Relationship between Owners’ Capabilities and Project Performance on Development of Hydropower Projects in China
Publication: Journal of Construction Engineering and Management
Volume 139, Issue 9
Abstract
Existing studies tend to agree that there are links between owners’ capabilities and project performance. However, limited research has systematically addressed the relationships among the multiple facets of organizational capabilities and project performance. This paper quantitatively investigated the relationships among them by developing and testing a capability model. With support of data collected from the hydropower project industry in China, this study has revealed strong correlations between owners’ capabilities and project performances, confirming owners’ capabilities on obtaining scarce and valued resources, interorganizational linking, information management, and integrating and managing resources can have significant impacts on hydropower project performances. It is concluded that these owners’ capabilities are not only important to improve project performances on quality, time, cost, and safety by maximizing the effectiveness of each participant’s resources, but also critical to appropriately deal with hydropower projects’ externalities for achieving the objectives on project migration, and ecological and environmental impacts. Future studies should be conducted to understand how owners can correctly perceive the properties of external environments for obtaining resources, and to successfully integrate and manage reciprocally interdependent project delivery processes at both intra- and interorganizational levels to achieve superior project performance.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
Many thanks are given to the National Natural Science Foundation of China (Grant Nos. 51079070, 50539130, 70671058), State Key Laboratory of Hydroscience and Engineering (Grant Nos. 2013-KY-5, 2009-ZY-7), and the Education Ministry of China (Grant No. 20091011294). Special thanks are also given to the respondents for their contributions during the survey.
References
Akintoye, A. S., and Macleod, M. J. (1997). “Risk analysis and management in construction.” Int. J. Proj. Manage., 15(1), 31–38.
Ancona, D., Kochan, T. A., Scully, M., Maanen, J. V., and Westney, D. E. (2005). Managing for the future: organizational behavior & processes, Thomson Learning, Mason, OH.
Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2004). “Performance measurement in construction.” J. Manage. Eng., 20(2), 42–50.
Bossink, B. A. G. (2004). “Managing drivers of innovation in construction networks.” J. Constr. Eng. Manage., 130(3), 337–345.
Bresnen, M., and Marshall, N. (2000). “Motivation, commitment and the use of incentives in partnerships and alliances.” Constr. Manage. Econ., 18(5), 587–598.
Chan, A. P. C., Chan, D. W. M., Fan, L. C. N., Lam, P. T. I., and Yeung, J. F. Y. (2008). “Achieving partnering success through an incentive agreement: Lessons learned from an underground railway extension project in Hong Kong.” J. Manage. Eng., 24(3), 128–137.
Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., and Wong, J. M. W. (2010). “Empirical study of the risks and difficulties in implementing guaranteed maximum price and target cost contracts in construction.” J. Constr. Eng. Manage., 136(5), 495–507.
Chang, X., Liu, X., and Zhou, W. (2010). “Hydropower in China at present and its further development.” Energy, 35(11), 4400–4406.
Charoenngam, C., and Yeh, C. (1999). “Contractual risk and liability sharing in hydropower construction.” Int. J. Proj. Manage., 17(1), 29–37.
Cheah, C. Y. J., Garvin, M. J., and Miller, J. B. (2004). “Empirical study of strategic performance of global construction firms.” J. Constr. Eng. Manage., 130(6), 808–817.
Cheng, E., Li, H., Drew, D. S., and Yeung, N. (2001). “Infrastructure of partnering for construction projects.” J. Manage. Eng., 17(4), 229–237.
Chew, D. A. S., Yan, S., and Cheah, C. Y. J. (2008). “Core capability and competitive strategy for construction SMEs in China.” Chinese Management Studies, 2(3), 203–214.
Construction Industry Institute (CII). (1991). In search of partnering excellence, Construction Industry Development Agency, Melbourne, Australia.
Cooke-Davies, T. (2002). “The real success factors on projects.” Int. J. Proj. Manage., 20(3), 185–190.
Daft, R. L. (2010). Organization theory and design, South-Western Cengage Learning, Mason, OH.
Dainty, A. R. J., Cheng, M., and Moore, D. R. (2005). “Competency-Based model for predicting construction project managers’ performance.” J. Manage. Eng., 21(1), 2–9.
DeVibiss, C. E., and Leonard, P. (2000). “Partnering is the foundation of a learning organization.” J. Manage. Eng., 16(4), 47–57.
Dikmen, I., Birgonul, M. T., and Kiziltas, S. (2005). “Prediction of organizational effectiveness in construction companies.” J. Constr. Eng. Manage., 131(2), 252–261.
El-Mashaleh, M., O’Brien, W. J., and Minchin, R. E., Jr. (2006). “Firm performance and information technology utilization in the construction industry.” J. Constr. Eng. Manage., 132(5), 499–507.
Energy Enterprises Association of China. (2007). China electricity industry development year report, China Electricity Press, Beijing.
Fellows, C., and Liu, A. (1997). Research methods for construction, Blackwell Science, Oxford, UK.
Growley, L. G., and Karim, M. A. (1995). “Conceptual model of partnering.” J. Manage. Eng., 11(5), 33–39.
Hong, Y., Chan, D. W. M., Chan, A. P. C., and Yeung, J. F. Y. (2012). “Critical analysis of partnering trend in construction journals.” J. Manage. Eng., 28(2), 82–95.
Huang, Z. (1995). Factors analysis in medical application, Hunan Science and Technology Press, Changsha, China.
Isik, Z., Arditi, D., Dikmen, I., and Birgonu, l. M. T. (2010). “Impact of resources and strategies on construction company performance.” J. Manage. Eng., 26(1), 9–18.
Jaccard, J., and Becker, M. A. (1997). Statistics for the behavioral sciences, International Thomson Publishing Incorporated, Melbourne, Australia.
Kadefors, A. (2004). “Trust in project relationships—inside the black box.” Int. J. Proj. Manage., 22(3), 175–182.
Li, H., Cheng, E. W. L., and Love, P. D. (2000). “Partnering research in construction.” Eng. Construct. Architect. Manage., 7(1), 76–92.
Lim, B. T. H., Ling, F. Y. Y., Ibbs, C. W., Raphael, B., and Ofori, G. (2011). “Empirical analysis of the determinants of organizational flexibility in the construction business.” J. Constr. Eng. Manage., 137(3), 225–237.
Love, P. E. D., Davis, P. R., Chevis, R., and Edwards, D. J. (2011). “Risk/reward compensation model for civil engineering infrastructure alliance projects.” J. Constr. Eng. Manage., 137(2), 127–136.
Love, P. E. D., Holt, G. D., and Li, H. (2002). “Triangulation in construction management research.” Eng. Construct. Architect. Manage., 9(4), 294–303.
Lu, Y. (2005). “Construction management practice on the Three Gorges Project.” Proc., 1st Greater China Project Management Summit, Tsinghua Univ., Beijing, 13–26.
McElroy, M. B., Lu, S., Nielsen, C. P., and Wang, Y. (2009). “Potential for wind-generated electricity in China.” Science, 325(5946), 1378–1380.
Mitropoulos, P., and Namboodiri, M. (2011). “New method for measuring the safety risk of construction activities: Task demand assessment.” J. Constr. Eng. Manage., 137(1), 30–38.
Murray, P., and Chapman, R. (2003). “From continuous improvement to organizational learning: Developmental theory.” Learn. Organ., 10(5), 272–282.
Nadler, D. A., and Tushman, M. L. (1997). Competing by design: The power of organizational architecture, Oxford University Press, Oxford, UK.
Piao, S., et al. (2010). “The impacts of climate change on water resources and agriculture in China.” Nature, 467(7311), 43–51.
Rahman, M. M., and Kumaraswamy, M. M. (2008). “Relational contracting and teambuilding: assessing potential contractual and noncontractual incentives.” J. Manage. Eng., 24(1), 48–63.
Salaman, G., and Asch, D. (2003). Strategy and capability sustaining organizational change, Blackwell Publishing, Oxford, UK.
SPSS Incorporated. (1997). SPSS base 7.5 for Windows User’s guide, Statistical Package for Social Science Incorporated, Chicago.
Tang, W., Duffield, C. F., and Young, D. M. (2006). “Partnering mechanism in construction: an empirical study on the Chinese construction industry.” J. Constr. Eng. Manage., 132(3), 217–229.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., and Lu, Y. (2007). “Risk management in the Chinese Construction Industry.” J. Constr. Eng. Manage., 133(12), 944–956.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., and Lu, Y. (2008). “Incentives in the Chinese construction industry.” J. Constr. Eng. Manage., 134(7), 457–467.
Tang, W., Qiang, M., Duffield, C. F., Young, D. M., and Lu, Y. (2009). “Enhancing Total Quality Management by partnering in construction.” J. Prof. Issues Eng. Educ. Pract., 135(4), 129–141.
Thomas, R. (1996). “Surveys.” Research methods: Guidance for postgraduates, Arnold, London, 115–124.
Vörösmarty, C. J., et al. (2010). “Global threats to human water security and river biodiversity.” Nature, 467(7315), 555–561.
Wethyavivorn, P., Charoenngam, C., and Teerajetgul, W. (2009). “Strategic assets driving organizational capabilities of Thai construction firms.” J. Constr. Eng. Manage., 135(11), 1222–1231.
Wong, P. S. P., Cheung, S. O., and Fan, K. L. (2009). “Examining the relationship between organizational learning styles and project performance.” J. Constr. Eng. Manage., 135(6), 497–507.
Yu, J., Lee, H., and Kim, W. (2006). “Evaluation model for information systems benefits in construction management processes.” J. Constr. Eng. Manage., 132(10), 1114–1121.
Zhu, E., and Zhao, G. (2002). Water resources development strategies in China, China Water Conservancy and Hydropower Press, Beijing.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Jul 3, 2012
Accepted: Feb 5, 2013
Published online: Feb 7, 2013
Discussion open until: Jul 7, 2013
Published in print: Sep 1, 2013
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.