Evaluation Study on the Instrumentation System of Cindere Dam
Publication: Journal of Performance of Constructed Facilities
Volume 23, Issue 6
Abstract
The first hardfill dam in Turkey, Cindere Dam, has recently been constructed and a number of instruments have been installed. The aim of this study is to review the capability of the current instrumentation system and to observe the feasibility of possible alternative measurement systems. To this end, the current instrumentation system has been evaluated as a whole with reference to the parameters measured, instruments, and data acquisition system. Afterward, an alternative instrumentation system was developed by considering additional parameters and instruments to the current system. Furthermore, each instrumentation system equipped with manual and automatic data acquisition systems was considered. The comparison between the current and alternative instrumentation systems was also carried out in terms of technical and economical aspects. Although the current instrumentation system was found to be satisfactory according to the commonly used dam instrumentation practices, it was observed that the alternative system promotes the current one in various aspects without increasing the cost significantly.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The writers thank S. Gulru Yildiz and Dr. A. Fikret Gurdil who provided relevant data and made constructive criticism throughout the conduction of this research.
References
ASCE. (2000). Guidelines for instrumentation and measurements for monitoring dam performance, ASCE, Reston, Va.
Aydin, R. K. (2007). “The important function of dam instrumentation systems in dam safety.” Proc., 1st National Symp. on Dam Safety, DSI, Ankara, Turkey, 733–739 (in Turkish).
Bartholomew, C. L., and Haverland, L. M. (1987). Concrete dam instrumentation manual, U.S. Dept. of Interior Bureau of Reclamation, Denver.
Batmaz, S. (2003). “Cindere Dam, 107-m-high roller compacted hardfill dam in Turkey.” Proc., IV Int. Symp. on Roller Compacted Concrete Dams, Balkema, The Netherlands, 121–126.
Batmaz, S., Koksal, A., Ergeneman, I., and Pekcagliyan, D. (2003). “Design of the 100-m-high Oyuk hardfill dam.” Int. J. Hydropow. Dams, 10(5), 138–143.
CB-HES. (2007). “The report of micro-tremor study on Cindere Dam and Hydroelectric Power Plant.” Rep. Prepared for General Directorate of Disaster Affairs Earthquake Research Dept., Micro-Zonation Subdivision, Ankara, Turkey (in Turkish).
Darbre, G. R. (1995). “Strong-motion instrumentation of dams.” Earthquake Eng. Struct. Dyn., 24, 1101–1111.
Dunnicliff, J., and Green, E. G. (1988). Geotechnical instrumentation for monitoring field performance, Wiley, New York.
Global Water Inc. (GW). (2007). Instrumentation resource book, ⟨http://www.globalw.com⟩ (May 2008).
Gurdil, A. F., and Batmaz, S. (2003). “Structural design of Cindere Dam.” Proc., 4th Int. Symp. on Roller Compacted Concrete Dams, Balkema, The Netherlands, 439–446.
Spalton, C. (1997). “Instrumentation of concrete-faced rockfill dams.” Int. J. Hydropow. Dams, 4(6), 80–81.
Spalton, C. (2000). “Rehabilitation of safety monitoring instrumentation for embankment dams.” Int. J. Hydropow. Dams, 7(5), 80–82.
Information & Authors
Information
Published In
Copyright
© 2009 ASCE.
History
Received: Oct 23, 2008
Accepted: Apr 27, 2009
Published online: Apr 29, 2009
Published in print: Dec 2009
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.