Case Studies
Dec 21, 2012

Preliminary Engineering Cost Estimation Model for Bridge Projects

Publication: Journal of Construction Engineering and Management
Volume 139, Issue 9

Abstract

This paper addresses one of the costs of new bridges, i.e., the cost of doing the preliminary engineering (PE). This particular aspect of cost has largely been neglected because of the difficulty in obtaining appropriate data. Typically, PE costs are determined as a percentage of construction costs, disregarding other project-specific parameters. Bridge projects let by the North Carolina (NC) DOT between 2001 and 2009 were reviewed. From an analysis of these 461 projects, the writers developed statistical models linking variation in PE costs with distinctive project parameters. The primary contribution this paper makes to the body of knowledge is the finding that PE cost estimates for bridge projects are commonly and significantly underestimated. The writers found that bridge projects exhibited a mean PE cost ratio of 28%. This result is significantly greater than the percentage used in practice. An investigation of data sources related to bridge projects, a description of regression techniques applied to predict the PE cost of such projects, and an assessment of the predictive performance of models are addressed in this paper. New knowledge contributions include identification of key factors affecting the PE costs of bridges, illustration of how those key factors enabled us to predict PE costs of future projects, and discussion of the data collection problems that hindered model development. The writers’ PE cost analyses and predictive modeling effort relate to infrastructure funding issues. All of the parties involved in infrastructure construction, from legislators to contractors, must understand costs and have confidence in the cost estimates developed to ensure efficient and effective funding of infrastructure projects. This paper on bridge PE costs addresses one component of infrastructure funding.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers acknowledge the project support provided by the NCDOT Research and Development Unit. Key NCDOT units providing guidance include the Program Development Branch, Structure Inventory and Appraisal Unit, and Schedule Management Office. Many additional NCDOT personnel provided suggestions and insights. Their contributions positively influenced this research effort. The writers also thank the Southeastern Transportation Center, the initial support from which was instrumental in transitioning this research topic into a funded project.
The contents of this paper reflect the views of the writers and not necessarily the views of North Carolina State University or East Carolina University. The writers are responsible for the facts and the accuracy of the data presented in this paper. The contents do not necessarily reflect the official views or policies of either the North Carolina Department of Transportation or the Federal Highway Administration at the time of publication.

References

Anderson, S., Molenaar, K. R., and Schexnayder, C. J. (2007). “Guidance for cost estimation and management for highway projects during planning, programming, and preconstruction.”, Transportation Research Board, Washington, DC.
Baskerville, J. C., and Toogood, J. H. (1982). “Guided regression modeling for prediction and exploration of structure with many explanatory variables.” Technometrics, 24(1), 9–17.
Cohen, R. A. (2006). “Introducing the GLMSELECT procedure for model selection.” Proc., Statistical Analysis Software (SAS) Users Group Int. Conf., SAS Institute, Cary, NC, 1–18.
Cox, D., and Carroll, J. (2010). “Planning level cost estimation–Georgia DOT’s innovative processes and procedures.” Proc., Transportation Research Board Annual Meeting, Transportation Research Board, Washington, DC, 1–18.
Grace, M. J. (2010). “Pre-construction cost control for hard bid projects.” Cost Eng., 52(2), 8–17.
Hollar, D., Arocho, I., Hummer, J., Liu, M., and Rasdorf, W. (2010). “Development of a regression model to predict preliminary engineering costs.” Proc., Meeting Transportation’s 21st Century Challenges Technical Conf. and Exhibit, Institute of Transportation Engineers, Washington, DC, 1–12.
Knight, K., and Fayek, A. R. (2002). “Use of fuzzy logic for predicting design cost overruns on building projects.” J. Constr. Eng. Manage., 128(6), 503–512.
Kyte, C. A., Perfater, M. A., Haynes, S., and Lee, H. W. (2004a). “Developing and validating a highway construction project cost estimation tool.”, Virginia Transportation Research Council, Charlottesville, VA.
Kyte, C. A., Perfater, M. A., Haynes, S., and Lee, H. W. (2004b). “Developing and validating a tool to estimate highway construction project costs.”, Transportation Research Board, Washington, DC, 35–41.
Liu, M., et al. (2011). “Preliminary engineering cost trends for highway projects.”, North Carolina Dept. of Transportation, Raleigh, NC.
Merritt, L. W., Jr. (2008). “Performance audit. Dept. of transportation–Highway project schedules and costs.” 〈http://www.ncauditor.net/EPSWeb/Reports/Performance/PER-2007-7229.pdf〉 (Aug. 5, 2008).
National Cooperative Highway Research Council (NCHRP). (2012). “NCHRP project 15-51: Pre-construction services cost estimating guidebook.” 〈http://apps.trb.org/cmsfeed/TRBNetProjectDisplay.asp?ProjectID=3419〉 (Jun. 5, 2013).
Sakia, R. M. (1992). “The Box-Cox transformation technique: A review.” J. Roy. Stat. Soc. Series D, 41(2), 169–178.
Statistical Analysis Software (SAS), Version 9.2 [Computer software]. SAS Institute, Cary, NC.
Saulny, S., and Steinhauer, J. (2007). “Bridge collapse revives issue of road spending.” The New York Times, Aug. 7, A1.
Schofer, J. L., et al. (2010). “Research agenda for transportation infrastructure preservation and renewal: Conference report.” J. Infrastruct. Syst., 16(4), 228–230.
Sheiner, L. B., and Beal, S. L. (1981). “Some suggestions for measuring predictive performance.” J. Pharmacokinetics Biopharmaceutics, 9(4), 503–512.
Sundaram, V. (2008). “Essentials of design phase cost management and budget control.” Cost Eng., 50(2), 24–28.
Taylor, J. M. G. (1986). “The retransformed mean after a fitted power transformation.” J. Am. Stat. Assoc., 81(393), 114–118.
Turochy, R. E., Hoel, L. A., and Doty, R. S. (2001). “Highway project cost estimating methods used in the planning stage of project development.”, Virginia Transportation Research Council, Charlottesville, VA.
Woldesenbet, A., and Jeong, H.-S. (2012). “Historical data driven and component based prediction models for predicting preliminary engineering costs of roadway projects.” Proc., Construction Research Congress, ASCE, Reston, VA, 417–426.
Washington State DOT (WSDOT). (2013). “Highway construction cost comparison survey.” 〈http://www.wsdot.wa.gov/biz/construction/pdf/I-C_Const_Cost.pdf〉 (May 26, 2013).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 139Issue 9September 2013
Pages: 1259 - 1267

History

Received: Jan 6, 2012
Accepted: Dec 18, 2012
Published online: Dec 21, 2012
Discussion open until: May 21, 2013
Published in print: Sep 1, 2013

Permissions

Request permissions for this article.

Authors

Affiliations

Donna A. Hollar [email protected]
M.ASCE
Assistant Professor, Dept. of Construction Management, East Carolina Univ., 329 Rawl Building, Mailstop 307, Greenville, NC 27858. E-mail: [email protected]
William Rasdorf [email protected]
Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., 2501 Stinson Dr., Raleigh, NC 27695 (corresponding author). E-mail: [email protected]
A.M.ASCE
Assistant Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., 2501 Stinson Dr., Raleigh, NC 27695. E-mail: [email protected]
Joseph E. Hummer [email protected]
F.ASCE
Professor, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., 2501 Stinson Dr., Raleigh, NC 27695. E-mail: [email protected]
Ingrid Arocho [email protected]
S.M.ASCE
Graduate Student, Dept. of Civil, Construction, and Environmental Engineering, North Carolina State Univ., 2501 Stinson Dr., Raleigh, NC 27695. E-mail: [email protected]
Simon M. Hsiang [email protected]
Professor, Dept. of Industrial Engineering, Texas Tech Univ., Lubbock, TX 79409. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share