TECHNICAL PAPERS
May 1, 2009

Integrated Multiple-Element Bridge Management System

Publication: Journal of Bridge Engineering
Volume 14, Issue 3

Abstract

This paper presents the development of a comprehensive bridge management system that optimizes repair decisions considering multiple bridge elements and large networks of bridges. The strength of the system stems from its integration of project-level decisions of the best repair strategies to use on the elements of each bridge, and network-level decisions of the most beneficial repair year for each bridge. These decisions, however, represent complex optimization problems that traditional optimization techniques are often unable to solve. To handle such a large problem, the proposed system uniquely segments the problem into smaller sequential optimizations that are solved using the genetic algorithms technique. The system uses a year-by-year optimization formulation to maximize the benefit/cost ratio of the repairs, and to maximize the overall network condition. The paper provides a description of the multiple-element system, its life-cycle formulation, and its related models for deterioration analysis and repair cost estimation. System implementation and an example application are then presented to demonstrate the practicality of the system and its performance on different sizes of bridge networks.

Get full access to this article

View all available purchase options and get full access to this article.

References

Elbehairy, H. (2007). “Bridge management system with integrated life cycle cost optimization.” Ph.D. thesis, Univ. of Waterloo, Waterloo ON, Canada.
Elbehairy, H., Hegazy, T., Elbeltagi, E., and Souki, K. (2006). “Comparison of two evolutionary algorithms for LCC optimization of bridge deck repairs.” Comput. Aided Civ. Infrastruct. Eng., 21(8), 561–572.
Federal Highway Administration (FHwA). (2001). Pontis, Version 4.0 Technical Manual Report, U.S. Dept. of Transportation, Washington, D.C.
Furuta, H., Kameda, T., Nakahara, K., Takahashi, Y., and Frangopol, D. (2006). “Optimal bridge maintenance planning using improved multi-objective genetic algorithm.” Struct. Infrastruct. Eng., 2(1), 33–41.
Goldberg, D. (1989). Genetic algorithms in search, optimization, and machine learning, Addison-Wesley, New York.
Hastak, M., and Hong, S. (2007). “Evaluation and determination of optimal MR&R strategies in concrete bridge decks.” Autom. Constr., 16(2), 165–175.
Hegazy, T., Elbeltagi, E., and Elbehairy, H. (2004). “Bridge deck management system with integrated life cycle cost optimization.” Transportation Research Record. 1866, National Research Council, Washington, D.C., 44–50.
Holland, J. (1975). Adaptation in natural and artificial systems, The University of Michigan Press, Ann Arbor, Mich.
Jacobs, T. (1992). “Optimal long-term scheduling of bridge deck replacement and rehabilitation.” J. Transp. Eng., 118(2), 312–322.
Jiang, Y. (1990). “The development of performance prediction and optimization models for bridge management systems.” Ph.D. thesis, Purdue Univ., West Lafayette, Ind.
Lee, C., and Kim, S. (2007). “GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decks.” Autom. Constr., 16(2), 153–164.
Liu, C., Hammad, A., and Itoh, Y. (1997). “Maintenance strategy optimization of bridge decks using genetic algorithms.” J. Transp. Eng., 123(2), 91–100.
Liu, M., and Frangopol, D. M. (2006). “Optimizing bridge network maintenance management under uncertainty with conflicting criteria: Life-cycle maintenance, failure, and user costs.” J. Struct. Eng., 132(11), 1835–1845.
Minchin, R., Zayed, T., Boyd, A., and Mendoza, M. (2006). “Best practices of bridge system management—A synthesis.” J. Manage. Eng., 22(4), 186–195.
O’Connor, D. S., and Hayman, W. A. (1989). “Bridge management systems.” Rep. No. FHWA-DP-71-01R, U.S. Dept. of Transportation, Federal Highway Administration, Transportation Research Board, Washington, D.C.
National Cooperative Highway Research Program (NCHRP). (2004). “Multiple-objective optimization for bridge management systems.” Research Project Statement No. 12-67, Fiscal Year 2004, ⟨http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+12-67⟩.
“$66 billion for roads.” (2005). Toronto Star, February 16, A16.
Yanev, B., and Testa, R. B. (1999). “Life-cycle performance of bridge components in New York City.” 8th Transportation Research Board Conf. on Bridge Management, Transportation Research Board, Washington, D.C., C-/1–C-5/10.

Information & Authors

Information

Published In

Go to Journal of Bridge Engineering
Journal of Bridge Engineering
Volume 14Issue 3May 2009
Pages: 179 - 187

History

Received: Jun 19, 2007
Accepted: Jul 29, 2008
Published online: May 1, 2009
Published in print: May 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Hatem Elbehairy [email protected]
Assistant Professor, Civil Engineering Dept., Al-Azhar Univ., Cairo, Egypt. E-mail: [email protected]
Tarek Hegazy [email protected]
Professor, Civil Engineering Dept., Univ. of Waterloo, Waterloo ON, Canada N2L 3G1. E-mail: [email protected]
Khaled Soudki [email protected]
Professor, Civil Engineering Dept., Univ. of Waterloo, Waterloo ON, Canada N2L 3G1. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share