TECHNICAL PAPERS
Jul 1, 1991

Developing and Implementing C‐SCSC

Publication: Journal of Professional Issues in Engineering Education and Practice
Volume 117, Issue 3

Abstract

This paper looks at the essentials beyond mere knowledge of C‐SCSC formulas, to the successful implementation of C‐SCSC (cost‐schedule control systems criteria). The paper dwells on the management issues prevalent, and the managerial requisites for the implementation of C‐SCSC. To be able to successfully use the variance and index analyses of C‐SCSC, an immense, concerted project effort is needed. Although the arithmetical formulas used in C‐SCSC and forecasting are few and easy to understand, the management principles involved are deeper, demanding modified management attitudes. Systems planning and systems integration are emphasized as potent tools for the successful development, implementation, and use of C‐SCSC. Properly organizing, directing, and controlling C‐SCSC system development are dwelt upon in detail. Various human‐management concerns and state‐of‐the‐art drawbacks in construction management philosophy are highlighted. People problems during the implementation process frequently center around professional caliber, professional ethics, and professional and not‐so‐professional interests. Negative forces are associated with both the agent of change and its recipient. The paper examines the U.S. departments of Defense and Energy's use of C‐SCSC during the last decade and a half. It gives construction companies the means to achieve successful, state‐of‐the‐art construction management practices in the area of cost control.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ashley, D. (1987). “Foreword.” Project control: Needs and solutions, W. Ibbs and D. Ashley, eds., ASCE, New York, N.Y.
2.
“Contract cost performance, funds status and cost/schedule status reports.” (1979). DODI 7000.10, Department of Defense, Washington, D.C.
3.
“Cost and schedule control systems criteria for contract performance measurement: Summary description.” (1979). DOE/CR/0014, Department of Energy, Washington, D.C.
4.
“Cost and schedule control system criteria for contract performance measurement.” (1986). DE86012460, Department of Energy, Washington, D.C.
5.
Fleming, Q. (1983). “Put earned value (C‐SCSC) into your management control system.” Publishing Horizons, Inc., Momence, Il.
6.
Hellreigal, D., and Slocum, J. W., Jr. (1986). Management. Fourth Ed., Addison‐Wesley, Reading, Mass.
7.
Kahn, R., Wolfe, D., Quinn, R., and Snoek, J. (1964). Organizational stress: Studies in role conflict and ambiguity. John Wiley & Sons, New York, N.Y.
8.
Kahn, R., and Wolfe, D. (1964). “Role conflict in organizations.” Power and conflict in organizations, R. Kahn and E. Boulding, eds., Basic Books, New York, N.Y.
9.
Kemps, R. (1983). “The cost and schedule control systems criteria for contract performance measurement.” Nat. Conf. on Cost‐Schedule Control Systems, NIMR Seminars, Santa Monica, Calif.
10.
Kuhfittig, P. K. F., and Davis, T. W. (1990). “Predicting the unpredictable.” Cost Engrg., AACE, 32(2), 7–11.
11.
“Model planning and controlling system for EPC of industrial projects.” (1987). Construction Industry Institute, Publication 6‐3, Apr.
12.
Singh, A. (1990). “Discussion paper on implementing successful cost control in a large construction contracting company.” Technical Report, The Foundation Company of Canada, Ltd., Scarborough, Ontario, Canada.
13.
Singh, A. (1991). “Knowledge bases for C/SCSC.” Cost Engrg., AACE, 33(6), Jun.
14.
Slemaker, C. (1985). The principles and practice of cost‐schedule control systems. Petrocelli Books, Princeton, N.J.
15.
Twitchell, P. (1981). The Shariyat‐Ki‐Sugmad. Book Two, IWP Publishing, Menlo Park, Calif.
16.
“Work breakdown structure guide.” (1987). DE87‐007606, Department of Energy, Washington, D.C.

Information & Authors

Information

Published In

Go to Journal of Professional Issues in Engineering Education and Practice
Journal of Professional Issues in Engineering Education and Practice
Volume 117Issue 3July 1991
Pages: 295 - 308

History

Published online: Jul 1, 1991
Published in print: Jul 1991

Permissions

Request permissions for this article.

Authors

Affiliations

Amarjit Singh, Member, ASCE
Dir., CEMCARG (The Construction Engineering and Management Consulting and Research Group), 580 Eyer Drive, No. 111, Pickering, Ontario, L1W 3B7, Canada

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share