CCGP Model for Multiobjective Reservoir Systems
Publication: Journal of Water Resources Planning and Management
Volume 115, Issue 5
Abstract
This paper presents an application of chance‐constrained goal programming methodology to a system of multipurpose reservoirs. Several objectives which may be conflicting and noncommensurate such as flood protection, municipal and industrial (M&I) water supply, hydroelectric power generation, recreation, etc. are considered in the model. The system goals and constraints are expressed either deterministically or probabilistically depending on whether the random variable term for inflow into a reservoir is present or not. For a constraint, the requirement must be strictly satisfied. For a goal, it is desired to achieve the solution which is as close as possible to the specified target. Stochastic inflows with one period correlation in successive periods are explicitly considered with conditional distribution functions based on normal and lognormal distributions of inflows provided. The application of the methodology to a three‐reservoir system in Oklahoma is reported. The proposed model uses a time period of a month and may be employed for planning rather than real‐time applications.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Bogle, M. G. V., and O'Sullivan, M. J. (1979). “Stochastic optimization of a water supply system.” Water Resour. Res., 15(4), 778–786.
2.
Bras, R. L., Buchanan, R., and Curry, K. C. (1983). “Real time adaptive closed loop control of reservoirs with the high Aswan Dam as a case study.” Water Resour. Res., 19, 33–52.
3.
Can, E. K., and Houck, M. H. (1984). “Real‐time reservoir operations by goal programming.” J. Water Resour. Plng. and Mgmt. Div., ASCE, 110(3), 297–309.
4.
Datta, B., and Burges, S. J. (1984). “Short‐term, single, multipurpose reservoir operation: importance of loss functions and forecast errors.” Water Resour. Res., 20(9), 1167–1176.
5.
Gries, N. P., Wood, E. F., and Steuer, R. E. (1983). “Multicriteria analysis of water allocation in a river basin: the Tchebycheff approach.” Water Resour. Res., 19(4), 865–875.
6.
Joeres, E. F., Liebman, J. C., and Revelle, C. S. (1971). “Operating rules for joint operation of raw water sources.” Water Resour. Res., 7(2), 225–235.
7.
Loucks, D. P., Stedinger, J. R., and Haith, D. A. (1981). Water Resource systems planning and analysis. Prentice‐Hall, Englewood Cliffs, N.J.
8.
Marino, M. A., and Mohammadi, B. (1983). “Reservoir management: a reliability programming approach.” Water Resour. Res., 19(3), 613–620.
9.
Murray, D., and Yakowitz, S. (1979). “Constrained differential dynamic programming and its application to multireservoir control.” Water Resour. Res., 15(4), 1017–1027.
10.
Nayak, C. S., and Arora, S. R. (1971). “Optimal capacities for a multi‐reservoir system using the linear decision rule.” Water Resour. Res., 7(3), 485–498.
11.
Ozden, M. (1984). “A binary state DP algorithm for operation problems of multireservoir systems.” Water Resour. Res., 20(1), 9–14.
12.
Palmer, R. N., et al. (1982). “Reservoir management in Potomac River basin.” J. Water Resour. Plng. and Mgmt. Div., ASCE, 108(1).
13.
Read, E. G., and Rosenthal, R. E. (1982). “Scheduling reservoir releases for optimal power generation: introduction and survey.” Paper presented in a special management course offered during the 1982 Energy Exposition and World's Fair, Knoxville, Tenn.
14.
Revelle, C. S., Joeres, S., and Kirby, W. (1969). “The linear decision rule in reservoir management and design: development of the stochastic model.” Water Resour. Res., 5(4), 767–777.
15.
Revelle, C. S., and Kirby, W. (1970). “Linear decision rule in reservoir management and design: performance optimization.” Water Resour. Res., 6(4), 1033–1044.
16.
Rosenthal, E. E. (1981). “A nonlinear network flow algorithm for maximization of benefits in a hydroelectric power system.” Operations Res., 29(4), 763–786.
17.
Simonovic, S. P., and Marino, M. A. (1980). “Reliability programming in reservoir management: single multipurpose reservoir.” Water Resour. Res., 16(5), 844–848.
18.
Simonovic, S. P., and Marino, M. A. (1982). “Reliability programming in reservoir management: system of multipurpose reservoirs.” Water Resour. Res., 18(4), 735–743.
19.
Stedinger, J. R., Sule, B. F., and Loucks, D. P. (1984). “Stochastic dynamic programming models for reservoir operation optimization.” Water Resour. Res., 20(11), 1499–1505.
20.
Tauxe, G. W., Inman, R. R., and Mades, D. M. (1979). “Multiobjective dynamic programming with application to a reservoir.” Water Resour. Res., 15(6), 1403–1408.
21.
Turgeon, A. (1981). “Optimum short‐term hydro scheduling from the principle of progressive optimality.” Water Resour. Res., 17(3), 481–486.
22.
U.S. Army Corps of Engineers, Southwestern Division (1970). Arkansas‐white‐red rivers system conservation studies. Vol. 1, Basic Data, Dallas, Tex.
23.
Yazicigil, H., Houck, M. H., and Toebes, G. H. (1983). “Daily operation of a Multipurpose Reservoir System,” Water Resour. Res., 19(1), 1–13.
24.
Yeh, W. W. G. (1985). “Reservoir management and operation models: a state of the art review.” Water Resour. Res., 21(12), 1797–1818.
25.
Yeh, W. W. G., and Becker, L. (1982). “Multiobjective analysis of multireservoir operations.” Water Resour. Res., 18(5), 1326.
Information & Authors
Information
Published In
Copyright
Copyright © 1989 ASCE.
History
Published online: Sep 1, 1989
Published in print: Sep 1989
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.