TECHNICAL PAPERS
Jul 16, 2009

Object Model Framework for Interface Modeling and IT-Oriented Interface Management

Publication: Journal of Construction Engineering and Management
Volume 136, Issue 2

Abstract

The intense complexity of interfaces in a construction project makes information technology (IT) applications a must for effective interface management (IM). This largely requires a unified, accurate, and efficient way of modeling interface information. Conventionally, interfaces are simply modeled as dependencies/relationships between project entities; various interface information is loosely presented in different ways, which reduces the accuracy and completeness of interface information as well as the efficiency in information exchange and application. This paper introduces an object view of interfaces and its inherent interface object modeling technique, and then presents an interface object model (IOM) framework. The IOM is the first in the literature that aims to systematically define the data structure and dependencies of interface information for modeling. It is at the core of a conceptually proposed systematic model-based IM strategy. When fully developed, the IOM can be used to accurately model multiple types of interfaces. This will greatly enhance the quality and interoperability of interface information, promote IT applications for IM, and ultimately improve interface-related project performance.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-Hammad, A. (2000). “Common interface problems among various construction parties.” J. Perform. Constr. Facil., 14(2), 71–74.
Al-Hammad, A., and Al-Hammad, I. (1996). “Interface problems between building owners and designers.” J. Perform. Constr. Facil., 10(3), 123–126.
Alarcón, L. F., and Mardones, D. A. (1998). “Improving the design-construction interface.” Proc., 6th Annual Conf. of the IGLC, Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, Brazil.
Archibald, R. D. (2003). Managing high-technology programs and projects, Wiley, New York.
AutoDesk, Inc. (2002). “The road to building information modeling.” ⟨http://www.laiserin.com/features/bim/autodesk_bim.pdf⟩ (June 6, 2007).
Chan, W. T., Chen, C., Messner, J. I., and Chua, D. K. H. (2005). “Interface management for China’s build-operate-transfer projects.” J. Constr. Eng. Manage., 131(6), 645–655.
Chen, Q., Reichard, G., and Beliveau, Y. (2008). “Multiperspective approach to exploring comprehensive cause factors for interface issues.” J. Constr. Eng. Manage., 134(6), 432–441.
Critsinelis, A. (2001). “The modern field development approach.” Proc., OMAE 20th Int. Conf. on Offshore Mech. and Artic Eng., Rio de Janeiro, Brazil.
Danso-Amoako, M. O., Issa, R. R. A., and O’Brien, W. (2003). “Framework for a point-n-click interface system for 3D CAD construction visualization and documentation.” Proc., Towards a Vision for Information Technology in Civil Engineering, ASCE, Reston, Va.
Eastman, C. M. (1999). Building product models: Computer environments supporting design and construction, CRC, Boca Raton, Fla.
Emerging Construction Technologies. (2009). “4D modeling.” Div. of Construction Engineering and Management, Purdue Univ., ⟨http://rebar.ecn.purdue.edu/ECT/links/technologies/other/4d.aspx⟩ (Nov. 16, 2009).
Froese, T. (1992). ‘Integrated computer-aided project management through standard object-oriented models.” Ph.D. thesis, Stanford Univ., Stanford, Calif.
International Alliance for Interoperability (IAI). (1999). Industry foundation classes—Release 2.0: An introduction to the international alliance for interoperability and the industry foundation classes, IAI, Washington, D.C.
Jonathan Cohen and Associates. (2004). “Object-oriented CAD and parametric 3D modeling.” ⟨http://www.jcarchitects.com/objectCAD.html⟩ (June 7, 2006).
Khanzode, A., Fischer, M., and Hamburg, S. (2000). “Effect of information standards on the design-construction interface: Case examples from the steel industry.” Proc., Computing in Civil and Building Engineering, ASCE, Reston, Va., 804–811.
Krueger, T. (2002). “Eliminate the interface.” J. Architectural Ed., 56(2), 14–17.
Laan, J., Wildenburg, L., and Kleunen, P. (2000). “Dynamic interface management in transport infrastructure project.” Proc., 2nd European Systems Engineering Conf., Munich, Germany.
Luiten, G., et al. (1993). “An information reference model for architecture, engineering, and construction.” Proc., 1st Int. Conf. on the Management of Information Technology for Construction, World Scientific & Global Publication Services, Singapore, 391–406.
Miles, R. S., and Ballard, G. (2002). “Problems in the interfaces between mechanical design and construction: A research proposal.” J. Constr. Res., 3(1), 83–95.
Mitchell, R. (2006). “Field report: GM builds on 3-D model.” Computerworld, Inc., ⟨http://www.computerworld.com/action/article.do?command=viewArticleBasic&articleId=112739⟩ (June 6, 2007).
Morris, P. W. G. (1983). “Managing project interfaces—Key points for project success.” Project management handbook, D. I. Cleland and W. R. Kings, eds., Van Nostrand Reinhold, New York.
Nakajima, M. (1998). “Knowledge-based generation of the activity process in wooden construction systems.” Comput. Aided Civ. Infrastruct. Eng., 13(3), 163–177.
Nooteboom, U. (2004). “Interface management improves on-time, on-budget delivery of megaprojects.” J. Pet. Technol., August, 32–34.
Patrick, H. P. (1997). “Interface.” Project management: Getting the job done on time and in budget, Butterworth-Heinemann, Woburn, Mass.
Pavitt, T. C., and Gibb, A. G. F. (2003). “Interface management within construction: In particular, building façade.” J. Constr. Eng. Manage., 129(1), 8–15.
Rafiq, M. Y. (2003). “Report on the ASCE Convention and Conf. Nashville November 14–18 2003.” Rep. Prepared for Royal Academy of Engineering, School of Civil and Structural Engineering, Univ. of Plymouth, Plymouth, U.K.
Rumbaugh, J., Jacobson, I., and Booch, G. (1999). The unified modeling language reference manual, 1st Ed., Addison-Wesley, Boston, Mass.
Sanchez, R. (1999). “Modular architectures in the marketing process.” J. Marketing, 63, 92–111.
Shrive, C. A. (1992). “Specifying for multiple prime contracts.” The construction specifier, The Construction Specifications Institute (CSI), Alexandria, Va.
Sorrel, D., Green, J. D., Florida, M. J., and Sheridan, J. (1996). “Liuhua 11-1 development—Phase I installation.” Proc., Annual Offshore Technology Conf., OTC, Houston, Tex., 349–358.
Stuckenbruck, L. C. (1983). “Project integration in the matrix organization.” Project management handbook, Van Nostrand Reinhold, New York, 37–58.
Wideman, R. M. (2002). “Wideman comparative glossary of project management terms, v3.1.” ⟨http://www.maxwideman.com/pmglossary/PMG_I03.htm⟩ (May 7, 2006).

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 136Issue 2February 2010
Pages: 187 - 198

History

Received: Feb 11, 2008
Accepted: Jul 7, 2009
Published online: Jul 16, 2009
Published in print: Feb 2010

Permissions

Request permissions for this article.

Authors

Affiliations

Qian Chen, A.M.ASCE [email protected]
Assistant Professor, Dept. of Food, Agricultural, and Biological Engineering, The Ohio State Univ., Columbus, OH 43210 (corresponding author). E-mail: [email protected]
Georg Reichard [email protected]
Assistant Professor, Dept. of Building Construction, Virginia Polytechnic Institute and State Univ., Blacksburg, VA 24061. E-mail: [email protected]
Yvan Beliveau [email protected]
P.E.
Director, Myers-Lawson School of Construction, Virginia Polytechnic Institute and State Univ., Blacksburg, VA 24061. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share