Stochastic Duration Modeling of Pavement Overlay Crack Initiation
Publication: Journal of Infrastructure Systems
Volume 14, Issue 3
Abstract
In this paper we present the development of an empirical pavement overlay crack initiation model using condition survey data for the highway system in the state of Washington. We use a semiparametric Cox model and show that its hazard function represents the sample hazard function, which follows a bathtub shape. This is a shape that commonly used parametric models cannot predict. Empirical data complications, such as the endogeneity of overlay design variables and data censoring, are corrected for using appropriate econometric techniques. Our research shows that a specification that captures the main factors responsible for the overlay crack initiation process, combined with careful analysis of the data, can produce models of sufficient realism for maintenance and rehabilitation action selection purposes.
Get full access to this article
View all available purchase options and get full access to this article.
Acknowledgments
The California Department of Transportation Division of Research and Innovation funded this work, through a contract with the Partnered Pavement Research Center at the University of California at Berkeley. The writers are grateful for the assistance provided by Dr. John Harvey of University of California Davis in obtaining the data used in this research. The views and opinions presented in this paper are solely those of the writers.
References
California Department of Transportation. (2003). “California state of the pavement report 2003.” http://www.dot.ca.gov/hq/maint/StateOfPavement2003.pdf .
Crowder, M. J., Kimber, A. C., Smith, R. L., and Sweeting, T. J. (1991). Statistical analysis of reliability data, Chapman and Hall, London.
Empresa Brasileira de Planejamento de Transportes (GEIPOT). (1982). “Research on the interrelationships between costs of highway construction, maintenance and utilization (PCIR).” Final Rep. Vol 12, Ministry of Transport, Brasilia, Brazil.
Golabi, K., and Shepard, R. (1997). “A system for maintenance optimization and improvement of U.S. bridge networks.” Interfaces, 27(1), 71–88.
Greene, W. H. (1997). Econometric analysis, 3rd Ed., Prentice-Hall, Upper Saddle River, N.J.
Highway Research Board (HRB). (1962). “The AASHO road test—Report 5—Pavement research.” Special Rep. No. 61E, Publication No. 954, National Research Council, Washington, D.C.
Hodges, J. W., Rolt, J., and Jones, T. E. (1975). “The Kenya Road transport cost study: Research on road deterioration.” Laboratory Rep. No. 673, Transport and Road Research Laboratory, Crowthorne, U.K.
Kalbfleisch, J. D., and Prentice, R. L. (2002). The statistical analysis of failure time data, Wiley, New York.
Leemis, L. M. (1995). Reliability, probabilistic models and statistical methods, Prentice-Hall, Englewood Cliffs, N.J.
Madanat, S., Bulusu, S., and Mahmoud, A. (1995). “Estimation of infrastructure distress initiation and progression models.” J. Infrastruct. Syst., 1(3), 146–150.
Madanat, S., and Mishalani, R. (1998). “Selectivity bias in modeling highway pavement maintenance effectiveness.” J. Infrastruct. Syst., 4(3), 134–137.
Meeker, W. Q., and Escobar, L. A. (1998). Statistical methods for reliability data, Wiley, New York.
Northwest Pavement Management Systems Users Group, and Keith Kay, R. (1992). Pavement surface condition rating manuel, Washington State Department of Transportation, Wash.
Organization for Economic Cooperation and Development (OECD). (1987). “Pavement management systems.” Road Transport Research Rep., Paris.
Parsley, L., and Robinson, R. (1982). “The TRRL road investment model for developing countries (RTIM2).” Laboratory Rep. No. 1057, Transport and Road Research Laboratory, Crowthorne, U.K.
Paterson, W. D. O. (1987). Road deterioration and maintenance effects: Models for planning and management, Hwy. Des. and Maintenance Standard Ser., Johns Hopkins University Press, Baltimore.
Prozzi, J., and Madanat, S. (2000). “Analysis of experimental pavement failure data using stochastic duration models.” Transportation Research Record. 1699, Transportation Research Board, Washington, D.C.
Prozzi, J., and Madanat, S. (2004). “Development of pavement performance models by combining experimental and field data.” J. Infrastruct. Syst., 10(1), 9–22.
Queiroz, C. A. V. (1981). “Performance prediction models for pavement management in Brazil.” Ph.D. dissertation, Univ. of Texas, Austin, Tex.
Shin, H. C., and Madanat, S. (2003). “Development of a stochastic model of infrastructure distress initiation.” Journal of Infrastructure Planning and Management, 744(61), 61–67.
Small, K. A., and Winston, C. (1988). “Optimal highway durability.” Academic Economic Review, 78(3), 560–569.
Washington State Department of Transportation Materials Lab. (1999). Washington state pavement management system (WSPMS) pavement management software guide, Wash.
Information & Authors
Information
Published In
Copyright
© 2008 ASCE.
History
Received: Feb 28, 2006
Accepted: Jun 8, 2007
Published online: Sep 1, 2008
Published in print: Sep 2008
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.