Development of Prototype Highway Asset Management System
Publication: Journal of Infrastructure Systems
Volume 5, Issue 2
Abstract
A prototype methodology for integrating highway infrastructure management activities has been developed. This paper describes the analytical procedures and data integration and presentation methods as well as the geographic information system- (GIS-) based software system that ties together and implements the data and management procedures. Together these elements comprise the new methodology. There are four major areas of integration considered in the methodology: (1) Integrated computerized system; (2) network-level integration; (3) project-level integration; and (4) multiple performance measures. The network-level integration involves performing trade-off analysis to select candidate projects from various highway infrastructure components. The project-level integration includes identifying adjacent improvement projects from various infrastructure components that can be implemented simultaneously to reduce traffic disruptions. The project-level integration is performed in a spatial manner using GIS capabilities. The integrated system approach developed in this study for the management of highway assets was applied to five infrastructure components (pavements, bridges, culverts, intersections, and signs) of the state highway system in Champaign County in central Illinois. The sample highway application showed that coordinating project implementation is beneficial for highway agencies and users. It reduces disruption to normal traffic flow caused by rehabilitation and reconstruction activities in a 5-year program by 20%.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Basu, A., and Batra, R. ( 1984). “Adsplit: An advertising budget allocation model.” BEBR, Facu. Working Paper No. 1019, Coll. of Commerce and Business Admin., University of Illinois at Urbana-Champaign, Urbana, Ill., 1–25.
2.
Gharaibeh, N. G. ( 1997). “Improving highway infrastructure management practices using GIS and optimization techniques,” PhD thesis, University of Illinois at Urbana-Champaign, Urbana, Ill.
3.
Gharaibeh, N. G., Hicks, J. E., and Hall, J. P. ( 1997). “Analysis of accidents, traffic, and pavement data.” Proc., Traffic Congestion and Traffic Safety in the 21st Century, R. F. Benekohal, ed., ASCE, Reston, Va., 396–403.
4.
Grigg, N. S. ( 1988). Infrastructure engineering and management. Wiley, New York.
5.
Harper, W., and Majidzadeh, K. ( 1993). “Integrated pavement and bridge management optimization.” Transp. Res. Rec. 1397, Transportation Research Board, Washington, D.C., 83–89.
6.
Lee, H., and Deighton, R. (1995). “Developing infrastructure management systems for small public agency.”J. Infrastruct. Sys., ASCE, 1(4), 230–235.
7.
Männistö, V., and Tapio, R. ( 1994). “Infrastructure management system: Case study of the Finnish National Road Administration.” Transp. Res. Rec. 1455, Transportation Research Board, Washington, D.C., 132–138.
8.
Measuring the effectiveness of basic municipal services. (1974). Urban Institute and International City Management Association.
9.
Mohseni, A., Darter, M., and Hall, J. ( 1992). “Alternative methods for pavement network rehabilitation management.” Rep. No. FHWA-IL-UI-236, Proj. IHR-529, Illinois Cooperative Hwy. Res. Program, University of Illinois, Ill.
10.
Person, R. A., and O'Day, K. D. ( 1986). “A computerized infrastructure management program.” Public Works, February, 65–68.
11.
Ravirala, V., and Grivas, D. (1995). “Goal-programming methodology for integrated pavement and bridge programs.”J. Transp. Engrg., ASCE, 121(4), 345–351.
12.
Shahin, M. Y., Kohn, S. D., Lytton, R. L., and McFarland, W. F. ( 1985). “Pavement M&R budget optimization using the incremental benefit-cost technique.” Proc., North Am. Pavement Mgmt. Conf., 3, 6.96–6.107.
13.
Sinha, K. C., and Fwa, T. F. ( 1989). “On the total highway management.” Transp. Res. Rec. 1229, Transportation Research Board, Washington, D.C., 79–88.
14.
Stephense, L. B. ( 1987). “The integration of a city's PMS with other street management systems.” Proc., 2nd North Am. Conf. on Managing Pavements, 1.237–1.247.
15.
Understanding GIS, the ARC/INFO method. (1994). Environmental System Research Institute, Inc., Redlands, Calif.
16.
Wang, L. ( 1995). “Development, evaluation, and improvement of a long-range pavement rehabilitation program,” PhD thesis, University of Illinois at Urbana-Champaign, Urbana, Ill.
17.
Zhang, Z., Dossey, T., Weissmann, J., and Hudson, W. ( 1994). “GIS integrated pavement and infrastructure management in urban areas.” Transp. Res. Rec. 1429, Transportation Research Board, Washington, D.C., 84–89.
Information & Authors
Information
Published In
History
Published online: Jun 1, 1999
Published in print: Jun 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.