univ. of Sciences and Technology, Islamabad, Pakistan. E-mail: [email protected]
Jimmie W. Hinze, Ph.D., M.ASCE
Deceased; formerly, Professor, M. E. Rinker, Sr. School of Building Construction, Univ. of Florida, Gainesville, FL 32611-5703.
Faisal M. Arain, Ph.D. [email protected]
Associate Dean, School of Sustainable Building and Environmental Management, Northern Alberta Institute of Technology (NAIT), Edmonton, Canada T5G 2R1. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share