This paper is motivated by the experience of measurement and characterization of tunnel lining defects occurring in a real case involving four tunnels excavated by tunnel boring machines (TBMs). This experience has shown that often the causes of these defects were not well understood and not well covered by current design practices. The paper focuses on five defect types: uncontrolled cracking of the lining, ovalization, joint openings, misalignments, and edge ruptures. It is found that deficient gap filling is the cause of excessive cracking, ovalization and joint openings, whereas misalignments and edge ruptures are caused by deficient placing of the segments. Edge ruptures could also be related to lack of confinement of the stresses at the joint section in the longitudinal direction. The possibility of deficient gap filling is not contemplated in design practices, and perhaps it should be considered, in terms of having enough minimum reinforcement to control cracking when no significant axial force is present. Ovalization is interpreted as being caused by service loads, whereas in fact this paper shows that it is also due to deficient gap filling and its structural consequences are, therefore, not significant. The experience recounted in this paper is a good instance of the importance of understanding the underlying causes of the observed phenomena to properly treat them.
Get full access to this article
View all available purchase options and get full access to this article.
References
AFTES (Association Française des Tunnels et de l’Espace Souterrain). 1999. “The design, sizing and construction of precast concrete segments installed at the rear of a TBM.” In Guidelines for segmental lining Ver. 1, 35. Paris: AFTES.
Arnau, O. 2012. “Structural response of precast concrete segmental tunnel lining.” Ph.D. thesis, Dept. of Engineering Construction, Univ. of Barcelona.
Baumann, L. 1992. “Tunnelauskleidungen mit Stahlbetontübbingen.” Bautechnik 69 (1): H.1.
Blom, C. B. M., P. S. Jovanovic, and W. Leenderise. 2002. “Learning experience in optimizing construction quality assessment for the Green Heart Tunnel, The Netherlands.” In Proc., 4th Japan–The Netherlands Tunneling Seminar, Delft, Netherlands: Geo-Delft.
CEN (European Committee for Standardization). 2004. “Design of concrete structures–Part 1-1: General rules and rules for buildings.” Brussels, Belgium: CEN.
Cividini, A. 2012. “Investigation on the cause of damages of a deep tunnel.” Int. J. Geomech. 12 (6): 722–731. https://doi.org/10.1061/(ASCE)GM.1943-5622.0000108.
DAI. 1998. “Convergence properties of nonlinear conjugate gradient methods.” SIAM J. Opt. 10 (2): 345–358.
Gander, W., G. H. Golub, and R. Strebel. 1994. “Least-squares fitting of circles and ellipses.” BIT Numer. Math. 34 (4): 558–578. https://doi.org/10.1007/BF01934268.
Han, J. Y., J. Guo, and Y. S. Jiang. 2013. “Monitoring tunnel profile by means of multi-epoch dispersed 3-D LiDAR point clouds.” Tunnelling Underground Space Technol. 33 (5): 186–192. https://doi.org/10.1016/j.tust.2012.08.008.
Hestenes, M. R., and E. Stiefel. 1952. “Methods of conjugate gradients for solving linear systems.” J. Res. Natl. Bur. Stand. 49 (6): 409. https://doi.org/10.6028/jres.049.044.
Hloele, S. T., and K. D. Moletsane. 2004. “Experiences with the precast segmental lining for the Mohale tunnel in Lesotho.” In Vol. 19 of Tunneling and Underground Space Technology: Underground Space for Sustainable Urban Development: Proc., 30th ITA-AITES World Tunnel Congress. Singapore. New York: Elsiever.
Iasiello, C. 2017. “Behaviour of transversal joints in prefabricated tunnel linings: Experimental and theoretical study.” Ph.D. thesis, Dept. of Continuum Mechanics and Structures, Technical Univ. of Madrid.
Iasiello, C., A. Pérez Caldentey, and G. Groli. 2017. “Analysis of TBM lining rings under lack of gap fill: Ovalisation and crack patterns: A practical case.” J. Perform. Constr. Facil. 31 (4): 04017020. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001010.
JSCE (Japan Society of Civil Engineers). 2005. Interim report on construction loads on segment. [In Japanese.] Shinjuku, Japan: JSCE.
Kolic, D. 2000. “Quality recommendations on segmental lining for shield drive in hard rock.” In Proc., Int. Conf. on Tunnels and Underground Structures ISRM, 355–362. Singapore: A.A. Balkema.
Kolic, D., and A. Mayerhofer. 2009. “Segmental lining tolerances and imperfections.” In Proc., ITA WTC 2009 Symp., 8.
Liao, S. 2012. “Identifying TBM tunneling defects through recognition of ground settlement patterns.” In Proc., GeoCongress 2012. Reston, VA: ASCE.
Maisonobe, L. 2007. “Finding the circle that best fits a set of points.” Accessed October 25, 2007. https://www.spaceroots.org/documents/circle/circle-fitting.pdf.
Nuttens, T., A. De Wulf, G. Deruyter, C. Stal, H. De Backer, and K. Schotte. 2012. “Application of laser scanning for deformation measurements: A comparison between different types of scanning instruments.” In Proc., FIG Working Week 2012. Rome: International Federation of Surveyors.
Schreyer, J., and D. Winselmann. 1998. Eignungsprüfungen für die Tübbingauskleidung der 4 Röhre des Elbtunnels, Hamburg. Essen, Germany: Leibniz Association.
Shewchuk, J. R. 1994. An introduction to the conjugate gradient method without the agonizing pain. Pittsburgh: School of Computer Science, Carnegie Mellon Univ.
STUVA (Studiengesellschaft für Unterirdische Verkehrsanlagen). 1996. Eignungsprüfungen 4: Röhre Elbtunnel: Versuche zur Verdrehsteifigkeit. Cologne, Germany: STUVA.
Sugimoto, M. 2006. “Causes of shield damages during construction.” In Proc., Int. Symp. on Underground Excavation and Tunneling, 67–74. Bangkok, Thailand: International Tunneling Association.
Zerpa, L., and J. Colmenares. 2004. Optimización para ingenieros. Maracaibo, Venezuela: Univ. of Zulia.
Zhang, L., W. Zhou, and D. H. Li. 2006. “A descent modified Polak–Ribiere–Polak conjugate gradient method and its global convergence.” IMA J. Numer. Anal. 26 (4): 629–640. https://doi.org/10.1093/imanum/drl016.
Information & Authors
Information
Published In
Copyright
©2018 American Society of Civil Engineers.
History
Received: Dec 12, 2017
Accepted: May 9, 2018
Published online: Sep 27, 2018
Published in print: Dec 1, 2018
Discussion open until: Feb 27, 2019
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.