Case Studies
Jan 6, 2014

Achieving Sustainable Building Maintenance through Optimizing Life-Cycle Carbon, Cost, and Labor: Case in Hong Kong

Publication: Journal of Construction Engineering and Management
Volume 140, Issue 3

Abstract

The need to maintain an ever-increasing building stock especially in developed economies is growing. This study provides a computational framework to find the optimal solution for sustainable building maintenance. The methodology is composed of two major steps. First, the authors evaluate the life-cycle carbon emission, cost, and labor requirements of a project, which embody important environmental, economic, and social aspects of sustainable building maintenance. Second, the authors develop an optimization model to identify the optimal portfolio of materials that would minimize three sustainability objectives including carbon emission, cost, and labor deployment in their respective turns one at a time. By testing the model with seven scenarios in a case study, the authors demonstrate how this typical case project could significantly improve its sustainability objectives from environmental, economic, and social perspectives. This optimization methodology is generic. It can be readily applied to other new and nonresidential projects of varying scales and in circumstances with a different set of decision criteria. Finally, policy suggestions are proposed to promote sustainable building maintenance in Hong Kong.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors are grateful to the reviewers for their comments and suggestions. This study is funded by the Research Grants Council of Hong Kong Special Administrative Region (Project Reference Number: B-Q22V or RGC Number PolyU 5142/10E).

References

Architectural Services Dept. (ASD). (2010). “Schedule of rates for term contracts for building works, 2010 edition.” Architectural Services Dept., Government of Hong Kong Special Administrative Region, Hong Kong, China.
Balaras, C. A., Gaglia, A. G., Georgopoulou, E., Mirasgedis, S., Sarafidis, Y., and Lalas, D. P. (2007). “European residential buildings and empirical assessment of the Hellenic building stock, energy consumption, emissions and potential energy savings.” Build. Environ., 42(3), 1298–1314.
Bank of China. (2012). “Market information—Trading rates—T/T exchange rates against HKD.” 〈http://www.bochk.com/web/market/trading_rates/foreign_exchange_rates.xml?section=market&level_2=trading_rates&fldr_id=277〉 (Dec. 10, 2012).
Beijing Construction Project Pricing Management Center. (2001). Beijing Construction project estimation quota, China Architecture and Building Press, Beijing, China, (in Chinese).
Broadberry, S. N., and Irwin, D. A. (2006). “Labor productivity in the United States and the United Kingdom during the nineteenth century.” Explorations in Economic History, 43, 257–279.
Buildings Dept. (BD). (2012). “General guidelines on mandatory building inspection scheme and mandatory window inspection scheme.” Buildings Dept., Government of Hong Kong Special Administrative Region, Hong Kong, China.
Bielsa, J., and Duarte, R. (2011). “Size and linkages of the Spanish construction industry: Key sector or deformation of the economy?” Camb. J. Econ., 35(2), 317–334.
Census and Statistics Department (CSD). (2011), Hong Kong Annual Digest of Statistics, Census and Statistics Department, Government of Hong Kong Special Administrative Region, Hong Kong, China.
Boyce, C. J., Wood, A. M., and Brown, G. D. A. (2010). “The dark side of conscientiousness: Conscientious people experience greater drops in life satisfaction following unemployment.” J. Res. Pers., 44(4), 535–539.
Chan, A. P. C., Chiang, Y. H., Mak, S. W. K., Choy, L. H. T., and Wong, J. M. W. (2006). “Forecasting the demand of construction skills in Hong Kong.” Construct. Innovat., 6(1), 3–19.
Chiang, Y. H., Anson, M., and Raftery, J., (2004). The construction sector in Asian economies, Spon Press, London and New York.
Chui, K. W. (2010). “Comparison of construction labor productivity between U.S. and China: Using on-site productivity measurement method.” Ph.D. thesis, Dept. of Civil, Environmental, and Architectural Engineering, Univ. of Kansas, Lawrence, KS.
Construction Industry Institute, Hong Kong (CII-HK). (2008). Research summary of reinventing the Hong Kong construction industry for its sustainable development, Construction Industry Institute, Hong Kong.
Census, and Statistics Dept. (CSD). (2008). “Quarterly report on general household survey October to December 2008, Hong Kong: General household survey section (2).” Census and Statistics Dept., Government of Hong Kong Special Administrative Region, Hong Kong, China.
Census, and Statistics Dept. (CSD). (2012). “Quarterly report on general household survey July to September 2012, Hong Kong: General household survey section (2).” Census and Statistics Dept., Government of Hong Kong Special Administrative Region, Hong Kong, China.
Das, I., and Dennis, J. E. (1997). “A closer look at drawbacks of minimizing weighted sums of objectives for Pareto set generation in multicriteria optimization problems.” Struct. Optim., 14(1), 63–69.
Davis, L. (2011). Spon’s architects’ and builders’ price book, Spon Press, London.
Dept. of Construction of Guangdong. (2006). Guangdong construction engineering quota, China Planning Press, Beijing, China.
Diakaki, C., Grigoroudis, E., Kabelis, N., Kolokotsa, D., Kaltitzakis, K., and Stavrakakis, G. (2010). “A multi-objective decision model for the improvement of energy efficiency in buildings.” Energy, 35(12), 5483–5496.
Electrical, and Mechanical Services Dept. (EMSD). (2006). “Consultancy study on life cycle energy assessment (LCEA) of building developments. Consultancy agreement No. CAOL013—Consultancy study on life cycle energy assessment of building construction.” Ove Arup & Partners Hong Kong, Hong Kong, China.
Electrical, and Mechanical Services Dept., and Environmental Protection Dept. (EMSD, and EPD). (2008). “Guidelines to account for and report on greenhouse gas emissions and removals for buildings (commercial, residential or institutional purposes) in Hong Kong.” Electrical and Mechanical Services Dept. and Environmental Protection Dept., Government of Hong Kong Special Administrative Region, Hong Kong, China.
Fesanghary, M., Aside, S., and Zong, W. G. (2012). “Design of low-emission and energy-efficient residential buildings using a multi-objective optimization algorithm.” Build. Environ., 49, 245–250.
Frank R. Walker Company. (2006). Walker’s Building Estimator’s Reference Book, F. R. Walker, and J. Ranter, eds., 28th edition, Frank R. Walker Company, Illinois.
Government Bond Programme. (2011). “Daily government bond closing reference rates.” 〈http://www.solver.com/optimization.htm〉 (Oct. 7, 2011).
Gustavsson, L., and Satire, R. (2006). “Variability in energy and carbon dioxide balances of wood and concrete building materials.” Build. Environ., 41(7), 940–951.
Hammond, G. P., and Jones, C. I. (2008). “Embodied energy and carbon in construction materials.” Energy, 161(2), 87–98.
Hammond, G. P., and Jones, C. I. (2011). Inventory of carbon & energy (ICE) version 2.0, Sustainable Energy Research Team (SERT), Dept. of Mechanical Engineering, Univ. of Bath, U.K.
Hong Kong Housing Authority (HKHA). (2005). “Life cycle assessment and life cycle costing study of building materials and components.” The Hong Kong Housing Authority, Government of Hong Kong Special Administrative Region, Hong Kong, China.
Ip, H. W. (2011). “Towards low carbon housing development: Carbon emission estimation.” 2011 Conf. on Green Quality Management—Striving for lean and low carbon culture, Hong Kong Housing Department, Hong Kong, China.
Jie, T. R., and Wang, J. (2011). “Comparison study of carbon emission in transportation industry.” Integr. Transport., 8, 20–24.
Kemfert, C., and Welsch, H. (2000). “Energy-capital-labor substitution and the economic effects of CO2 abatement: Evidence for Germany.” J. Pol. Model., 22(6), 641–660.
Kelly, M. J. (2009). “Retrofitting the existing UK building stock.” Build. Res. Inf., 37(2), 196–200.
Kolokotsa, D., Diakaki, C., Grigoroudis, E., Stavrakakis, G., and Kalaitzakis, K. (2009). “Decision support methodologies on the energy efficiency and energy management in buildings.” Adv. Build. Energ. Res., 3(1), 121–146.
Lingo 14.0 [Computer software]. Chicago, Lindo Systems.
Lowe, R. (2007). “Addressing the challenges of climate change for the built environment.” Build. Res. Inf., 35(4), 343–350.
Raman, M. (2009). “Mitigating climate change: What America’s building industry must do.” Design intelligence, 〈http://www.di.net/articles/mitigating-climate-change-what-americas-building-industry-must-do/〉 (Apr. 8, 2013).
Nelson, A. J. (2008). Globalization and global trends in green real estate investment, RREEF Funds Research, San Francisco.
Office for National Statistics. (2012). International Comparisons of Productivity - 2010 - Final Estimates, Office for National Statistics, London, U.K.
Ouyang, J. L., Wang, C. Y., Li, H. F., and Hokao, K. (2011). “A methodology for energy-efficient renovation of existing residential buildings in China and case study.” Energ. Build., 43(9), 2203–2210.
Pearce, D. (2003). “The social and economic value of construction: The construction industry’s contribution to sustainable development 2003.” The Construction Industry Research and Innovation Strategy Panel, London, U.K.
Pearce, D. (2006). “Is the construction sector sustainable? Definitions and reflections.” Build. Res. Inf., 34(3), 201–207.
Samuelson, P., and Nordhaus, W. (2010). Economics, 19th Ed., McGraw-Hill Higher Education, New York.
Shen, Z. G., Jensen, W., Berryman, C., and Zhu, Y. M. (2011). “Comparative study of activity-based construction labor productivity in the United States and China.” J. Manage. Eng., 116–124.
Solver [Computer software]. Washington, DC, Microsoft Office.
Spain, B. J. D. (2010). Spon’s house improvement price book: House extensions, storm damage work, alterations, loft conversions, insulation and kitchens, Spon Press, London.
Tiwari, P. (2001). “Energy efficiency and building construction in India.” Build. Environ., 36(10), 1127–1135.
Tiwari, P. (2003). “Sustainable practices to meet shelter needs in India.” J. Urban Plann. Develop., 65–83.
Tiwari, P., Parikh, K., and Parikh, J. (1999). “Structural design considerations in house builders model: An optimisation approach.” J. Infrastruct. Syst., 102–110.
Tiwari, P., Parikh, J., and Sharma, V. (1996). “Performance evaluation of cost effective buildings—A cost, emissions and employment point of view.” Build. Environ., 31(1), 75–90.
Univ. of Bath. (2012). “Database helps lower construction’s carbon footprint.” 〈http://www.bath.ac.uk/research/features/embodiedenergy.html〉 (Apr. 8, 2013).
Verbeek, G., and Hens, H. (2007). “Life cycle optimization of extremely low energy dwellings.” J. Build. Phys., 31(2), 143–177.
World Green Building Council (WGBC). (2010). “Tackling global climate change meeting local priorities: A world green building council special report.” World Green Building Council, Toronto, Canada.
Wong, J. M. W., Chan, A. P. C., and Chiang, Y. H. (2005). “Time series forecasts of the construction labor market in Hong Kong: The Box-Jenkins approach.” Constr. Manage. Econ., 23(9), 979–991.
Wong, J. M. W., Chan, A. P. C., and Chiang, Y. H. (2008). “Modeling and forecasting construction labor demand: Multivariate analysis.” J. Constr. Eng. Manage., 664–672.
Wong, F. K. W., Hui, E. C. M., Wong, J. T. Y., and Wan, J. K. M. (2010). “The impact of urban renewal to the labour force in Hong Kong.” Facil. Des. Manage., 28(13–14), 611–640.
Wulfinghoff, D. R. (1999). Energy efficiency manual, Energy Institute Press, Wheaton, MD.
Yan, H., Shen, Q. P., Fan, L. C. H., Wang, Y., and Zhang, L. (2010). “Greenhouse gas emission in building construction: A case study of one peking in Hong Kong.” Build. Environ., 45(4), 949–955.
Zhao, L., and Huang, Y. (2009). “Unemployment and social instability in China: Will they run out of control? East Asian Institute Background Brief No. 439.” National Univ. of Singapore, Singapore.
Zhang, C. X., Zhang, B. B., Huang, Y. L., Jiang, Y. H., and Yuan, Y. (2010). “Determining energy carbon emission factors for building.” Constr. Manage. Econ, 10, 106–109.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 140Issue 3March 2014

History

Received: May 30, 2013
Accepted: Nov 19, 2013
Published online: Jan 6, 2014
Published in print: Mar 1, 2014
Discussion open until: Jun 6, 2014

Permissions

Request permissions for this article.

Authors

Affiliations

Y. H. Chiang [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., ZS738, Hong Kong. E-mail: [email protected]
Research Associate, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., ZS738, Hong Kong (corresponding author). E-mail: [email protected]
Research Fellow, Dept. of Public Policy, City Univ. of Hong Kong, ZS738, Hong Kong. E-mail: [email protected]
P. T. I. Lam [email protected]
Associate Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., ZS738, Hong Kong. E-mail: [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., ZS738, Hong Kong. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share