Technical Papers
Oct 20, 2011

Factors Affecting Construction Labor Productivity in Kuwait

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 7

Abstract

Construction labor productivity has become such a buzz word and one of the most frequently researched topics. In most countries, labor cost comprises 30 to 50% of the overall project’s cost, and thus is regarded as a true reflection of the economic success of the operation. There are many challenges facing the construction industry in the state of Kuwait but one of the most important is low productivity. The objective of this research, therefore, is to identify and rank the relative importance of factors perceived to affect labor productivity on construction sites in Kuwait. To achieve this objective, a statistically representative sample of contractors was invited to participate in a structured questionnaire survey, comprising 45 productivity factors, classified under the following four primary groups: (1) management; (2) technological; (3) human/labor; and (4) external. Among the factors explored, the subsequent 10 are discerned to be the most significant in their effects on labor productivity: (1) clarity of technical specifications; (2) the extent of variation/change orders during execution; (3) coordination level among design disciplines; (4) lack of labor supervision; (5) proportion of work subcontracted; (6) design complexity level; (7) lack of incentive scheme; (8) lack of construction manager’s leadership; (9) stringent inspection by the engineer; and (10) delay in responding to requests for information. The results obtained fill a gap in knowledge of factors affecting labor productivity in Kuwait, which can be used by industry practitioners to develop a wider and deeper perspective of the factors influencing the efficiency of operatives and provide guidance to construction managers for efficient utilization of the labor force, hence assist in achieving a reasonable level of competitiveness and cost-effective operation.

Get full access to this article

View all available purchase options and get full access to this article.

References

Abdul Kadir, M. R., Lee, W. P., Jaafar, M. S., Sapuan, S. M., and Ali, A. A. (2005). “Factors affecting construction labour productivity for Malaysian residential projects.” Struct. Surv., 23(1), 42–54.
Adrian, J. (1987). Construction productivity improvement, Elsevier Science Publishing, Amsterdam, The Netherlands.
Alinaitwe, H. M., Mwakali, J. A., and Hanson, B. (2007). “Factors affecting the productivity of building craftsmen—Studies of Uganda.” J. Civil Eng. Manage., 13(3), 169–176.
Allmon, E., Hass, C. T., Borcherding, J. D., and Goodrum, P. M. (2000). “U.S. construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage.JCEMD4, 126(2), 97–104.
Arditi, D., and Mochtar, K. (2000). “Trends in productivity improvement in the US construction industry.” Constr. Manage. Econ., 18(1), 15–27.
Borcherding, J. D., Sebastian, S. J., and Samelson, N. M. (1980). “Improving motivation and productivity on large projects.” J. Constr. Div.JCCEAZ, 106(1), 73–89.
Central Intelligence Agency (CIA). (2011). The world factbook, Washington, DC, 〈https://www.cia.gov/library/publications/the-world-factbook/geos/ku.html〉 (Feb. 7, 2011).
Central Tenders Committee (CTC). (2011). Categories and classifications, Council of Ministers, State of Kuwait. 〈http://e.gov.kw/ctc_en/pages/servicescontent/companiescategorizingconditions.aspx〉 (Jan. 3, 2011).
Chang, C.-K., Hanna, A. S., Lackney, J. A., and Sullivan, K. T. (2007). “Quantifying the impact of schedule compression on labor productivity for mechanical and sheet metal contractor.” J. Constr. Eng. Manage.JCEMD4, 133(4), 287–297.
Construction Industry Institute (CII). (1986). Constructability: A primer, Publication 3–1, Construction Industry Institute (CII), Univ. of TX at Austin, Austin, TX.
Emmerson, H. (1962). Survey of problems before the construction industries, Ministry of Works, HMSO, London.
Energy Information Administration (EIA). (2006). Kuwait oil, country analysis briefs, energy information administration, U.S. Dept. of Energy, Washington, DC.
Enshassi, A., Mohamed, S., Abu Mustafa, Z., and Mayer, P. (2007). “Factors affecting labour productivity in building projects in the Gaza strip.” J. Civil Eng. Manage., 13(4), 245–254.
Finke, M. R. (1998). “A better way to estimate and mitigate disruption.” J. Constr. Eng. Manage.JCEMD4, 124(6), 490–497.
Handa, V., and Abdalla, O. (1989). “Forecasting productivity by work sampling.” Constr. Manage. Econ., 7(1), 19–28.
Hanna, A. S., Chang, Chul-Ki, Lackney, J. A., and Sullivan, K. T. (2007). “Impact of overmanning on mechanical and sheet metal labor productivity.” J. Constr. Eng. Manage.JCEMD4, 133(1), 22–29.
Hanna, A. S., Taylor, C. S., and Sullivan, K. T. (2005). “Impact of extended overtime on construction labor productivity.” J. Constr. Eng. Manage.JCEMD4, 131(6), 734–740.
Hazeltine, C. S. (1976). “Motivation of construction workers.” J. Constr. Div.JCCEAZ, 102(3), 497–509.
Heizer, J., and Render, B. (1996). Production and operations management: Strategic and tactical decisions, 4th Ed., Prentice Hall, Series in Decision Sciences, Upper Saddle River, NJ.
Herbsman, Z., and Ellis, R. (1990). “Research of factors influencing construction productivity.” Constr. Manage. Econ., 8(1), 49–61.
Hinze, J. W. (1999). Construction planning and scheduling, Prentice Hall, Upper Saddle River, NJ.
Hogg, R., and Tannis, E. (2009). Probability and statistical inferences, 8th Ed., Prentice Hall, Upper Saddle River, NJ.
Horner, R. M. W., and Duff, R. (2001). More for less, a contractor’s guide to improving productivity in construction, Construction Industry Research and Information Association (CIRIA), London.
Horner, R. M. W., Talhouni, B. T., and Thomas, H. R. (1989). “Preliminary results of major labour productivity monitoring programme.” Proc. of the 3rd Yugoslavian Symp. on Construction Management, Cavtat, 18–28.
Jarkas, A. M. (2005). “An investigation into the influence of buildability factors on productivity of in situ reinforced concrete construction.” Ph.D. thesis, Dept. of Civil Engineering, Univ. of Dundee, Dundee, UK.
Kaming, P. F., Holt, G. D., Kometa, S. T., and Olomolaiye, P. O. (1998). “Severity diagnosis of productivity problems—A reliability analysis.” Int. J. Proj. Manage.IPMAEL, 16(2), 107–113.
Kaming, P. F., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1997). “Factors influencing craftsmen’s productivity in Indonesia.” Int. J. Proj. Manage.IPMAEL, 15(1), 21–30.
Lim, E., and Alum, J. (1995). “Construction productivity: Issues encountered by contractors in Singapore.” Int. J. Proj. Manage.IPMAEL, 13(1), 51–58.
Makulsawatudom, A., Emsley, M., and Sinthawanarong, K. (2004). “Critical factors influencing construction productivity in Thailand.” J. King Mongkut’s Institute of Technology North Bangkok, 14(3), 1–6.
McTague, B., and Jergeas, G. (2002). Productivity improvements on Alberta major construction projects, construction productivity improvement report/project evaluation tool, Alberta Economic Development, Alberta, Canada.
Olomolaiye, P. O., Jayawardane, A., and Harris, F. (1998). Construction productivity improvement, Chartered Institute of Building (CIB), London.
Olomolaiye, P. O., Wahab, K., and Price, A. (1987). “Problems influencing craftsman productivity in Nigeria.” Build. Environ.BUSCBC, 22(4), 317–323.
Paulson, B. (1975). “Estimation and control of construction labor costs.” J. Constr. Div.JCCEAZ, 101(3), 623–633.
Peles, C. J. (1987). “Productivity analysis—A case study.” Transaction of the American Association of Cost Engineers, 31st Annual Meeting, Atlanta.
Pulaski, M. H., and Horman, M. J. (2005). “Organizing constructability knowledge for design.” J. Constr. Eng. Manage.JCEMD4, 131(8), 911–919.
Rakhra, A. S. (1991). “Construction productivity: Concept, measurement and trends, organization and management in construction.” Proc. of the 4th Yugoslavian Symp. on Construction Management, Dubrovnik, 487–497.
Saghatforoush, E., Hasim, S., Jaafar, M., and Abdul Kadir, M. (2009). “Constructability implementation among Malaysian building contractors.” Eur. J. Sci. Res., 29(4), 518–532.
Sincich, T., Levine, D. M., and Stephan, D. (2002). Practical statistics by example using Microsoft Excel and Minitab, 2nd Ed., Prentice Hall, Upper Saddle River, NJ.
Stoeckel, A., and Quirke, D. (1992). Services: Setting the agenda for reform, industries research program, Dept. of Industry, Technology and Commerce, London.
Sugiharto, A. (2003). “Factors influencing construction productivity in the Indonesian context.” Proc. of the Eastern Asia Society for Transportation Studies, Vol. 4, October, Fukuoka, Japan, 1557–1571.
Sumanth, D. J. (1984). Productivity engineering and management, McGraw-Hill, New York.
Talhouni, B. T. (1990). “Measurement and analysis of construction labour productivity.” Ph.D. thesis, Dept. of Civil Engineering, Univ. of Dundee, Dundee, UK.
Thomas, H. R., Maloney, W. F., Horner, R. M. W., Smith, G. R., Handa, V. K., and Sanders, S. R. (1990). “Modeling construction labor productivity.” J. Constr. Eng. Manage.JCEMD4, 116(4), 705–726.
Thomas, H. R., and Sanders, S. R. (1991). “Factors affecting masonry productivity.” J. Constr. Eng. Manage.JCEMD4, 117(4), 626–644.
Vaggi, G. (1987). The economics of Francois Quesnay, Duke University Press, Durham, NC.
Whitehead, R. C. (1990). “Factors influencing labour productivity on construction sites.” Ph.D. thesis, Dept. of Civil Engineering, Univ. of Dundee, Dundee, UK.
Yates, J., and Guhathakurta, S. (1993). “International labour productivity.” J. Cost Eng., 35(1), 15–25.
Zakari, M., Olomolaiye, P. O., Holt, G. D., and Harris, F. C. (1996). “A survey of constraints on Iranian construction operatives’ productivity.” Constr. Manage. Econ., 14(5), 417–426.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 7July 2012
Pages: 811 - 820

History

Received: May 4, 2011
Accepted: Oct 17, 2011
Published online: Oct 20, 2011
Published in print: Jul 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Abdulaziz M. Jarkas, Ph.D. [email protected]
P.Eng.
Executive Vice President—Projects, Al Mazaya Holding Co., KSCC, P.O.Box 3546, Safat 13036, State of Kuwait (corresponding author). E-mail: [email protected]
Camille G. Bitar [email protected]
P.Eng.
Senior Project Manager, Projacs International, P.O.Box 25944, Safat 13120, State of Kuwait. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share