Decision Support Tool for Design-Build Assessment: A Quasi-Experimental Study in Malaysia

Publication: Journal of Architectural Engineering
Volume 28, Issue 3

Abstract

The interventions of decision support tools and techniques are necessary for making decisions on complex issues that involve numerous parameters. In the construction industry, the identified barriers that affect the implementation of decision support tools revolve around the issues of scarce information, diverse project characteristics, bureaucracy, and low precision of statistical decision models. This study aimed to design a decision support tool for the assessment of the suitability of a design-build method (hereafter DST-DB), which can efficiently assist practitioners in the adoption (or rejection) of the design-build method with greater convenience. The selection factors were identified by compiling and validating key design-build selection factors of critical success factors (CSFs) and design-build-drivers (DBDs) through an extensive literature review and consulting with industry experts, resulting in the development of DST-DB. The obtained results showed the influence of DST-DB on the practitioners’ perceptions of a design-build method, where DST-DB recorded significantly higher usability, likelihood, precision, confidence, and satisfaction rate than the conventional approach (multicriteria decision analysis) of decision-making in the construction industry. There have been many other decision support studies over the years, but the current study served as one of the first decision support studies for design-build construction projects in the construction industry, which offered appreciative insights into the importance of adopting CSFs and DBDs in decision support tools (DST-DB).

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The authors gratefully acknowledged the support received from the University of Malaysia Pahang under UMP Grant Award RDU-190340. The authors would thank all practitioners who participated in this study.

References

Aaltonen, K., and J. Kujala. 2016. “Towards an improved understanding of project stakeholder landscapes.” Int. J. Project Manage. 34 (8): 1537–1552. https://doi.org/10.1016/j.ijproman.2016.08.009.
Abdul-Rashid, S. H., N. Sakundarini, R. Ariffin, and T. Ramayah. 2017. “Drivers for the adoption of sustainable manufacturing practices: A Malaysia perspective.” Int. J. Precis. Eng. Manuf. 18 (11): 1619–1631. https://doi.org/10.1007/s12541-017-0191-4.
Abuwarda, Z., and T. Hegazy. 2016. “Flexible activity relations to support optimum schedule acceleration.” J. Constr. Eng. Manage. 142 (11): 06016004. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001193.
Ali, A. K. 2019. “A case study in developing an interdisciplinary learning experiment between architecture, building construction, and construction engineering and management education.” Eng. Constr. Archit. Manage. 26 (9): 2040–2059. https://doi.org/10.1108/ECAM-07-2018-0306.
Ameyaw, E. E., A. P. Chan, and D. G. Owusu-Manu. 2017. “A survey of critical success factors for attracting private sector participation in water supply projects in developing countries.” J. Facilities Manage. 15 (1): 35–61. https://doi.org/10.1108/JFM-06-2016-0027.
An, X., Z. Wang, H. Li, and J. Ding. 2018. “Project delivery system selection with interval-valued intuitionistic fuzzy set group decision-making method.” Group Decis. Negotiation 27 (4): 689–707. https://doi.org/10.1007/s10726-018-9581-y.
Aydin, Y. C., P. A. Mirzaei, and J. Hale. 2021. “Using machine learning techniques to predict esthetic features of buildings.” J. Archit. Eng. 27 (3): 04021023. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000477.
Banihashemi, S., M. R. Hosseini, H. Golizadeh, and S. Sankaran. 2017. “Critical success factors (CSFs) for integration of sustainability into construction project management practices in developing countries.” Int. J. Project Manage. 35 (6): 1103–1119. https://doi.org/10.1016/j.ijproman.2017.01.014.
Bohari, A. A. M., M. Skitmore, B. Xia, M. Teo, and N. Khalil. 2020. “Key stakeholder values in encouraging green orientation of construction procurement.” J. Cleaner Prod. 270: 122246. https://doi.org/10.1016/j.jclepro.2020.122246.
Carbonara, N., N. Costantino, and R. Pellegrino. 2016. “A transaction costs-based model to choose PPP procurement procedures.” Eng. Constr. Archit. Manage. 23 (4): 491–510. https://doi.org/10.1108/ECAM-07-2014-0099.
Chen, P.-H., and T. C. Nguyen. 2019. “A BIM-WMS integrated decision support tool for supply chain management in construction.” Autom. Constr. 98: 289–301. https://doi.org/10.1016/j.autcon.2018.11.019.
Chen, Q., Z. Jin, B. Xia, P. Wu, and M. Skitmore. 2016. “Time and cost performance of design–build projects.” J. Constr. Eng. Manage. 142 (2): 04015074. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056.
Darko, A., C. Zhang, and A. P. Chan. 2017. “Drivers for green building: A review of empirical studies.” Habitat Int. 60: 34–49. https://doi.org/10.1016/j.habitatint.2016.12.007.
Dehlendorf, C., J. Fitzpatrick, J. Steinauer, L. Swiader, K. Grumbach, C. Hall, and M. Kuppermann. 2017. “Development and field testing of a decision support tool to facilitate shared decision making in contraceptive counseling.” Patient Educ. Couns. 100 (7): 1374–1381. https://doi.org/10.1016/j.pec.2017.02.009.
Demetracopoulou, V., W. J. O’Brien, and N. Khwaja. 2020. “Lessons learned from selection of project delivery methods in highway projects: the Texas experience.” J. Leg. Aff. Dispute Resolut. Eng. Constr. 12 (1): 04519040. https://doi.org/10.1061/(ASCE)LA.1943-4170.0000340.
Demirkesen, S., and B. Ozorhon. 2017. “Impact of integration management on construction project management performance.” Int. J. Project Manage. 35 (8): 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008.
Dilnot, C. 2018. “Thinking design: A personal perspective on the development of the Design Research Society.” Des. Stud. 54: 142–145. https://doi.org/10.1016/j.destud.2017.11.002.
Ding, Z., M. Zhu, V. W. Y. Tam, G. Yi, and C. N. N. Tran. 2018. “A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages.” J. Cleaner Prod. 176: 676–692. https://doi.org/10.1016/j.jclepro.2017.12.101.
Feghaly, J., M. El Asmar, S. Ariaratnam, and W. Bearup. 2020. “Selecting project delivery methods for water treatment plants.” Eng. Constr. Archit. Manage. 27 (4): 936–951. https://doi.org/10.1108/ECAM-06-2019-0308.
Fewings, P., and C. Henjewele. 2019. Construction project management: An integrated approach. London: Routledge.
Gunarathne, A. S., N. Zainudeen, C. S. R. Perera, and B. A. K. S. Perera. 2020. “A framework of an integrated sustainability and value engineering concepts for construction projects.” Int. J. Constr. Manage. 1–13. https://doi.org/10.1080/15623599.2020.1768624.
Hamzeh, F., F. Rached, Y. Hraoui, A. J. Karam, Z. Malaeb, M. El Asmar, and Y. Abbas. 2019. “Integrated project delivery as an enabler for collaboration: A Middle East perspective.” Built Environ. Project Asset Manage. 9 (3): 334–347. https://doi.org/10.1108/BEPAM-05-2018-0084.
Hsu, P. Y., P. Angeloudis, and M. Aurisicchio. 2018. “Optimal logistics planning for modular construction using two-stage stochastic programming.” Autom. Constr. 94: 47–61. https://doi.org/10.1016/j.autcon.2018.05.029.
Jato-Espino, D., E. Castillo-Lopez, J. Rodriguez-Hernandez, and J. C. Canteras-Jordana. 2014. “A review of application of multi-criteria decision making methods in construction.” Autom. Constr. 45: 151–162. https://doi.org/10.1016/j.autcon.2014.05.013.
Jeng, J. 2005. “Usability assessment of academic digital libraries: Effectiveness, efficiency, satisfaction, and learnability.” Libri 55 (2): 96–121.
Juan, Y.-K., W.-Y. Lai, and S.-G. Shih. 2017. “Building information modeling acceptance and readiness assessment in Taiwanese architectural firms.” J. Civ. Eng. Manage. 23 (3): 356–367. https://doi.org/10.3846/13923730.2015.1128480.
Kalan, D., and M. E. Ozbek. 2020. “Development of a construction project bidding decision-making tool.” Pract. Period. Struct. Des. Constr. 25 (1): 04019032. https://doi.org/10.1061/(ASCE)SC.1943-5576.0000457.
Kometa, S. T., P. O. Olomolaiye, and F. C. Harris. 1994. “Attributes of UK construction clients influencing project consultants’ performance.” Construct. Manage. Econ. 12 (5): 433–443. https://doi.org/10.1080/01446199400000053.
Labonnote, N., C. Skaar, and P. Rüther. 2017. “The potential of decision support systems for more sustainable and intelligent constructions: A short overview.” Procedia Manuf. 12: 33–41. https://doi.org/10.1016/j.promfg.2017.08.006.
Leontaris, G., O. Morales-Nápoles, A. Dewan, and A. R. M. Wolfert. 2019. “Decision support for offshore asset construction using expert judgments for supply disruptions risk.” Autom. Constr. 107: 102903. https://doi.org/10.1016/j.autcon.2019.102903.
Lines, B. C., and P. K. Reddy Vardireddy. 2017. “Drivers of organizational change within the AEC industry: Linking change management practices with successful change adoption.” J. Manage. Eng. 33 (6): 04017031. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000548.
Liu, F., C. J. Anumba, A. K. Jallow, and P. Carrillo. 2020. “Integrated change and knowledge management approach for energy retrofits.” J. Archit. Eng. 26 (1): 04019033. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000380.
Maciejewski, M. L. 2020. “Quasi-experimental design.” Biostat. Epidemiol. 4 (1): 38–47. https://doi.org/10.1080/24709360.2018.1477468.
Marcher, C., A. Giusti, and D. T. Matt. 2020. “Decision support in building construction: a systematic review of methods and application areas.” Buildings 10 (10): 170. https://doi.org/10.3390/buildings10100170.
Marzouk, M., and A. Abubakr. 2016. “Decision support for tower crane selection with building information models and genetic algorithms.” Autom. Constr. 61: 1–15. https://doi.org/10.1016/j.autcon.2015.09.008.
McGlinn, K., B. Yuce, H. Wicaksono, S. Howell, and Y. Rezgui. 2017. “Usability evaluation of a web-based tool for supporting holistic building energy management.” Autom. Constr. 84: 154–165. https://doi.org/10.1016/j.autcon.2017.08.033.
Ness, D. A., and K. Xing. 2020. “Consumption-based and embodied carbon in the built environment: Implications for APEC’s low-carbon model town project.” J. Green Build. 15 (3): 67–82. https://doi.org/10.3992/jgb.15.3.67.
Nguyen, L. H. 2019. “Relationships between critical factors related to team behaviors and client satisfaction in construction project organizations.” J. Constr. Eng. Manage. 145 (3): 04019002. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001620.
Nguyen, P. H., B. C. Lines, and D. Q. Tran. 2018. “Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes.” J. Constr. Eng. Manage. 144 (10): 04018093. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001550.
Naoum, S. G., and C. Egbu. 2016. “Modern selection criteria for procurement methods in construction: A state-of-the-art literature review and a survey.” Int. J. Managing Projects Business. 9 (2): 309–336. https://doi.org/10.1108/IJMPB-09-2015-0094.
Norusis, M. J. 2004. “ANOVA method.” SPSS 13: 179–181.
Osei-Kyei, R., and A. P. Chan. 2015. “Review of studies on the critical success factors for public–private partnership (PPP) projects from 1990 to 2013.” Int. J. Project Manage. 33 (6): 1335–1346. https://doi.org/10.1016/j.ijproman.2015.02.008.
Ott, R. L., and M. T. Longnecker. 2015. An introduction to statistical methods and data analysis. Boston: Cengage Learning.
Panuwatwanich, K., and R. A. Stewart. 2012. “Evaluating innovation diffusion readiness among architectural and engineering design firms: Empirical evidence from Australia.” Autom. Constr. 27: 50–59. https://doi.org/10.1016/j.autcon.2012.05.009.
Park, J., and Y. H. Kwak. 2017. “Design-Bid-Build (DBB) vs. Design-Build (DB) in the U.S. public transportation projects: The choice and consequences.” Int. J. Project Manage. 35 (3): 280–295. https://doi.org/10.1016/j.ijproman.2016.10.013.
Poh, C. Q., C. U. Ubeynarayana, and Y. M. Goh. 2018. “Safety leading indicators for construction sites: A machine learning approach.” Autom. Constr. 93: 375–386. https://doi.org/10.1016/j.autcon.2018.03.022.
Semaan, N., and M. Salem. 2017. “A deterministic contractor selection decision support system for competitive bidding.” Eng. Constr. Archit. Manage. 24 (1): 61–77. https://doi.org/10.1108/ECAM-06-2015-0094.
Shalaby, A., and A. Hassanein. 2019. “A decision support system (DSS) for facilitating the scenario selection process of the renegotiation of PPP contracts.” Eng. Constr. Archit. Manage. 26 (6): 1004–1023. https://doi.org/10.1108/ECAM-01-2018-0010.
Sharafi, P., M. Rashidi, B. Samali, H. Ronagh, and M. Mortazavi. 2018. “Identification of factors and decision analysis of the level of modularization in building construction.” J. Archit. Eng. 24 (2): 04018010. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000313.
Sharma, K. K., D. Israel, and B. Bhalla. 2019. “Does previous work experience matter in students’ learning in higher project management education?” Eng. Constr. Archit. Manage. 28 (1): 424–450. https://doi.org/10.1108/ECAM-01-2019-0015.
Shrestha, P. P., and J. D. Fernane. 2017. “Performance of design-build and design-bid-build projects for public universities.” J. Constr. Eng. Manage. 143 (3): 04016101. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001241.
Small, E. P., and M. Al Mazrooei. 2016. “Alternative approaches for development of a construction-specific decision support tool for sustainable construction operations.” Procedia Eng. 145: 1013–1020. https://doi.org/10.1016/j.proeng.2016.04.131.
Sullivan, J., M. El Asmar, J. Chalhoub, and H. Obeid. 2017. “Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality.” J. Constr. Eng. Manage. 143 (6): 04017009. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001282.
Szafranko, E. 2019. “The variant of construction projects and their assessment taking into account the impact on the environment.” IOP Conf. Ser.: Mater. Sci. Eng. 603 (2): 022096. https://doi.org/10.1088/1757-899X/603/2/022096.
Thompson, B. P., and L. C. Bank. 2010. “Use of system dynamics as a decision-making tool in building design and operation.” Build. Environ. 45 (4): 1006–1015. https://doi.org/10.1016/j.buildenv.2009.10.008.
Vashani, H., J. Sullivan, and M. El Asmar. 2016. “DB 2020: Analyzing and forecasting design-build market trends.” J. Constr. Eng. Manage. 142 (6): 04016008. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001113.
Wang, C., S. C. Loo, J. B. H. Yap, and H. Abdul-Rahman. 2019. “Novel capability-based risk assessment calculator for construction contractors venturing overseas.” J. Constr. Eng. Manage. 145 (10): 04019059. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001696.
Wuni, I. Y., Z. Wu, G. Q. Shen, J. T. Bugri, and J. Frimpong-Asante. 2021. “Benefit evaluation of design for excellence in industrialized construction projects.” J. Archit. Eng. 27 (4): 05021015. https://doi.org/10.1061/(ASCE)AE.1943-5568.0000505.
Whyte, J. 2019. “How digital information transforms project delivery models.” Project Manage. J. 50 (2): 177–194. https://doi.org/10.1177/8756972818823304.
Zavichi, A., K. Madani, P. Xanthopoulos, and A. A. Oloufa. 2014. “Enhanced crane operations in construction using service request optimization.” Autom. Constr. 47: 69–77. https://doi.org/10.1016/j.autcon.2014.07.011.
Zhou, L., S. Perera, C. Udeaja, and C. Paul. 2012. “Readiness of BIM: A case study of a quantity surveying organisation.” In Proc., 1st UK Academic Conf. on Bim: Conf., 118–126. Newcastle upon Tyne, UK: Northumbria Univ.

Information & Authors

Information

Published In

Go to Journal of Architectural Engineering
Journal of Architectural Engineering
Volume 28Issue 3September 2022

History

Received: Sep 17, 2021
Accepted: May 23, 2022
Published online: Jul 15, 2022
Published in print: Sep 1, 2022
Discussion open until: Dec 15, 2022

Permissions

Request permissions for this article.

Authors

Affiliations

Researcher, Faculty of Civil Engineering Technology, Univ. Malaysia Pahang, 26300 Kuantan, Malaysia (corresponding author). ORCID: https://orcid.org/0000-0002-2885-8880. Email: [email protected]
Senior Lecturer, Faculty of Civil Engineering Technology, Univ. Malaysia Pahang, 26300 Kuantan, Malaysia. ORCID: https://orcid.org/0000-0002-8042-0392. Email: [email protected]
Shu Ing Doh, Ph.D. [email protected]
Senior Lecturer, Dept. of Civil Engineering, College of Engineering, Univ. Malaysia Pahang, 26300 Kuantan, Malaysia. Email: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share