Quality Costs in Construction: Case of Qom Monorail Project in Iran

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 9

Abstract

The effectiveness of a quality program implemented during the initial 18 months of the Qom monorail project in Iran is examined. A quality costing exercise was undertaken, and it was revealed that quality failures accounted for 0.05% of the project’s contract value. The contractor’s experiences in implementing and analyzing its quality costs offer a learning opportunity for companies seeking a competitive advantage by implementing quality improvement programs.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors would like to thank the Projects Quality Control Management office of the Kayson Company for its participation in this study. Appreciation is extended as well to the Qom monorail project; without its cooperation and full support from senior management and the project managers involved, this investigation could not have been undertaken.

References

Abdelsalam, H. M. E., and Ghad, M. M. (2009). “Cost of quality in Dubai: An analytical case study of residential construction projects.” Int. J. Project Manage., 27(5), 501–511.
Abdul-Rahman, H. (1993). “Capturing the cost of quality failures in civil engineering.” Int. J. Qual. Reliab. Manage., 10(3), 20–32.
Abdul-Rahman, H. (1995). “The cost of non-conformance during a highway project: a case study.” Constr. Manage. Econ., 13(1), 23–32.
Assaf, S. A., Bubshait, A. A., Atiyah, S., and Al-Shahri, M. (2001). “The management of construction company overhead costs.” Int. J. Project Manage., 19(5), 295–303.
Banks, J. (1992). The essence of total quality management, Prentice-Hall, Englewood Cliffs, NJ.
Barber, P., Graves, A., Hall, M., Sheath, D., and Tomkins, C. (2000). “Quality failure costs in civil engineering projects.” Int. J. Qual. Reliab. Manage., 17(4/5), 479–492.
Burati, J. L., Farrington, J. J., and Ledbetter, W. B. (1992). “Causes of quality deviations in design and construction.” J. Constr. Eng. Manage., 118(1), 34–49.
Chen, J., Yang, L., Chen, W. H., and Chang, C. K. (2008). “Case-based allocation of onsite supervisory manpower for construction projects.” Constr. Manage. Econ., 26(8), 805–814.
Cnuddle, M. (1991). “Lack of quality in construction: Economic losses.” Proc., 1991 European Symp. on Management, Quality and Economics in Housing and Other Building Sectors, Lisbon, Portugal, 508–515.
Davis, K., Ledbetter, W. B., and Burati, J. L. (1989). “Measuring design and construction quality costs.” J. Constr. Eng. Manage., 115(3), 385–400.
Dept. of Industry, Science, and Tourism. (1998). Building for growth: A draft strategy for the building and construction industry, Commonwealth of Australia Publication, Canberra, Australian Capital Territory, Australia.
Dolan, S. L., and Schuler, R. S. (1987). Personnel and human resource management in Canada, West Publishing, St.-Paul, MN.
Egan, J. (1998). Rethinking construction, Construction Task Force Rep., Dept. of the Environment, Transport and the Regions, London.
Feigenbaum, A. V. (1991). Total quality control, 3rd Ed., McGraw-Hill, New York.
Hammarlund, Y., and Josephson, P. E. (1991). “Sources of quality failures in building.” Proc., European Symp. on Management, Quality and Economics in Housing and Other Building Sectors, Lisbon, Portugal, 671–679.
Holland, N. L., and Hobson, D. (1999). “Indirect cost categorization and allocation by construction contractors.” J. Archit. Eng., 5(2), 49–56.
Hwang, B. G., Thomas, S. R., Haas, C. T., and Caldas, C. H. (2009). “Measuring the impact of rework on construction cost performance.” J. Constr. Eng. Manage., 135(3), 187–198.
Jallon, R., Imbeau, D., and Marcellis-Warin, N. (2011). “Development of an indirect-cost calculation model suitable for workplace use.” J. Saf. Res., 42(3), 149–164.
Josephson, P. E., Larrson, B., and Li, H. (2002). “Illustrative benchmarking rework and rework costs in the Swedish construction industry.” J. Manage. Eng., 18(2), 76–83.
Kayson Company Official Website. (2011). “Projects, Qom Monorail Project, Phase 1, Line 1http://www.kayson-ir.com/project.aspx?name=monorail&cat=trans〉 (Sep. 2, 2012).
Love, P. E. D., Edwards, D. J., and Irani, Z. (2008). “Forensic project management: An exploratory examination of the causal behavior of design-induced error.” IEEE Trans. Eng. Manage., 55(2), 234–248.
Love, P. E. D., and Li, H. (2000a). “Quantifying the causes and costs of rework in construction.” Constr. Manage. Econ., 18(4), 479–490.
Love, P. E. D., and Li, H. (2000b). “Overcoming the problems associated with quality certification.” Constr. Manage. Econ., 18(2), 139–149.
Love, P. E. D., Lopez, R., and Edwards, D. J. (2013). “Reviewing the past to learn in the future: Making sense of design errors and failures in construction.” Struct. Infrastruct. Eng., 9(7), 675–688.
Love, P. E. D., Lopez, R., Edwards, D. J., and Goh, Y. (2012). “Systemic modeling of design errors in social infrastructure projects.” Accid. Anal. Prev., 48, 100–110.
Love, P. E. D., and Sing, C. P. (2013). “Determining the probability distribution of rework costs in construction and engineering projects.” Struct. Infrastruct. Eng., in press.
Low, S. P., and Yeo, H. K. C. (1998). “A construction quality costs quantifying system for the building industry.” Int. J. Qual. Reliab. Manage., 15(3), 329–349.
Love, P. E. D.Smith, J., and Li, H. (1999). “The propagation of rework benchmark metrics for construction.” Int. J. Qual. Reliab. Manage., 16(7), 638–658.
National Planning, and Management Organization. (2000)., Tehran, Iran.
Palaneeswaran, E., Love, P. E. D., Kumaraswamy, M., and Ng, T. (2008). “Mapping rework causes and effects using artificial neural networks.” Build. Res. Inf., 36(5), 450–465.
Pulver, H. E. (1989). Construction estimates and costs, McGraw-Hill, New York.
Robinson-Fayek, A., Dissanayake, M., and Campero, O. (2004). “Developing a standard methodology for measuring and classifying construction fieldwork.” Can. J. Civ. Eng., 31(6), 1077–1089.
Rogge, D. F., Cogliser, C., Alaman, H., and McCormack, S. (2001). RR153-11 an investigation of field rework in industrial construction, Construction Industry Institute, Austin, Texas.
Serpell, A. (1999). “Integrating quality systems in construction projects: The Chilean case.” Int. J. Project Manage., 17(5), 317–322.
Wang, J., Liu, J., and Huang, L. (2007). “Study on the professional liability insurance system of the supervision engineer in China.” Constr. Manage. Econ., 25(7), 801–810.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 9September 2013
Pages: 1244 - 1249

History

Received: Oct 11, 2012
Accepted: Feb 17, 2013
Published online: Feb 19, 2013
Discussion open until: Jul 19, 2013
Published in print: Sep 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Amirhosein Jafari [email protected]
Quality Control Specialist, Kayson Company, Projects Quality Control Office, 19987 17487 Tehran, Iran; and Postgraduate Scholar, School of Civil Engineering, College of Engineering, Univ. of Tehran, Tehran, Iran (corresponding author). E-mail: [email protected]
Peter E. D. Love [email protected]
John Curtin Distinguished Professor, Curtin Univ., GPO Box U1987, Perth, WA 6845, Australia. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share