Technical Papers
Feb 16, 2012

Public Financing into Build-Operate-Transfer Hospital Projects in Italy

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 11

Abstract

An empirical analysis is presented to investigate the factors that have significant influence on the share of public financing into the total initial investment required to develop build-operate-transfer (BOT) health-care projects. Based on a model describing the main risks associated with public participation in BOT projects, a linear regression analysis has been conducted on a data set of Italian BOT hospital projects to yield implications. Outcomes reveal that the size of investment, the financial strength of the concessionaire, the duration of the concession period, the number of services, and the level of borrowing of the local health-care granting agency are significant factors of the level of public funding. The study confirms that public funding is provided not only to cover the non-self-financing portion of investment but also as a way to undertake a project in periods of scarce public financial resources. The methodology may be useful to refine the decision criteria for determining the level of public funding of a BOT hospital project in order to gain an understanding of the value that could be obtained from funding similar projects.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors are grateful to Raffaello Casati, former graduate student from ESCP/Politecnico di Torino, for his active involvement in this research.

References

Akintoye, A., and Chinyio, E. (2005). “Private finance initiative in the healthcare sector: Trend and risk assessment.” Eng. Construct. Architect. Manage., 12(6), 601–616.
Algarni, A. M., Arditi, D., and Polat, G. (2007). “Build-operate-transfer in infrastructure projects in the United States.” J. Constr. Eng. Manage., 133(10), 728–735.
Amatucci, F., Favretto, F., and Vecchi, V. (2010). “Il finanziamento degli investimenti sanitari: Il partenariato-pubblico privato su misura.” Rapporto OASI 2010 L'aziendalizzazione della sanità in Italia, Cantù, E.ed., SDA Bocconi Egea, Milano, Italy, 565–593.
Amatucci, F., and Lecci, F. (2006). “Le operazioni di partnership finanziaria pubblico-privato in sanità: Un’analisi critica.” Rapporto OASI 2006 L'aziendalizzazione della sanità in Italia, Cantù, E.ed., SDA Bocconi Egea, Milano, Italy, 689–731.
Amatucci, F., Lecci, F., and Marsilio, M. (2007). “Le sperimentazioni gestionali per i servizi core: Ricognizione delle esperienze e analisi di due casi.” Rapporto OASI 2007 L'aziendalizzazione della sanità in Italia, Pessina, E. Anessi, and Cantù, E., eds., SDA Bocconi Egea, Milano, Italy, 325–370.
Autorità di Vigilanza sui Contratti Pubblici (AVCP). (2010). “Consultazione estremi bandi di gara.” 〈http://bandigara.avcp.it/AVCP-ConsultazioneBandiGara/〉; (Feb. 1, 2011).
Bakatjan, S., Arikan, M., and Tiong, R. L. K. (2003). “Optimal capital structure model for BOT power projects in Turkey.” J. Constr. Eng. Manage., 129(1), 89–97.
Barretta, A., and Ruggiero, P. (2008). “Ex-ante evaluation of PFIs within the Italian health-care sector: What is the basis for this PPP?.” Health Policy, 88(1), 15–24.
Carroll Rovezzi, S., and Carroll, D. J. (2002). Statistics made simple for school leaders, Rowman & Littlefield, Lanham, MD.
Deloitte. (2009). “Classifiche 2009 Cresme.” Costruire, 318, Editrice Abitare Segesta, Milano, Italy.
Doff, R. (2008). “Defining and measuring business risk in an economic-capital framework.” Risk Finance, 9(4), 317–333.
Esty, B. C., and Sesia, A. Jr. (2007). “An overview of project finance and infrastructure finance—2006 update.” HBS 9-207-107, Harvard Business School, Boston, MA. 〈http://cb.hbsp.harvard.edu/cb/web/product_detail.seam?E=9544&R=207107-PDF-ENG&conversationld=385294〉; (Jan. 10, 2011).
Finlombarda. (2010). Osservatorio sul project finance in sanità IX edizione, Finlombarda, Milano, Italy.
Finnerty, J. D. (2007). Project financing: Asset-based financial engineering, 2nd Ed., Wiley, Hoboken, NJ.
Holmes, J., Capper, G., and Hudson, G. (2006). “LIFT: 21st century health care centres in the United Kingdom.” J. Facilities Manage., 4(2), 99–107.
Iyer, K. C., and Sagheer, M. (2010). “Hierarchical structuring of PPP risks using interpretative structural modeling.” J. Constr. Eng. Manage., 136(2), 151–159.
Jefferies, M., and McGeorge, W. D. (2009). “Using public-private partnership (PPPs) to procure social infrastructure in Australia.” Eng. Construct. Architect. Manage., 16(5), 415–437.
Jin, X. H. (2010). “Determinants of efficient risk allocation in privately financed public infrastructure projects in Australia.” J. Constr. Eng. Manage., 136(2), 138–150.
Kumaraswamy, M. M., and Zhang, X. Q. (2001). “Governmental role in BOT-led infrastructure development.” Int. J. Proj. Manage., 19(4), 195–205.
Ling, F., and Lim, H. L. (2007). “Foreign firms’ financial and economic risk in China.” Eng. Construct. Architect. Manage., 14(4), 346–362.
Mehta, A., Bhatia, A., and Chatterjee, A. (2010). Improving health and education service delivery in India through public–private partnerships, Asian Development Bank, Mandaluyong City, Philippines.
Montgomery, D. C., and Runger, G. C. (1999). Applied statistics and probability for engineers, Wiley, New York.
O’Brien, R. M. (2007). “A caution regarding rules of thumb for variance inflation factors.” Qual. Quant., 41(5), 673–690.
Pollock, A. M., Shaoul, J., and Vickers, N. (2002). “Private finance and value for money in NHS hospitals: A policy in search of a rationale?” Br. Med. J., 324(7347), 1205–1209.
Sachs, T., Tiong, R., and Wagner, D. (2007). “Political risk quantification using fuzzy set approach.” J. Financ. Manage. Prop. Constr., 12(2), 107–126.
Santoso, D., Ogunlana, S., and Minato, T. (2003). “Assessment of risks in high rise building construction in Jakarta.” Eng. Construct. Architect. Manage., 10(1), 43–55.
Schaufelberger, J. E., and Wipadapisut, I. (2003). “Alternate financing strategies for build-operate-transfer projects.” J. Constr. Eng. Manage., 129(2), 205–213.
Shen, L. Y., Li, H., and Li, Q. M. (2002). “Alternative concession model for build-operate-transfer contract projects.” J. Constr. Eng. Manage., 128(4), 326–330.
Shen, L. Y., and Wu, Y. Z. (2005). “Risk concession model for build-operate-transfer contract projects.” J. Constr. Eng. Manage., 131(2), 211–220.
Tabachnick, B. G., and Fidell, L. S. (2001). Using multivariate statistics, 3rd Ed., Harper Collins, New York.
Tiong, R. L. K., and Alum, J. (1997). “Financial commitments for BOT projects.” Int. J. Proj. Manage., 16(2), 73–78.
Treasury, H. M. (2003). “PFI: Meeting the investment challenge.” The Stationary Office, London.
Trujillo, J. A., Cohen, R., Freixas, X., and Sheehy, R. (1997). Infrastructure financing with unbundled mechanisms, Inter-American Development Bank, IFM-109, 〈http://www.iadb.org/sds/doc/1208eng.pdf〉; (Jul. 25, 2009).
Tukey, J. W. (1977). Exploratory data analysis, Addison-Wesley, Reading, MA.
Unioncamere. (2009). “Atlante della competitività delle province e delle regioni.” 〈http://www.unioncamere.gov.it/Atlante/〉; (Oct. 25, 2010).
Walker, C., and Smith, A. J. (1995). Privatized infrastructure: The build operate transfer approach, Thomas Telford, London, UK.
Xenidis, Y., and Angelides, J. (2005). “The financial risks in build-operate-transfer projects.” J. Constr. Manage. Econ., 23(4), 431–441.
Zhang, X. (2005a). “Financial viability analysis and capital structure optimization in privatized public infrastructure projects.” J. Constr. Eng. Manage., 131(6), 656–668.
Zhang, X. (2005b). “Concessionaire’s financial capability in developing build-operate-transfer type infrastructure projects.” J. Constr. Eng. Manage., 131(10), 1054–1064.
Zhang, X. (2009). “Win–win concession period determination methodology.” J. Constr. Eng. Manage., 135(6), 550–558.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 11November 2012
Pages: 1294 - 1302

History

Received: Mar 6, 2011
Accepted: Feb 14, 2012
Published online: Feb 16, 2012
Published in print: Nov 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Alberto De Marco [email protected]
Ph.D., Assistant Professor, Dept. of Management and Production Engineering, Politecnico di Torino, corso Duca degli Abruzzi 24, Torino, Italy (corresponding author). E-mail: [email protected]
Giulio Mangano [email protected]
Ph.D. Candidate, Dept. of Management and Production Engineering, Politecnico di Torino, corso Duca degli Abruzzi 24, Torino, Italy. E-mail: [email protected]
Anna Corinna Cagliano [email protected]
Postdoctoral Research Fellow, Dept. of Management and Production Engineering, Politecnico di Torino, corso Duca degli Abruzzi 24, Torino, Italy. E-mail: [email protected]
Sabrina Grimaldi [email protected]
Assistant Professor, Dept. of Management and Production Engineering, Politecnico di Torino, corso Duca degli Abruzzi 24, Torino, Italy. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share