Construction Errors: Bridge Pier Case Studies
Publication: Journal of Performance of Constructed Facilities
Volume 4, Issue 2
Abstract
Three case studies of bridge‐pier‐related problems are presented. The first two concern problems during the construction of new bridge piers, while the third examines the reconstruction of an existing bridge. The first case is associated with an error in a construction drawing, the second involves inadequate pier survey, and the third is related to poor judgment in the inspection of the bridge‐pier base. The enabling causes of these problems were poor planning and supervision prior to and during construction stages. As design and construction of bridges becomes more and more complex, component details can be easily overlooked without adequate planning and supervision. Despite their significance for pier performance, such problems are generally unreported, and even if they are investigated, the results are seldom publicized. These problems, which cause project cost overruns and delays, can be avoided by emphasizing stricter quality‐control measures.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Hadipriono, F. C. (1985). “Analysis of events in recent structural failures.” J. Struct. Engrg., 111(7), 1468–1481.
2.
Hadipriono, F. C., and Wang, H. K. (1986). “Analysis of cause of falsework failures in concrete structures.” J. Constr. Engrg. and Mgmt., 112(1), 112–121.
Information & Authors
Information
Published In
Copyright
Copyright © 1990 ASCE.
History
Published online: May 1, 1990
Published in print: May 1990
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.