Technical Papers
Mar 25, 2014

Life Cycle Approach to Construction Workspace Modeling and Planning

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 7

Abstract

Workspace planning is critical for effective construction planning and control, and workspace modeling is an essential part of computer-aided workspace planning. The existing construction four-dimensional (4D) models, which have gained popularity in construction as an effective tool for planning, control, and communication, lack efficient means to capture the dynamic nature of workspaces to avoid potential workspace conflicts in future construction. This paper presents a life-cycle approach to workspace modeling and planning by first investigating the dynamic nature of the workspace requirements of construction activities and then introducing a conceptual framework to format space usages into life-cycle workspace evolution patterns. Specifically, an object-oriented data structure was designed and implemented to incorporate workspace representation into construction product models, and a workspace identification and adjustment method was created to facilitate the creation of construction workspaces. This newly created approach was tested in an implementation case study of a campus garage project with a number of application scenarios and was proven to be effective and convenient for modeling the dynamic workspace evolution associated with typical construction activities.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This presented research was partially funded by the US National Science Foundation (NSF) via Grant CMMI-1265895. The writers gratefully acknowledge NSF’s support. Any opinions, findings, conclusions, and recommendations expressed in this paper are those of the authors and do not necessarily reflect the views of the NSF or Purdue University.

References

Akinci, B., Fischer, M., Levitt, R., and Carlson, R. (2002a). “Formalization and automation of time-space conflict analysis.” J. Comput. Civ. Eng., 124–134.
Akinci, B., Fischer, M., Levitt, R., and Carlson, R. (2002b). “Automated generation of work spaces required by construction activities.” J. Constr. Eng. Manage., 306–315.
Akinci, B., Fischer, M., Kunz, J., and Levitt, R. (2002c). “Representing work spaces generically in construction method models.” J. Constr. Eng. Manage., 296–305.
Chavada, R., Dawood, N. N., and Kassem, M. (2012). “Construction workspace management: The development and application of a novel nD planning approach and tool.” J. Inform. Tech. Constr., 17, 213–236.
Collier, E., and Fischer, M. (1996). “Visual-based scheduling: 4D modeling on the San Mateo county health center.” Proc., Computing in Civil Engineering, J. Vanegas and P. Chinowsky, eds., ASCE, Reston, VA, 800–805.
Guo, S. (2002). “Identification and resolution of workspace conflicts in building construction.” J. Constr. Eng. Manage., 287–295.
Heesom, D., and Mahdjoubi, L. (2002). Visualization development for the virtual construction site, Univ. of Wolverhampton, West Midlands, U.K, 40.
Huang, T., Kong, C. W., Guo, H., Baldwin, A., and Li, H. (2007). “A virtual prototyping system for simulating construction processes.” Autom. Constr., 16(5), 576–585.
Li, H., et al. (2008). “Integrating design and construction through virtual prototyping.” Autom. Constr., 17(8), 915–922.
Li, H., Chan, N., Huang, T., Guo, H. L., Lu, W., and Skitmore, M. (2009). “Optimizing construction planning schedules by virtual prototyping enabled resource analysis.” Autom. Constr., 18(7), 912–918.
Mallasi, Z. (2006). “Dynamic quantification and analysis of the construction workspace congestion utilizing 4D visualization.” Autom. Constr., 15(5), 640–655.
Moon, H., Kang, L., Dawood, N., and Ji, S. (2009). “Configuration method of health and safety rule for improving productivity in construction space by multi-dimension CAD system.” ICCEM/ICCPM, S. Kwan, ed., KICEM, Korea.
Moon, H., Kim, H., Kim, C., and Kang, L. (2013). “Development of a schedule-workspace interference management system simultaneously considering the overlap level of parallel schedules and workspaces.” Autom. Constr., 39(1), 93–105.
North, S., and Winch, G. M. (2002). “VIRCON: A proposal for critical space analysis in construction planning.” Proc., 4th European Conf. on Product and Process Modeling in the Building and Related Industries (ECPPM), Z. Turk, and R. Scherer, eds., Swets & Zeitlinger, Lisse, 359–364.
Sanders, S. R., Thomas, H. R., and Smith, G. R. (1989). “An analysis of factors affecting labor productivity in masonry construction.” PTI # 9003, Pennsylvania State Univ., University Park, PA.
Williams, M. (1996). “Graphical simulation for project planning: 4D-planner.” 3rd Congress on Computing in Civil Engineering, J. Vanegas and P. Chinowsky, eds., ASCE, Reston, VA, 404–409.
Wu, I., and Chiu, Y. (2010). “4D Workspace conflict detection and analysis system.” Proc., 10th Int. Conf. on Construction Applications of Virtual Reality, K. Makanae, N. Yabuki, and K. Kashiyama, eds., The CONVR2010 Organizing Committee, Sendai, Japan.
Zhou, W., Heesom, D., Georgakis, P., Nwagboso, C., and Feng, A. (2009). “An interactive approach to collaborative 4D construction planning.” J. Inform. Tech. Constr., 14, 30–47.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 7July 2014

History

Received: Sep 30, 2013
Accepted: Feb 10, 2014
Published online: Mar 25, 2014
Published in print: Jul 1, 2014
Discussion open until: Aug 25, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Assistant Professor, Dept. of Construction, School of Engineering, Southern Illinois Univ. at Edwardsville, Edwardsville, IL 62025. E-mail: [email protected]
Hubo Cai, M.ASCE [email protected]
Assistant Professor, Division of Construction Engineering and Management, School of Civil Engineering, Purdue Univ., 550 Stadium Mall Dr., West Lafayette, IN 47907 (corresponding author). E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share