Technical Papers
Mar 1, 2013

Developing Fuzzy Enterprise Risk Management Maturity Model for Construction Firms

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 9

Abstract

Construction firms have been seen as prime candidates for enterprise risk management (ERM) adoption. The ERM maturity assessment helps them to identify weak areas of their ERM implementation and to prioritize resources to improve these areas. The objectives of this paper are to identify the ERM best practices and important ERM maturity criteria in Chinese construction firms (CCFs) and to develop an ERM maturity model for CCFs. Through an in-depth literature review and a questionnaire survey conducted with 89 professionals, a total of 66 applicable ERM best practices and 16 important maturity criteria were identified and thus used in the proposed model. The results indicated that commitment of the board and senior management; risk identification, analysis, and response; and objective setting were the top three most important criteria. In addition, this model adopts the fuzzy set theory to quantify the implementation levels of the best practices. Moreover, this model was applied in a CCF based in Singapore and the output result was consistent with its current ERM practice. Although this paper focuses on CCFs, it helps other construction firms to prepare their customized model using the best practices and criteria identified in this paper, contributing to the global body of knowledge relating to ERM.

Get full access to this article

View all available purchase options and get full access to this article.

References

Aabo, T., Fraser, J. R. S., and Simkins, B. J. (2005). “The rise and evolution of the chief risk officer: Enterprise risk management at Hydro One.” J. Appl. Corporate Finance, 17(3), 62–75.
Adibi, S. (2007). “Industry should embrace risk management tools.” New York Construction News, 〈http://newyork.construction.com/opinions/bottomline/archive/2007/06.asp〉 (Feb. 12, 2011).
Aon. (2010). Global risk management survey 2010, Chicago.
Barton, T. L., Shenkir, W. G., and Walker, P. L. (2002). Making enterprise risk management pay off, Prentice Hall, Upper Saddle River, NJ.
Cendrowski, H., and Mair, W. C. (2009). Enterprise risk management and COSO: A guide for directors, executives, and practitioners, Wiley, Hoboken, NJ.
Chou, S. Y., and Chang, Y. H. (2008). “A decision support system for supplier selection based on a strategy-aligned fuzzy SMART approach.” Expert Syst. Appl., 34(4), 2241–2253.
Ciorciari, M., and Blattner, P. (2008). “Enterprise risk management maturity-level assessment tool.” 2008 Enterprise Risk Management Symp., Society of Actuaries, Schaumburg, IL.
Committee of Sponsoring Organizations of the Treadway Commission (COSO). (2004). Enterprise risk management—Integrated framework: Executive summary & framework, Jersey City, NJ.
Cox, E. (1998). The fuzzy systems handbook, AP Professional, Boston.
Dafikpaku, E. (2011). “The strategic implications of enterprise risk management: A framework.” 2011 Enterprise Risk Management Symp., Society of Actuaries, Schaumburg, IL.
Deloitte Touche Tohmatsu. (2010). Enterprise risk management (ERM): Success through intelligent risk taking, Beirut, Lebanon.
Dickinson, G. (2001). “Enterprise risk management: Its origins and conceptual foundation.” The Geneva Papers on Risk and Insurance: Issues and Practice, 26(3), 360–366.
Driankov, D., Hellendoorn, H., and Reinfrank, M. (1996). An introduction to fuzzy control, Springer, New York.
Druml, D. (2009). “Contractors: Are you adopting ERM or still stuck in the mud?” Druml Group, 〈http://www.druml.com/about/articles2009/04/contractors-enterprise-risk-management-adoption-construction-risk-management/〉 (Jun. 3, 2011).
Duckert, G. H. (2011). Practical enterprise risk management: A business process approach, Wiley, Hoboken, NJ.
Economist Intelligence Unit (EIU). (2007). Best practice in risk management, London.
Fitzgerald, D. (2006). “Best practices in ERM.” Cutter Consortium Enterprise Risk Management & Governance Executive Update, 3(19), 1–4.
Garvey, P. R. (2008). Analytical methods for risk management, CRC Press, Boca Raton, FL.
Gates, S. (2006). “Incorporating strategic risk into enterprise risk management: A survey of current corporate practice.” J. Appl. Corporate Finance, 18(4), 81–90.
Gordon, L. A., Loeb, M. P., and Tseng, C. Y. (2009). “Enterprise risk management and firm performance: A contingency perspective.” J. Accounting Public Policy, 28(4), 301–327.
Hallowell, M. R., Molenaar, K. R., and Fortunato, B. R. (2013). “Enterprise risk management strategies for state departments of transportation.” J. Manage. Eng., 29(2), 114–121.
Hofstede, G., Hofstede, G. J., and Minkov, M. (2010). Cutures and organizations: Software of the mind, McGraw-Hill, New York.
Hoyt, R. E., and Liebenberg, A. P. (2011). “The value of enterprise risk management.” J. Risk Insurance, 78(4), 795–822.
International Organization for Standardization (ISO). (2009). “Risk management—Principles and guidelines.”, Geneva.
Kleffner, A. E., Lee, R. B., and McGannon, B. (2003). “The effect of corporate governance on the use of enterprise risk management: Evidence from Canada.” Risk Manage. Insurance Rev., 6(1), 53–73.
Klic, G. I., and Yan, B. (1995). Fuzzy sets and fuzzy logic theory and applications, Prentice Hall, London.
Lam, J. (2003). Enterprise risk management: From incentives to controls, Wiley, Hoboken, NJ.
Lam, K. C., Tao, R., and Lam, M. C. K. (2010). “A material supplier selection model for property developers using fuzzy principal component analysis.” Autom. Constr., 19(5), 608–618.
Loosemore, M. (2006). Risk management in projects, Tayor & Francis, New York.
Low, S. P., and Shi, Y. (2002). “An exploratory study of Hofstede’s cross-cultural dimensions in construction projects.” Manage. Dec., 40(1), 7–16.
Miller, G. A. (1956). “The magical number seven, plus or minus two: Some limits on our capacity for processing information.” Psychol. Rev., 63(2), 81–97.
Muralidhar, K. (2010). “Enterprise risk management in the Middle East oil industry: An empirical investigation across GCC countries.” Int. J. Energy Sector Manage., 4(1), 59–86.
National Bureau of Statistics of China (NBSC). (2012). China statistical yearbook 2012, China Statistics Press, Beijing.
Negnevitsky, M. (2006). Artificial intelligence: A guide to intelligent systems, Pearson Education, New York.
Nieto-Morote, A., and Ruz-Vila, F. (2011). “A fuzzy approach to construction project risk assessment.” Int. J. Project Manage., 29(2), 220–231.
Nocco, B. W., and Stulz, R. M. (2006). “Enterprise risk management: Theory and practice.” J. Appl. Corporate Finance, 18(4), 8–20.
Nunnally, J. C. (1978). Psychometric theory, McGraw-Hill, New York.
Olson, D. L., and Wu, D. D. (2008). Enterprise risk management, World Scientific, Singapore.
Pedrycz, W., Ekel, P., and Parreiras, R. (2011). Fuzzy multicriteria decision-making: Models, methods and applications, Wiley, Chichester, UK.
Risk, and Insurance Management Society (RIMS). (2008). RIMS State of ERM Rep. 2008, New York.
Santori, L., Bevan, K., and Myers, C. (2007). Summary of Standard & Poor’s enterprise risk management evaluation process for insurers, Standard & Poor’s, New York.
Schaufelberger, J. (2009). Construction business management, Pearson Prentice Hall, Upper Saddle River, NJ.
Segal, S. (2011). Corporate value of enterprise risk management, Wiley, Hoboken, NJ.
Stroh, P. J. (2005). “Enterprise risk management at UnitedHealth Group.” Strategic Finance, 87(1), 26–35.
Tah, J. H. M., and Carr, V. (2000). “A proposal for construction project risk assessment using fuzzy logic.” Constr. Manage. Econ., 18(4), 491–500.
Ward, J. (2006). ERM: Evolving, resonating, and maturing down under, Standard & Poor’s, New York.
Wu, D., and Olson, D. L. (2008). “Enterprise risk management: Financial and accounting perspectives.” New frontiers in enterprise risk management, D. L. Olson and D. Wu, eds., Springer, Heidelberg, Germany, 25–38.
Xia, B., Chan, A. P. C., and Yeung, J. F. Y. (2011). “Developing a fuzzy multicriteria decision-making model for selecting design-build operational variations.” J. Constr. Eng. Manage., 137(12), 1176–1184.
Xu, Y., Chan, A. P. C., and Yeung, J. F. Y. (2010). “Developing a fuzzy risk allocation model for PPP projects in China.” J. Constr. Eng. Manage., 136(8), 894–903.
Zhao, X., Hwang, B. G., and Low, S. P. (2011). “Enterprise risk management of Chinese construction firms based in Singapore: A research proposal.” Proc., Int. Construction Business & Management Symp. 2011, Universiti Teknologi Malaysia, Kuala Lumpur, Malaysia.
Zhao, X., Hwang, B. G., and Low, S. P. (2012). “Implementing enterprise risk management in a Chinese construction firm based in Singapore.” Proc., World Construction Conf. 2012 (CIB W107), Ceylon Institute of Builders (CIOB), Pitakotte, Sri Lanka, 434–444.
Zimmermann, H. J. (2001). Fuzzy set theory—And its applications, Kluwer Academic, Boston.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 9September 2013
Pages: 1179 - 1189

History

Received: Oct 16, 2012
Accepted: Feb 27, 2013
Published online: Mar 1, 2013
Discussion open until: Aug 1, 2013
Published in print: Sep 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Xianbo Zhao [email protected]
Ph.D. Candidate, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566 (corresponding author). E-mail: [email protected]
Bon-Gang Hwang [email protected]
A.M.ASCE
Assistant Professor, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566. E-mail: [email protected]
Sui Pheng Low [email protected]
Professor, Dept. of Building, National Univ. of Singapore, 4 Architecture Dr., Singapore 117566. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share