TECHNICAL PAPERS
Feb 1, 1999

Project Success Index for Capital Facility Construction Projects

Publication: Journal of Performance of Constructed Facilities
Volume 13, Issue 1

Abstract

Project management researchers have often measured the effect that specific inputs have on project success. However, the concept of project success is complicated and there is no consensus as to how it should be measured. The research community and project management practitioners need a simple and direct measurement for project success that is based on objective measurements and can be used on projects of different types and sizes. This paper discusses a research project that utilized the data collected from completed projects and telephone interviews to develop an index designed to measure the success of industrial project execution. This index is comprised of four variables: budget achievement, schedule achievement, design capacity, and plant utilization. This success index has been validated using three separate research projects with different data sets and data collection methodologies. Despite the complexities involved in measuring project success, a measurement can be developed that is based on objective project performance and this measurement can be successfully used to compare projects of different types and sizes in order to improve the quality of the constructed facility.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Ashley, D., Jaselskis, E., and Lurie, C. B. ( 1987). “The determinants of construction project success.” Proj. Mgmt. J., 18(2), 69–79.
2.
Babbie, E. R. ( 1973). Survey research methods. Wadsworth Publishing, Belmont, Calif.
3.
Bohrnstedt, G. W., and Knoke, D. ( 1988). Statistics for social data analysis, 2nd Ed., F.E. Peacock Publishers, Itasca, Ill.
4.
Construction Industry Institute (CII). ( 1995). “Pre-project planning handbook.” Spec. Publ. 39-2, Construction Industry Institute, University of Texas at Austin, Tex.
5.
Construction Industry Institute (CII). ( 1996). “PDRI: Project definition rating index, industrial projects.” Implementation Resour. 113-2, Construction Industry Institute, University of Texas at Austin, Tex.
6.
de Wit, A. ( 1986). “Measuring project success: An illusion.” 1986 Proc., Proj. Mgmt. Inst.: Montreal, Canada, Project Management Institute, Drexel Hill, Pa., 13–21.
7.
Dumont, P., Gibson, G. E., and Fish, J. (1997). “Scope management using the project definition rating index (PDRI).”J. Mgmt. Engrg., ASCE, 13(5), 54–60.
8.
Fergusson, K. J. ( 1993). Impact of integration on industrial facility quality. PhD dissertation, Stanford University, Palo Alto, Calif.
9.
Freeman, M., and Beale, P. ( 1992). “Measuring project success.” Proj. Mgmt. J., 23(1), 8–16.
10.
Gibson, G. E., and Dumont, P. A. ( 1996). “Project definition rating index for industrial projects.” Res. Rep. 113–11, Construction Industry Institute, University of Texas at Austin, Tex.
11.
Gibson, G. E., and Hamilton, M. R. ( 1994). “Analysis of pre-project planning effort and success variables for capital facility projects.” Source Document 105, Construction Industry Institute, University of Texas at Austin, Tex.
12.
Gibson, G. E., Kaczmarowski, J. H., and Lore, H. E. ( 1993). “Modeling pre-project planning for the construction of capital facilities,” Source Document 94, Construction Industry Institute, University of Texas at Austin, Tex.
13.
Gibson, G. E., Kaczmarowski, J. H., and Lore, H. E. (1995). “Preproject-planning process for capital facilities.”J. Constr. Engrg. and Mgmt., ASCE, (121)3, 312–318.
14.
Gibson, G. E., Tortora, A. L., and Wilson, C. T. ( 1994). “Perceptions of project representatives concerning project success and pre-project planning effort.” Source Document 102, Construction Industry Institute, University of Texas at Austin, Tex.
15.
Griffith, A. F., and Gibson, G. E. ( 1997). “Team alignment during pre-project planning of capital facilities.” Res. Rep. 113-12, Construction Industry Institute, University of Texas at Austin, Tex.
16.
Hamilton, M. R., and Gibson, G. E. (1996). “Benchmarking preproject planning effort.”J. Mgmt. Engrg., ASCE, 12(2), 25–33.
17.
Jolivet, F., and Batignolles, S. ( 1986). “The possibility of anticipating several years in advance the success or failure of a project.” 1986 Proc., Proj. Mgmt. Inst.: Montreal, Canada, Project Management Institute, Drexel Hill, Pa., 35–39.
18.
Kothari, A. K. ( 1986). “Success in project management.” 1986 Proc., Proj. Mgmt. Inst.: Montreal, Canada, Project Management Institute, Drexel Hill, Pa., 240–246.
19.
Morris, P. W., and Hough, G. H. ( 1987). Anatomy of major projects. Wiley, New York.
20.
Pinto, J. K., and Kharabanda, O. P. ( 1996). What made Gertie gallop? Van Nostrand Reinhold, New York.
21.
Pinto, J. K., and Slevin, D. P. ( 1992). Project implementation profile. Xicom, Tuxedo, New York.
22.
Tan, R. R. ( 1996). “Success criteria and success factors for external technology transfer projects.” Proj. Mgmt. J., 27(2), 45–56.
23.
Tuman, J. ( 1986). “Success modeling: A technique for building a winning project team.” 1986 Proc., Proj. Mgmt. Inst.: Montreal, Canada, Project Management Institute, Drexel Hill, Pa., 94–108.

Information & Authors

Information

Published In

Go to Journal of Performance of Constructed Facilities
Journal of Performance of Constructed Facilities
Volume 13Issue 1February 1999
Pages: 39 - 45

History

Received: Jan 22, 1998
Published online: Feb 1, 1999
Published in print: Feb 1999

Permissions

Request permissions for this article.

Authors

Affiliations

Members ASCE
Sr. Analyst, Independent Proj. Anal., Inc., 11150 Sunset Hills Rd., Suite 300, Reston, VA 22090.
Assoc. Prof., Dept. of Civ. Engrg., Univ. of Texas, Austin, TX 78712-1076.
Proj. Engr., Coakley and Williams Constr. Co., Inc., Fort Sam Houston, TX 78234.
Brigade Operations Ofcr., Engr. Brigade, 4th Infantry Div., Fort Hood, TX 76544.
Proj. Mgr., C.T. Wilson Constr. Co., Inc., Durham, NC 27705.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share