Empirical Analysis of the Learning Curve Principle in Prestressed Concrete Piles
Publication: Journal of Construction Engineering and Management
Volume 135, Issue 5
Abstract
The principle of learning curves can be applied in construction for the prediction of the time/cycle of future work, work performance levels, and other performance measures. Learning curve principles can be effectively utilized in litigation cases where production is compromised by delays. The objective of this study was to determine if learning curves could be used to accurately predict the production efforts of future units by applying the principles to the prefabrication and driving of prestressed concrete piles. The individual time to cast each of the concrete piles was recorded and used to compute the cumulative average time to fabricate the concrete piles. The data were used to compute the learning rate and the theoretical time to complete the first unit . From this information, predictions were made as to the amount of effort to fabricate future piles. The results showed that the pile fabrication crew improved its learning throughout the pile fabrication effort, but this improvement was quite small. The learning curve theory was found to apply well to large numbers of repeated items, and that the predictions made with learning curves are reasonably accurate.
Get full access to this article
View all available purchase options and get full access to this article.
References
Adrian, J. J. (1987). Construction productivity improvement, Elsevier Science, New York.
Couto, J. P., and Texiera, J. C. (2005). “Using linear model for learning curve effect on highrise floor construction.” Constr. Manage. Econom., 23(4), 355–364.
Diekmann, J. R., Horn, D. L., and O’Connor, M. H. (1982). “Utilization of learning curves in damage for delay claims.” Project Management Quarterly, February, 67–71.
Drewin, F. J. (1982). Construction productivity: Measurement and improvement through work study, Elsevier Science, New York.
Everett, J. G., and Farghal, S. (1994). “Learning curve predictors for construction field operations.” J. Constr. Eng. Manage., 120(3), 603–616.
Everett, J. G., and Farghal, S. (1997). “Data representation for predicting performance with learning curves.” J. Constr. Eng. Manage., 123(1), 46–52.
Fabrycky, W. J., Ghare, P. M., and Torgersen, P. E. (1972). Industrial operations research, Prentice-Hall, Englewood Cliffs, N.J.
Farghal, S., and Everett, J. G. (March 1997). “Learning curves: Accuracy in predicting future performance.” J. Constr. Eng. Manage., 123(1), 41–45.
Gates, M., and Scarpa, A. (1972). “Learning and experience curves.” J. Constr. Div., 98(1), 70–101 .
Hinze, J. (2008). Construction planning and scheduling, 3rd Ed., Pearson Education, Upper Saddle River, N.J.
Lam, K. C., Lee, D., and Hu, T. (2001). “Understanding the effect of the learning-forgetting phenomenon to duration of project construction.” Int. J. Proj. Manage., 19(7), 411–420.
Liao, S. S. (1988) “The learning curve: Wright’s model vs. Crawford’s model.” Issues Account. Educ., Fall, 302–315.
Lutz, J. D., Halpin, D. W., and Wilson, J. R. (1994). “Simulation of learning development in repetitive construction.” J. Constr. Eng. Manage., 120(4), 753–773.
Oglesby, C. H., Parker, H. W., and Howell, G. A. (1989). Productivity improvement in construction, McGraw-Hill, New York.
Otswald, P. F. (1974). Cost estimating for engineering and management, Prentice-Hall, Englewood Cliffs, N.J.
Teplitz, C. J. (1991). The learning curve deskbook: A reference guide to theory, calculations, and applications, Quorum Books, Westport, Conn.
Thomas, H. R., Mathews, C. T., and Ward, J. G. (June 1985). “Learning curve models of construction productivity.” J. Constr. Eng. Manage., 112(2), 245–258.
Wong, P. S. P., Cheung, S. O., and Hardcastle, C. (June 2007). “Embodying learning effect in performance prediction.” J. Constr. Eng. Manage., 133(6), 474–482.
Wright, T. P. (1936). “Factors affecting the cost of airplanes.” J. Aeronaut. Sci., 3(2), 124–125.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Feb 19, 2008
Accepted: Jun 30, 2008
Published online: May 1, 2009
Published in print: May 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.