Strategic Procurement Practices for the Industrial Supply Chain
Publication: Journal of Construction Engineering and Management
Volume 140, Issue 7
Abstract
Early sourcing decisions have a critical impact on the performance of industrial construction projects. However, the industrial construction sector has been relatively understudied, especially the sourcing and supply chain practices typically implemented in early phases of capital projects. This study reports on how engineering-procure-construction (EPC) firms select suppliers in the early stages of the project. Particular focus involves the decisions firms make in sourcing process and the types and roles of supporting information. The paper reports on five case studies with large EPC firms. Data were collected from multiple individuals in each firm with extensive supporting documentation. A cross-case analysis describes similarities and differences between EPCs and helps to compare empirical findings with the broader literature. Findings contradict some areas of the literature, in particular the push for strategic supplier alliances. Other findings confirm the strategic importance of early procurement decisions to project performance and similarity across the types of decision drivers for supplier selection. Practitioners will find the case studies useful examples of current practice to compare with their corporate efforts. Researchers will similarly find details that extend extant literature, proposing new avenues for future research.
Get full access to this article
View all available purchase options and get full access to this article.
References
Azambuja, M. M., and O’Brien, W. J. (2012). “Rapid assessment and selection of engineered equipment suppliers.” Autom. Constr., 22, 587–596.
CII RR 172-11. (2002). “Improving capital projects supply chain performance.” The Construction Industry Institute, Austin, TX.
CII RR 257-11. (2009). “An analysis of global procurement and materials management practices in the construction industry.” The Construction Industry Institute, Austin, TX.
Cox, A., and Townsend, M. (1998). Strategic procurement in construction, Thomas Telford Publishing, London.
Davis, P. R., and Walker, D. H. T. (2009). “Building capability in construction projects: a relationship-based approach.” Eng. Construct. Architect. Manage., 16(5), 475–489.
Harper, D., and Bernold, L. (2005). “Success of supplier alliances for capital projects.” J. Constr. Eng. Manage., 979–985.
Jacoby, D. (2012). Optimal supply chain management in oil, gas and power generation, PennWell, Tulsa, OK.
O’Brien, W. J., Formoso, T., Vrijhoef, R., and London, K. A. (2008). Construction supply chain management handbook, CRC Press, Boca Raton, FL.
Pesämaa, O., Eriksson, P. E., and Hair, J. F. (2009). “Validating a model of cooperative procurement in the construction industry.” Int. J. Project Manage., 27(6), 552–559.
van der Velde, R. R., and van Donk, D. P. (2002). “Understanding bi-project management: Engineering complex industrial construction projects.” Int. J. Proj. Manage., 20(7), 525–533.
Vorster, M. C., Magrogan, S. A., and McNeil, B. W. (1998). “PEpC—A breakthrough project delivery system that improves performance by reforming owner, contractor, supplier relationships.”, CII, Austin, TX.
Yeo, K. T., and Ning, J. H. (2006). “Managing uncertainty in major equipment procurement in engineering projects.” Eur. J. Oper. Res., 171(1), 123–134.
Yin, R. K. (2003). Case study research: Design and methods, Sage Publications, London.
Information & Authors
Information
Published In
Copyright
© 2014 American Society of Civil Engineers.
History
Received: Apr 11, 2013
Accepted: Jan 30, 2014
Published online: Mar 10, 2014
Published in print: Jul 1, 2014
Discussion open until: Aug 10, 2014
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.