Net Asset Value–Based Concession Duration Model for BOT Contracts

Publication: Journal of Construction Engineering and Management
Volume 138, Issue 2

Abstract

A concession period is a key decision variable in the arrangement of a build-operate-transfer (BOT)-type contract. Recently, an innovative BOT concession model (BOTCcM) was developed to quantitatively determine the value of a concession period. The model could propose an interval for possible negotiations between a host government and a private investor. Nevertheless, this paper identifies a major limitation of this model and proposes an alternative model for improvement. Under a BOT arrangement, the project becomes a property of the host government upon its transfer. The project’s net asset value at the transfer time is usually significantly greater than zero, representing revenue to the host government. This revenue, thus, cannot be ignored. However, this revenue was not considered in the analysis of BOTCcM. This study improves the second critical point in BOTCcM by considering project net asset value at the transfer time. The application of the new model is demonstrated by using the same example case quoted in BOTCcM and shows that a significantly different decision will be made when project net asset value at its transfer time is considered.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers would like to thank the editor and the anonymous reviewers for their useful comments on earlier versions of the paper.

References

Shen, L. Y., Bao, H. J., Wu, Y. Z., and Lu, W. S. (2007). “Using bargaining-game theory for negotiating concession period for BOT-type contract.” J. Constr. Eng. Manage., 133(5), 385–392.
Shen, L. Y., Li, H., and Li, Q. M. (2002). “Alternative concession model for build operate transfer contract projects.” J. Constr. Eng. Manage., 128(4), 326–330.
Shen, L. Y., and Wu, Y. Z. (2005). “Risk concession model for build/operate/transfer contract projects.” J. Constr. Eng. Manage., 131(2), 211–220.
Warren, C. S., James, M. R., and Jonathan, E. D. (2009). Financial accounting, 11th Ed., South-Western Cengage Learning, Mason, OH.
Wu, M., Chau, K. W., and Shen, Q. P. (2011a). “Discussion of ‘Win-win concession period determination methodology’ by Xueqing Zhang.” J. Constr. Eng. Manage., 137(6), 471.
Wu, M., Chau, K. W., and Shen, Q. P. (2011b). “Discussion of ‘Employing the net present value-consistent IRR methods for PFI contracts’ by Y. H. Chiang, Eddie W. L. Cheng, and Patrick T. I. Lam.” J. Constr. Eng. Manage., 137(6), 472–474.
Zhang, X. Q. (2009). “Win-win concession period determination methodology.” J. Constr. Eng. Manage., 135(6), 550–558.
Zhou, X. W. (2010). “Sha Jiao B power plant development model.” 〈http://www.szzx.gov.cn/zxxxzwhgz/zwhgzwh/ws_wjzl/wsgjszws/szws8/201004/t20100406_1491415.htm〉 (Nov. 10, 2010).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 138Issue 2February 2012
Pages: 304 - 308

History

Received: May 5, 2010
Accepted: Mar 29, 2011
Published online: Mar 31, 2011
Published in print: Feb 1, 2012

Permissions

Request permissions for this article.

Authors

Affiliations

Professor (on leave), Chongqing Jiao Tong Univ., P.R. China; and Senior Lecturer, School of Architecture and Built Environment, Univ. of Newcastle, NSW 2308 Australia (corresponding author). E-mail: [email protected]
Kwong Wing Chau
Chair Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong.
Qiping Shen [email protected]
Chair Professor and Head, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong. E-mail: [email protected]
Li Yin Shen [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share