TECHNICAL PAPERS
May 1, 1997

Event Tree Analysis of Lock Closure Risks

Publication: Journal of Water Resources Planning and Management
Volume 123, Issue 3

Abstract

The use of event trees and subjective probabilities in risk analysis is illustrated via a case study: the estimation of the probability of closure of Poe Lock on St. Marys River (Sault Ste. Marie, Mich.) because of vessel accidents and other nonstructural failures. The risk of closure is needed to determine the benefits of building a second Poe-class lock at that location. An event tree structures the risk analysis. Probabilities associated with the branches of the tree were developed from a combination of historical data and subjective probabilities. The latter were obtained in workshops with navigation experts. This paper summarizes the risk analysis, and discusses the difficulties associated with obtaining the necessary probabilities. It was found that a 30-day closure could occur about once every 50 years. The results are most sensitive to assumptions concerning how often ships hit lock gates.

Get full access to this article

View all available purchase options and get full access to this article.

References

1.
Argiroff, C. (1985). “An analysis of the West Center Pier at the Soo Locks, Sault Ste. Marie, Michigan.”Rep., U.S. Army Corps of Engrs. (USACE), Washington, D.C.
2.
Beim, G. K., and Hobbs, B. F. (1994). “Poe Lock system risk analysis.”Rep. Prepared for U.S. Army Corps of Engrs. (USACE), Inst. for Water Resour., Elyria, Ohio.
3.
Büyükkurt, B., and Büyükkurt, M.(1991). “An experimental study of the effectiveness of three debiasing techniques.”Decision Sci., 22, 60–73.
4.
Cooke, R. (1991). Experts in uncertainty—opinion and subjective probability in science. Oxford University Press, New York, N.Y.
5.
Delbecq, A., Van de Ven, A., and Gustafson, D. (1975). Group techniques for program planning—a guide to nominal group and delphi processes. Scott Foresman and Co., Glenview, Ill.
6.
Fischhoff, B., Slovic, P., and Lichtenstein, S.(1978). “Fault trees: sensitivity of estimated failure probabilities to problem representation.”J. Experimental Psychology: Human Perception and Perf., 4(2), 330–344.
7.
Haimes, Y. Y., Barry, T., and Lambert, J. (eds.)(1994). “When and how can you specify a probability distribution when you don't know much?”Risk Anal., 14(5), 661–706.
8.
Henley, E., and Kumamoto, J. (1991). Probabilistic risk assessment. IEEE Press, New York, N.Y.
9.
Modarres, M. (1993). What every engineer should know about reliability and risk analysis. Marcel Dekker, Inc., New York, N.Y.
10.
Morgan, M. G., and Henrion, M. (1990). Uncertainty. Cambridge University Press, New York, N.Y.
11.
Morris, P. A.(1977). “Combining expert judgments: a Bayesian approach.”Mgmt. Sci., 23(6), 679–693.
12.
Otway, H., and von Winterfeldt, D.(1992). “Expert judgment in risk analysis and management: process, context, and pitfalls.”Risk Anal., 12(1), 83–93.
13.
Salmon, G., Cattanach, D., and Hartford, D.(1997). “Risk management at Wahleach Dam.”Civ. Engrg., ASCE, 67(2), 39–41.
14.
Schulze, R. H., Wohl, G., and Wallendorf, L. (1982). “Probability of hazardous substance spills on St. Mary's River.”Rep. No. 795C, Prepared for Dept. of Army Corps of Engrs. Envir. Anal. Branch, Arctec, Inc.
15.
Selvidge, J. (1975). “A three step procedure for assigning probabilities to rare events.”Utility, Probability and Human Decision Making, D. Wendt and C. Vlek, eds., Reidel, Dordrecht, The Netherlands, 199–216.
16.
Spetzler, C. S., and Staël von Holstein, C.(1975). “Probability encoding in decision analysis.”Mgmt. Sci., 22(11), 340–358.
17.
Tversky, A., and Kahneman, D.(1974). “Judgment under uncertainty: heuristics and biases.”Sci., 185(9), 1124–1131.
18.
U.S. Army Corps of Engineers (USACE). (1986). “Great Lakes connecting channels and harbors.”Final Interim Feasibility Rep. and Envir. Impact Statement, R-3/86, Detroit, Mich.
19.
U.S. Army Corps of Engineers (USACE). (1994). “Structural reliability review.”Rep., Poe Lock, St. Mary's River Canal, Sault Ste. Marie, Michigan, Detroit, Mich.
20.
U.S. Nuclear Regulatory Commission. (1975). “Reactor safety study.”Rep. WASH-1400, Washington, D.C.
21.
Watson, S. R., and Buede, D. M. (1987). Decision synthesis: the principles and practice of decision analysis. Cambridge University Press, New York, N.Y.
22.
Winkler, R. L., Wallsten, T. S., Whitfield, R., Richmond, H. M., Hayes, S., and Rosenbaum, A. S.(1995). “An assessment of the risk of chronic lung injury attributable to long-term ozone exposure.”Operations Res., 43(1), 19–28.
23.
Wright, G., Rowe, G., Bolger, F., and Gammack, J.(1994). “Coherence, calibration, and expertise in judgmental probability forecasting.”Organizational behavior and human decision processes, 57(1), 1–25.

Information & Authors

Information

Published In

Go to Journal of Water Resources Planning and Management
Journal of Water Resources Planning and Management
Volume 123Issue 3May 1997
Pages: 169 - 178

History

Published online: May 1, 1997
Published in print: May 1997

Permissions

Request permissions for this article.

Authors

Affiliations

Gina K. Beim, Member, ASCE,
Plng. Engr., Northeast Ohio Regional Sewer Dist., 3826 Euclid Ave., Cleveland, OH 44115-2504; formerly, Proj. Engr., KS Associates, Inc., 424 Middle Ave., Elyria, OH 44035.
Benjamin F. Hobbs, Member, ASCE
Prof. of Geography and Envir. Engrg., The Johns Hopkins Univ., 313 Ames Hall, 3400 N. Charles St., Baltimore, MD 21218; formerly, Prof. of Sys. Engrg. and Civ. Engrg., Case Western Reserve Univ., 610 Crawford Hall, Cleveland, OH 44106.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share