Rehabilitation of the Core Zone of an Earth-Fill Dam
Publication: Journal of Performance of Constructed Facilities
Volume 27, Issue 4
Abstract
This paper provides a detailed study of remediation work on the core zone of a damaged earth-fill dam. The relevant material includes a review of the dam surface survey data, leakage monitoring data, drilling method, grouting material, and drilling and grouting procedure. A compaction grouting method was selected as the remediation technique. In addition, the reduction and prevention of leakage and settlement were assessed. Compaction grouting was successful for filling voids, closing channels, and compacting the disturbed core soils. The loose or voided zones were properly filled, and the leakage was reduced after compaction grouting. Verification of the compaction grouting work was performed by evaluating the grouting pressures and volumes injected internally and by monitoring the dam leakage rate and tracer externally. All of these factors provide a good indication of changes inside the core of the dam, including reduction or closure of the leakage channels in the dam core.
Get full access to this article
View all available purchase options and get full access to this article.
References
Bruce, D. A. (1989). “Contemporary practice in geotechnical drilling and grouting.” Proc., 1st Canadian Int. Grouting Seminar, USDOE, Washington, DC.
Bruce, D. A. (1990). “The practice and potential of grouting in major dam rehabilitation.” ASCE Annual Civil Eng. Convention, ASCE, Reston, VA, 41.
Chun, B. S., Lee, Y. J., and Chung, H. I. (2006). “Effectiveness of leakage control after application of permeation grouting to earth fill dam.” KSCE J. Civil Eng., 10(6), 405–414.
Davidson, R. R. (1990). “Rehabilitation of dam foundations.” Report, Woodward Clyde Consultants, Denver.
Kemp, E. B. (1974). “Emergency grouting of old river low sill structure.” Proc., ASCE Conf., ASCE, Reston, VA, 343–370.
Kolymbas, D. (2005). “Tunnelling and tunnel mechanics, Part I: Grouting and freezing.” Chapter 6, Grouting and freezing, Springer-Verlag, Berlin, 159–170.
Korea Water Resources Corporation. (2000). Precise safety diagnosis of Gyeongbuk Cheongdo-gun.” Report, Unmun Dam.
Krinitzsky, E. L., and Hynes, M. E. (2002). “The Bhuj, India, Earthquake: Lessons learned for earthquake safety of dams on alluvium.” Eng. Geol., 66(3–4), 163–196.
Paul, D. K. (2004). “Assessment of damage and rehabilitation of small and medium earth dams.” Proc., 13th World Conf. Earthq. Eng., Mira Digital Publishing, St. Louis.
Raul, F. B., Martin, R. R., and Emir, J. M. (2011). “Internal erosion and rehabilitation of an earth-rock dam.” J. Geotech. Geoenviron. Eng., 137(2), 150–160.
Rodda, K.V., and Pardini, R. J. (1990). “Remedial construction at Austrian dam following the Loma Prieta Earthquake.” USCOLD Newsletter, July(92), 21–24.
U.S. Army Corps of Engineers. (2004). “General design and construction considerations for earth and rock-fill dams.” Rep. EM1110-2-2300, Washington, DC.
Yadav, S. M., Mishra, R., and Samtani, B. K. (2008). “Rehabilitation of earthquake affected Tapar dam, Gujarat, India.” Proc., 12th IACMAG, Curran Associates, Red Hook, NY, 4744–4747.
Yang, X.-L., and Zou, J.-F. (2009). “Estimation of compaction grouting pressure in strain softening soils.” J. Central South Univ. Technol., 16(4), 653–657.
Information & Authors
Information
Published In
Copyright
© 2013 American Society of Civil Engineers.
History
Received: Aug 7, 2011
Accepted: Jan 31, 2012
Published online: Feb 2, 2012
Published in print: Aug 1, 2013
Authors
Metrics & Citations
Metrics
Citations
Download citation