LEGAL AFFAIRS SECTION
Jun 15, 2004

Trends in Construction Lost Productivity Claims

Publication: Journal of Professional Issues in Engineering Education and Practice
Volume 130, Issue 3

Abstract

Resources are the cornerstone of all construction performance. An important measure of those resources is their productivity, which can be affected by many factors. Where productivity is reduced due to circumstances beyond the contractor’s control, a claim for loss of productivity often results. Although similar to other types of claims, loss of productivity claims pose unique challenges for the contractor who asserts them and the owner who defends against them. This paper discusses construction productivity, especially labor productivity, including its measurement, the methodologies for asserting and defending against loss of productivity claims, and recent judicial decisions addressing these claims.

Get full access to this article

View all available purchase options and get full access to this article.

Bibliography

Allmon, E., Haas, C. T., Borcherding, J. D., and Goodrum, P. M.(2000). “U.S. construction labor productivity trends, 1970–1998.” J. Constr. Eng. Manage., 126(2), 97–104.
Business Roundtable. (1980). “Scheduled overtime effect on construction projects.” Rep. No. C-2, Business Roundtable, New York.
Business Roundtable. (1982). “Absenteeism and turnover,” Rep. No. C-6, Business Roundtable, New York.
Cass, D. J. (1992). “Labor productivity impact of varying crew levels,” 1992 AACE Transactions, Orlando, Fla., C2.1–2.9.
Clark, F. D., and Lorenzoni, A. B. (1978). “Labor productivity.” Chapter 5, Applied cost engineering, Marcel Dekker, New York, 61–73.
Construction Industry Institute. (1988). “The effects of scheduled overtime and shift schedule on construction craft productivity.” Rep. to Construction Industry Institute under the Guidance of Task Force 83-2 Productivity Measurements and the Overtime and Shiftwork Subcommittee, CII, Univ. of Texas, Austin, Austin, Tex.
Dieterle, R., and DeStephanis, A. (1992). “Use of productivity factors in construction claims.” 1992 AACE Transactions, Orlando, Fla., C1.1–1.7.
Hackney, J. W., “Labor productivity and labor productivity analysis.” Chapters 12–13, Control and management of capital projects, 2nd Ed., Kenneth K. Humphreys, ed., McGraw-Hill, New York, 87–109.
Ibbs, C. W.(1997). “Quantitative impacts of project change: Size issues.” J. Constr. Eng. Manage., 123(3), 308–311.
Koehn, E., and Brown, G.(1985). “Climatic effects on construction.” J. Constr. Eng. Manage., 111(2), 129–137.
Mechanical Contractors Association of America (MCAA). (1994). “Factors affecting labor productivity.” Labor estimating manual. Bulletin No. PD2, Rockville, Md. 1–3.
Ponce de Leon, G., McManus, T., Klanac, G., and Knoke, J. (1997). “Avoiding claims.” Chapter 24, The engineer’s cost handbook—Tools for managing project costs, Richard E. Westney, ed., Marcel Dekker, New York. 709–738.
Smith, Currie & Hancock LLP. (2001). Common sense construction, 2nd Ed., Wiley, New York.
Thomas, H. R. (1988). Manual of construction productivity measurement and performance evaluation, Source document 35, Construction Industry Institute, Austin, Tex.
Thomas, H. R.(1992). “Effects of scheduled overtime on labor productivity.” J. Constr. Eng. Manage., 118(1), 60–76.
Thomas, H. R., and Napolitan, C. L. (1994). The effects of changes on labor productivity: Why and how much, Source document 99, Construction Industry Institute, Austin, Tex.
Thomas, H. R., and Raynar, K. A.(1997). “Scheduled overtime and labor productivity: A quantitative analysis.” J. Constr. Eng. Manage., 123(2), 181–188.
Thomas, H. R., and Yiakoumis, I.(1987). “Factor model of construction productivity.” J. Constr. Eng. Manage., 113(4), 623–639.
Zink, D. A.(1986). “The measured mile: Proving construction inefficiency costs.” Cost Eng., 28(4), 19–21.

Information & Authors

Information

Published In

Go to Journal of Professional Issues in Engineering Education and Practice
Journal of Professional Issues in Engineering Education and Practice
Volume 130Issue 3July 2004
Pages: 226 - 236

History

Received: Jun 20, 2003
Accepted: Feb 24, 2004
Published online: Jun 15, 2004
Published in print: Jul 2004

Permissions

Request permissions for this article.

Authors

Affiliations

Gerald P. Klanac
Senior Principal, PMA Consultants LLC, Ann Arbor, MI 48104.
Eric L. Nelson
Partner, Construction Law Group, Smith, Currie & Hancock LLP, Atlanta, GA 30303.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share