Abstract

Deep excavations conducted close to tunnels will cause an adverse impact on tunnels, and countermeasures must be taken during the excavation to ensure the safety of the tunnels. However, the effectiveness of measures to control the vertical displacement of tunnels is still unclear, especially when a cut-and-cover tunnel is tied to a deep excavation. In this study, a three-dimensional (3D) numerical method is used to evaluate the effectiveness of control measures for excavation-induced tunnel deformations. Based on a recent case of a deep excavation in Shanghai, a quasi-three-dimensional numerical model considering the soil–structure interaction and fluid–solid coupling was built by the use of finite difference software, i.e., FLAC3D v5.0. Four countermeasures, i.e., zoned excavation with partition walls and cross walls, piles tied to the walls, soil reinforcement, and dewatering in the confined aquifer, were implemented in this model. The numerical model was validated by field data and the effectiveness of these measures was evaluated comprehensively. Results indicate that the zoned excavation can reduce the vertical displacement of the tunnel, while the cross wall will cause an adverse impact on restraining the tunnel heave. Installation of tie piles can decrease the uplift of tunnels, and the maximum tunnel heave decreases with the increase of the length of the tie piles. Soil improvement is the most effective countermeasure that can reduce the tunnel heave significantly. Dewatering in a confined aquifer can be adopted as a countermeasure to restrain the tunnel heave during excavation.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The financial support from the National Natural Science Foundation of China (NSFC Grant Nos. 41602283, 41330633, and 41727802) is gratefully acknowledged.

References

Chang, C. T., C. W. Sun, S. W. Duann, and R. N. Hwang. 2001. “Response of a Taipei Rapid Transit System (TRTS) tunnel to adjacent excavation.” Tunnelling Underground Space Technol. 16 (3): 151–158. https://doi.org/10.1016/S0886-7798(01)00049-9.
Chen, J. J., Y. F. Zhu, M. G. Li, and S. L. Wen. 2014. “Novel excavation and construction method of an underground highway tunnel above operating metro tunnels.” J. Aerosp. Eng. 28 (6): A4014003. https://doi.org/10.1061/(ASCE)AS.1943-5525.0000437.
Demeijer, O., J. J. Chen, M. G. Li, J. H. Wang, and C. J. Xu. 2018. “Influence of passively loaded piles on excavation-induced diaphragm wall displacements and ground settlements.” Int. J. Geomech. 18 (6): 04018052. https://doi.org/10.1061/(ASCE)GM.1943-5622.0001126.
Dolezalova, M. 2001. “Tunnel complex unloaded by a deep excavation.” Comput. Geotech. 28 (6–7): 469–493. https://doi.org/10.1016/S0266-352X(01)00005-2.
Dong, Y. P., H. Burd, G. Houlsby, and Y. M. Hou. 2014. “Advanced finite element analysis of a complex deep excavation case history in Shanghai.” Front. Struct. Civ. Eng. 8 (1): 93–100. https://doi.org/10.1007/s11709-014-0232-3.
Dong, Y. P., H. J. Burd, and G. T. Houlsby. 2015. “Finite-element analysis of a deep excavation case history.” Géotechnique 66 (1): 1–15. https://doi.org/10.1680/jgeot.14.P.234.
Finno, R. J., D. K. Atmatzidis, and S. B. Perkins. 1989. “Observed performance of a deep excavation in clay.” J. Geotech. Eng. 115 (8): 1045–1064. https://doi.org/10.1061/(ASCE)0733-9410(1989)115:8(1045).
Goh, A. T. C., F. Zhang, W. Zhang, Y. Zhang, and H. Liu. 2017. “A simple estimation model for 3D braced excavation wall deflection.” Comput. Geotech. 83: 106–113. https://doi.org/10.1016/j.compgeo.2016.10.022.
Guo, F., W. Gu, J. J. Tang, and M. H. Murong. 2013. “Research on deformation stability of soft rock slope under excavation based on FLAC3D.” Appl. Mech. Mater. 275–277: 290–294. https://doi.org/10.4028/www.scientific.net/AMM.275-277.290.
Han, L., G. L. Ye, J. J. Chen, X. H. Xia, and J. H. Wang. 2017. “Pressures on the lining of a large shield tunnel with a small overburden: A case study.” Tunnelling Underground Space Technol. 64: 1–9. https://doi.org/10.1016/j.tust.2017.01.008.
He, Z., Z. Peng, P. Cao, and H. Lin. 2009. “Numerical analysis for roof stability of double gob area after excavation by FLAC∼(3D).” J. Cent. South Univ. Technol. 40 (4): 1066–1071.
Hsieh, H. S., Y. C. Lu, and T. M. Lin. 2008. “Effects of joint details on the behavior of cross walls.” J. GeoEng. 3 (2): 55–60.
Hsieh, H. S., C. C. Wang, and C. Y. Ou. 2003. “Use of jet grouting to limit diaphragm wall displacement of a deep excavation.” J. Geotech. Geoenviron. Eng. 129 (2): 146–157. https://doi.org/10.1061/(ASCE)1090-0241(2003)129:2(146).
Hsieh, P. G., and C. Y. Ou. 2012. “Analysis of deep excavations in clay under the undrained and plane strain condition with small strain characteristics.” J. Chin. Inst. Eng. 35 (5): 601–616. https://doi.org/10.1080/02533839.2012.679115.
Hu, Z. F., Z. Q. Yue, J. Zhou, and L. G. Tham. 2003. “Design and construction of a deep excavation in soft soils adjacent to the Shanghai Metro tunnels.” Can. Geotech. J. 40 (5): 933–948. https://doi.org/10.1139/t03-041.
Huang, L. C., Z. S. Xu, and C. Y. Zhou. 2009. “Modeling and monitoring in a soft argillaceous shale tunnel.” Acta Geotech. 4 (4): 273–282. https://doi.org/10.1007/s11440-009-0100-9.
Huang, X., H. F. Schweiger, and H. W. Huang. 2013. “Influence of deep excavations on nearby existing tunnels.” Int. J. Geomech. 13 (2): 170–180. https://doi.org/10.1061/(ASCE)GM.1943-5622.0000188.
Itasca. 2014. FLAC3D. Fast Lagrangian analysis of continua in 3-dimensions. Minneapolis: Itasca.
Kuta, Y., M. Maruoka, M. Aoki, and E. Sato. 1994. “Application of the observational method to a deep basement excavated using the top-down method.” Geotechnique 44 (4): 655–664. https://doi.org/10.1680/geot.1994.44.4.655.
Li, M. G., J. J. Chen, J. H. Wang, and Y. F. Zhu. 2018. “Comparative study of construction methods for deep excavations above shield tunnels.” Tunnelling Underground Space Technol. 71: 329–339. https://doi.org/10.1016/j.tust.2017.09.014.
Li, M. G., J. J. Chen, A. J. Xu, and X. H. Xia. 2014. “Case study of innovative top-down construction method with channel-type excavation.” J. Constr. Eng. Manage. 140 (5): 05014003. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000828.
Li, M. G., J. H. Wang, J. J. Chen, and Z. J. Zhang. 2017a. “Responses of a newly built metro line connected to deep excavations in soft clay.” J. Perform. Constr. Facil. 31 (6): 04017096. https://doi.org/10.1061/(ASCE)CF.1943-5509.0001091.
Li, M. G., Z. J. Zhang, J. J. Chen, J. H. Wang, and A. J. Xu. 2017b. “Zoned and staged construction of an underground complex in Shanghai soft clay.” Tunnelling Underground Space Technol. 67: 187–200. https://doi.org/10.1016/j.tust.2017.04.016.
Liu, G. B., P. Huang, J. W. Shi, and C. W. W. Ng. 2016. “Performance of a deep excavation and its effect on adjacent tunnels in Shanghai soft clay.” J. Perform. Constr. Facil. 30 (6): 04016041. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000891.
Liu, H. L., P. Li, and J. Y. Liu. 2011. “Numerical investigation of underlying tunnel heave during a new tunnel construction.” Tunnelling Underground Space Technol. 26 (2): 276–283. https://doi.org/10.1016/j.tust.2010.10.002.
Long, M. 2001. “Database for retaining wall and ground movements due to deep excavations.” J. Geotech. Geoenviron. Eng. 127 (3): 203–224. https://doi.org/10.1061/(ASCE)1090-0241(2001)127:3(203).
Ng, C. W. W., J. W. Shi, and Y. Hong. 2013. “Three-dimensional centrifuge modelling of basement excavation effects on an existing tunnel in dry sand.” Can. Geotech. J. 50 (8): 874–888. https://doi.org/10.1139/cgj-2012-0423.
Ou, C. Y., P. G. Hsieh, and Y. L. Lin. 2011. “Performance of excavations with cross walls.” J. Geotech. Geoenviron. Eng. 137 (1): 94–104. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000402.
Ou, C. Y., P. G. Hsieh, and Y. L. Lin. 2013. “A parametric study of wall deflections in deep excavations with the installation of cross walls.” Comput. Geotech. 50 (5): 55–65. https://doi.org/10.1016/j.compgeo.2012.12.009.
Ou, C. Y., Y. L. Lin, and P. G. Hsieh. 2006. “Case record of an excavation with cross walls and buttress walls.” J. GeoEng. 1 (2): 79–86. https://doi.org/10.6310/jog.2006.1(2).4.
Ou, C. Y., F. C. Teng, and I. W. Wang. 2008. “Analysis and design of partial ground improvement in deep excavations.” Comput. Geotech. 35 (4): 576–584. https://doi.org/10.1016/j.compgeo.2007.09.005.
Ou, C. Y., T. S. Wu, and H. S. Hsieh. 1996. “Analysis of deep excavation with column type of ground improvement in soft clay.” J. Geotech. Eng. 122 (9): 709–716. https://doi.org/10.1061/(ASCE)0733-9410(1996)122:9(709).
Sharma, J. S., A. M. Hefny, J. Zhao, and C. W. Chan. 2001. “Effect of large excavation on deformation of adjacent MRT tunnels.” Tunnelling Underground Space Technol. 16 (2): 93–98. https://doi.org/10.1016/S0886-7798(01)00033-5.
Shi, J. W., C. W. W. Ng, and Y. H. Chen. 2015. “Three-dimensional numerical parametric study of the influence of basement excavation on existing tunnel.” Comput. Geotech. 63: 146–158. https://doi.org/10.1016/j.compgeo.2014.09.002.
Tan, Y., X. Li, Z. Kang, J. Liu, and Y. Zhu. 2015. “Zoned excavation of an oversized pit close to an existing metro line in stiff clay: Case study.” J. Perform. Constr. Facil. 29 (6): 04014158. https://doi.org/10.1061/(ASCE)CF.1943-5509.0000652.
Wang, J. H., Z. H. Xu, and W. D. Wang. 2010. “Wall and ground movements due to deep excavations in Shanghai soft soils.” J. Geotech. Geoenviron. Eng. 136 (7): 985–994. https://doi.org/10.1061/(ASCE)GT.1943-5606.0000299.
Ye, G. L., T. Hashimoto, S. L. Shen, H. H. Zhu, and T. H. Bai. 2015. “Lessons learnt from unusual ground settlement during Double-O-Tube tunnelling in soft ground.” Tunnelling Underground Space Technol. 49: 79–91. https://doi.org/10.1016/j.tust.2015.04.008.
Zhang, J. F., J. J. Chen, J. H. Wang, and Y. F. Zhu. 2013. “Prediction of tunnel displacement induced by adjacent excavation in soft soil.” Tunnelling Underground Space Technol. 36 (2): 24–33. https://doi.org/10.1016/j.tust.2013.01.011.
Zhang, W., and A. T. C. Goh. 2012. “Reliability assessment on ultimate and serviceability limit states and determination of critical factor of safety for underground rock caverns.” Tunnelling Underground Space Technol. 32: 221–230. https://doi.org/10.1016/j.tust.2012.07.002.
Zhang, W., and A. T. C. Goh. 2016. “General behavior of braced excavation in Bukit Timah Granite residual soils: A case study.” Int. J. Geoeng. Case Histories 3 (3): 190–202. https://doi.org/10.4417/IJGCH-03-05-05.
Zheng, G., and S. W. Wei. 2008. “Numerical analyses of influence of overlying pit excavation on existing tunnels.” Supplement, J. Cent. South Univ. Technol. 15 (S2): 069–075. https://doi.org/10.1007/s11771-008-0438-4.
Zheng, G., X. Yang, H. Zhou, Y. Du, J. Sun, and X. Yu. 2018. “A simplified prediction method for evaluating tunnel displacement induced by laterally adjacent excavations.” Comput. Geotech. 95: 119–128. https://doi.org/10.1016/j.compgeo.2017.10.006.

Information & Authors

Information

Published In

Go to Journal of Aerospace Engineering
Journal of Aerospace Engineering
Volume 31Issue 6November 2018

History

Received: Jun 5, 2017
Accepted: Apr 2, 2018
Published online: Sep 6, 2018
Published in print: Nov 1, 2018
Discussion open until: Feb 6, 2019

Permissions

Request permissions for this article.

Authors

Affiliations

Ph.D. Student, State Key Laboratory of Ocean Engineering, Dept. of Civil Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, China. Email: [email protected]
Ming-Guang Li [email protected]
Assistant Professor, State Key Laboratory of Ocean Engineering, Dept. of Civil Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, China (corresponding author). Email: [email protected]
Jian-Hua Wang [email protected]
Deceased; formerly, Professor, State Key Laboratory of Ocean Engineering, Dept. of Civil Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, China. Email: [email protected]
Jin-Jian Chen, A.M.ASCE [email protected]
Professor, State Key Laboratory of Ocean Engineering, Dept. of Civil Engineering, Shanghai Jiao Tong Univ., 800 Dongchuan Rd., Shanghai 200240, China. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share