Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 9

Abstract

This research proposes an innovative critical chain method (ICCM) for project planning and control under resource constraints and uncertainty. An improved genetic algorithm is developed to identify the critical chain and to obtain the optimal start time of each activity under the most optimistic duration of each activity and resource constraints. Furthermore, a feeding buffer is added in an insert point in order to deal with uncertainties. The benefits of applying this ICCM are demonstrated in an example project.

Get full access to this article

View all available purchase options and get full access to this article.

References

Chen, M. K., and Hsu, S. P. (2004). “Fuzzy-critical-chain-based project management.” J. Chin. Inst. Eng., 21(2), 167–176 (in Chinese).
Goldratt, E. (1997). Critical chain, The North River, Great Barrington, Mass.
Hegazy, T., and Petzold, K. (2003). “Genetic optimization for dynamic project control.” J. Constr. Eng. Manage., 129(4), 396–404.
Kuo, T. C., Chang, S. H., and Huang, S. N. (2009). “Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory.” Expert Sys. Applic., 36(2), 1783–1792.
Long, L. D., and Ohsato, A. (2008). “Fuzzy critical chain method for project scheduling under resource constraints and uncertainty.” Int. J. Proj. Manage., 26(6), 688–698.
Pappis, C. P., and Karacapilidis, N. I. (1993). “A comparative assessment of measures of similarity of fuzzy values.” Fuzzy Sets Syst., 56(2), 171–174.
Steyn, H. (2001). “An investigation into the fundamentals of critical chain project scheduling.” Int. J. Proj. Manage., 19(6), 363–369.
Tavares, L. V., Ferreira, J. A., and Coelho, J. S. (1998). “On the optimal management of project risk.” Eur. J. Oper. Res., 107(2), 451–469.
Vaziri, K., Carr, P. G., and Nozick, L. K. (2007). “Project planning for construction under uncertainty with limited resources.” J. Constr. Eng. Manage., 133(4), 268–276.
Zhang, H., Li, H., and Tam, C. M. (2006). “Particle swarm optimization for preemptive scheduling under break and resource-constraints.” J. Constr. Eng. Manage., 132(3), 259–267.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 9September 2010
Pages: 1056 - 1060

History

Received: Nov 15, 2008
Accepted: Feb 22, 2010
Published online: Feb 24, 2010
Published in print: Sep 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Zhen Yu Zhao, Ph.D. [email protected]
Professor and Head, Dept. of Construction Management, North China Electric Power Univ., Beijing 102206, China (corresponding author). E-mail: [email protected]
Wei Yang You
Research Assistant, Dept. of Construction Management, North China Electric Power Univ., Beijing 102206, China.
Jian Zuo, Ph.D.
Lecturer, School of Natural and Built Environments, Univ. of South Australia, Adelaide 5001, Australia.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share