TECHNICAL PAPERS
Aug 1, 2007

Four-Day Workweek and the Construction Industry

Publication: Practice Periodical on Structural Design and Construction
Volume 12, Issue 3

Abstract

Like other industries, engineers, contractors, and construction/project managers in the construction industry are continuously searching for means, methods, and materials that will give them an edge to be more efficient in terms of cost and/or time. Some of these tools come in the form of a new piece of equipment or breakthrough product with multiple uses. It is people, though, that are the key resource of the construction industry. Thus, construction workers can also be looked to for gaining an advantage. This can be done by setting up projects so that the workers can make better use of their time while on the job. One such example is implementing the four day, 40h workweek in lieu of the traditional five 8h days. This paper will explore the merits of utilizing such a system in the construction industry, outline some of its impacts on a project and the workers, present a multiattribute utility function for determining its effectiveness, and conclude with a recommendation on its use.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

This paper is partly based on the input and discussions of several coworkers and colleagues of the first writer within the construction industry, namely Al Vazquez (SpawGlass Contractors), Cary Hairston (SpawGlass Contractors), Jack Mulligan (SpawGlass Contractors), John Martin (Cappadonna Electric), Wayne Barnes (CBW Industries), Carlos Moreno (Marmon-Mok Architects), and Ted Dunham (Engineering Safety Consultants). Their support is greatly appreciated.

References

Adrian, J. (1987). “Improving construction productivity.” Productivity Newsletter, 12(6), 96–98.
Avery, C. (2001). The flexible workplace, Quorum Books, Westport, Conn.
Brunies, R., and Emir, Z. (2001). “Calculating loss of productivity due to overtime using published charts—Fact or fiction.” The Revay Rep., 20 (3), Revay and Associates Limited, http:/www.revay.com/ .
Maklan, D. M. (1977). The four-day workweek, Praeger, New York.
Rowley, L. (1998). “Productivity.” Cornerstone—The Newsletter for Members of the Washington State Conf. of Mason Contractors, August, Kirkland, Wash.
Thomas, H. R. (1992). “Effects of scheduled overtime on labor productivity.” J. Constr. Eng. Manage., 118(1), 60–76.
Washington State University Cooperative Extension Energy Program and Commuter Challenge (WSUCEEPCC). (1999a). “Case Study: ARCO Products Company. Flexible work schedules. Compressed workweek.” ⟨http://www.commuterchallenge.org/cc/csarco.html⟩ (Mar. 10, 2004).
WSUCEEPCC. (1999b). “Case study: Matsushita Kotobuki. Flexible work schedules. Compressed workweek.” ⟨http://www.commuterchallenge.org/cc/csmatsushita.html⟩ (Mar. 10, 2004).
WSUCEEPCC. (1999c). “Case study: PRECOR. Flexible work schedules. Compressed workweek.” ⟨http://www.commuterchallenge.org/cc/csprecor.html⟩ (Mar.10, 2004).
WSUCEEPCC. (1999d) “Case study: Seattle Housing Authority (SHA) case study. Compressed workweeks/flextime.” ⟨http://www.commuterchallenge.org/cc/cs_sha.html⟩ (Jul. 20, 2005).
WSUCEEPCC. (1999e). “Case study: Washington State Department of Transportation (WSDOT). Flexible work schedules. Compressed workweek.” ⟨http://www.commuterchallenge.org/cc/csdot.html⟩ (Mar. 10, 2004).

Information & Authors

Information

Published In

Go to Practice Periodical on Structural Design and Construction
Practice Periodical on Structural Design and Construction
Volume 12Issue 3August 2007
Pages: 140 - 145

History

Received: Sep 13, 2004
Accepted: Aug 1, 2006
Published online: Aug 1, 2007
Published in print: Aug 2007

Permissions

Request permissions for this article.

Authors

Affiliations

Jason Smith
Manager, SpawGlass Contractors, San Antonio, TX 78154.
Manuel A. Diaz, M.ASCE
Associate Professor, Univ. of Texas at San Antonio, San Antonio, TX 78249.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share