TECHNICAL PAPERS
Jan 28, 2010

Quantitative Methods for Design-Build Team Selection

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 8

Abstract

The use of design/build (DB) contracting by transportation agencies has been steadily increasing as a project delivery system for large complex highway projects. However, moving to DB from traditional design-bid-build procurement can be a challenge. One significant barrier is gaining acceptance of a best-value selection process in which technical aspects of a proposal are considered separately and then combined with price to determine the winning proposal. These technical aspects mostly consist of qualitative criteria, thus making room for human errors or biases. Any perceived presence of bias or influence in the selection process can lead to public mistrust and protests by bidders. It is important that a rigorous quantitative mathematical analysis of the evaluation process be conducted to determine whether bias exists and to eliminate it. The paper discusses two potential sources of bias—evaluators and weighting model—in the DB selection process and presents mathematical models to detect and remove biases should they exist. A score normalization model deals with biases from the evaluators; then a graphical weight-space volume model and a Monte Carlo statistical sampling model are developed to remove biases from the weighting model. The models are then tested and demonstrated using results from the DB bridge replacement project for the collapsed Mississippi River bridge of Interstate 35W in Minneapolis.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers wish to acknowledge the support and funding provided by the Construction and Materials Support Center (CMSC) at the University of Wisconsin-Madison in the preparation of this paper.

References

Beard, J., Loukakis, M. C., and Wundram, E. C. (2001). Design-build: Planning through development, McGraw-Hill, New York.
Contract Administration. (2002). Technology and practice in Europe, international technology exchange programs, Dept. of Transportation, Federal Highway Administration, Washington, D.C.
Dean, B. V., and Nishry, M. J. (1965). “Scoring and profitability models for evaluating and selecting engineering projects.” Oper. Res., 13, 550–569.
El Wardani, M. A., Messner, J. I., and Horman, M. J. (2006). “Comparing procurement methods for design/build projects.” J. Constr. Eng. Manage., 132(3), 230–238.
Fong, P. S.-W., and Choi, S. K.-Y. (2000). “Final contractor selection using the analytical hierarchy process.” Constr. Manage. Econom., 18, 547–557.
Gransberg, D. D., and Ellicott, M. A. (1997). “Best-value contracting criteria.” Cost Eng., 39(6), 31–34.
Gransberg, D. D., and Molenaar, K. R. (2003). “Does design/build project delivery affect the future of the public engineer?” Proc., Transportation Research Record: TRB 2008 Annual Meeting (CD-ROM), Transportation Research Board of the National Academies, Washington, D.C., 13–20.
Gransberg, D. D., Molenaar, K. R., Scott, S., and Smith, N. (2007). Implementing best-value procurement in highway construction projects, Construction Research Council, ASCE, Reston, Va.
Gransberg, D. D., and Senadheera, S. P. (1999). “Design-build contract award methods for transportation projects.” J. Transp. Eng., 125(6), 265–267.
Hatush, Z., and Skitmore, M. (1997). “Evaluating contractor prequalification data: Selection criteria and project success factors.” Constr. Manage. Econom., 15, 129–147.
Hatush, Z., and Skitmore, M. R. (1998). “Contractor selection using multicriteria utility theory: An additive model.” Build. Environ., 33(2–3), 105–115.
Herbsman, Z., and Ellis, R. (1992). “Multiparameter bidding system-innovation in contract administration.” J. Constr. Eng. Manage., 118(1), 142–150.
Martino, J. P. (1995). Research and development project selection, Wiley, New York.
Minnesota DOT. (2007). “Instructions to proposers.” Minnesota DOT website, ⟨http://www.dot.state.mn.us/i35wbridge/rebuild/contractor.html⟩ (July 15, 2008).
Molenaar, K. R., and Songer, A. D. (1998). “Model for public sector design/build project selection.” J. Constr. Eng. Manage., 124(6), 467–479.
Palaneeswaran, E., Kumaraswamy, M., and Ng, T. (2003). “Targeting optimum value in public sector projects through ‘best value’-focused contractor selection.” Construc. Architect. Manage.,10(6), 418–431.
Phipps, A. R. (2000). “Maine builds longest-span precast segmental bridge with unique design/build selection process.” Transportation Research Record. 1696, Transportation Research Board, Washington, D.C., 71–75.
Postma, S. S., Carlile, F., and Roberts, J. E. (1999). “Use of best value selection process Utah Department of Transportation I-15 design-build project.” Transportation Research Record. 1654, Transportation Research Board, Washington, D.C.
Russell, J. S. (1992). “Decision models for analysis and evaluation of construction contractors.” Constr. Manage. Econom., 10, 185–202.
Shane, J. S., Gransberg, D. D., Molenaar, K. R., and Gladake, J. R. (2006). “Legal challenge to a best-value procurement system.” Leadership Manage. Eng., 6(1), 20–25.
Singh, D., and Tiong, R. L. K. (2005). “A fuzzy decision framework for contractor selection.” J. Constr. Eng. Manage., 131(1), 62–70.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 8August 2010
Pages: 904 - 912

History

Received: Dec 12, 2008
Accepted: Jan 25, 2010
Published online: Jan 28, 2010
Published in print: Aug 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Mounir El Asmar [email protected]
Ph.D. Candidate, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin—Madison, 2256 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706 (corresponding author). E-mail: [email protected]
Wafik Lotfallah [email protected]
Associate Professor, Dept. of Mathematics and Actuarial Science, American Univ. in Cairo, Egypt; and, Visiting Associate Professor, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin—Madison, 2208 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706. E-mail: [email protected]
Gary Whited, M.ASCE [email protected]
Program Manager, Construction and Materials Support Center, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin—Madison, 2314 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706. E-mail: [email protected]
Awad S. Hanna, F.ASCE [email protected]
Professor and Chair, Construction Engineering and Management Program, Dept. of Civil and Environmental Engineering, Univ. of Wisconsin—Madison, 2320 Engineering Hall, 1415 Engineering Dr., Madison, WI 53706. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share