Application of Innovative Critical Chain Method for Project Planning and Control under Resource Constraints and Uncertainty
Publication: Journal of Construction Engineering and Management
Volume 136, Issue 9
Abstract
This research proposes an innovative critical chain method (ICCM) for project planning and control under resource constraints and uncertainty. An improved genetic algorithm is developed to identify the critical chain and to obtain the optimal start time of each activity under the most optimistic duration of each activity and resource constraints. Furthermore, a feeding buffer is added in an insert point in order to deal with uncertainties. The benefits of applying this ICCM are demonstrated in an example project.
Get full access to this article
View all available purchase options and get full access to this article.
References
Chen, M. K., and Hsu, S. P. (2004). “Fuzzy-critical-chain-based project management.” J. Chin. Inst. Eng., 21(2), 167–176 (in Chinese).
Goldratt, E. (1997). Critical chain, The North River, Great Barrington, Mass.
Hegazy, T., and Petzold, K. (2003). “Genetic optimization for dynamic project control.” J. Constr. Eng. Manage., 129(4), 396–404.
Kuo, T. C., Chang, S. H., and Huang, S. N. (2009). “Due-date performance improvement using TOC's aggregated time buffer method at a wafer fabrication factory.” Expert Sys. Applic., 36(2), 1783–1792.
Long, L. D., and Ohsato, A. (2008). “Fuzzy critical chain method for project scheduling under resource constraints and uncertainty.” Int. J. Proj. Manage., 26(6), 688–698.
Pappis, C. P., and Karacapilidis, N. I. (1993). “A comparative assessment of measures of similarity of fuzzy values.” Fuzzy Sets Syst., 56(2), 171–174.
Steyn, H. (2001). “An investigation into the fundamentals of critical chain project scheduling.” Int. J. Proj. Manage., 19(6), 363–369.
Tavares, L. V., Ferreira, J. A., and Coelho, J. S. (1998). “On the optimal management of project risk.” Eur. J. Oper. Res., 107(2), 451–469.
Vaziri, K., Carr, P. G., and Nozick, L. K. (2007). “Project planning for construction under uncertainty with limited resources.” J. Constr. Eng. Manage., 133(4), 268–276.
Zhang, H., Li, H., and Tam, C. M. (2006). “Particle swarm optimization for preemptive scheduling under break and resource-constraints.” J. Constr. Eng. Manage., 132(3), 259–267.
Information & Authors
Information
Published In
Copyright
© 2010 ASCE.
History
Received: Nov 15, 2008
Accepted: Feb 22, 2010
Published online: Feb 24, 2010
Published in print: Sep 2010
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.