Optimal Sequencing of Development for Hydropower Stations in Cascade
Publication: Journal of Water Resources Planning and Management
Volume 115, Issue 3
Abstract
The sequencing problem for hydropower station development is a multidimensional problem involving space‐time decisions. In this paper, a mathematical model that uses a combination of dynamic programming and mixed‐integer programming is developed, and an efficient algorithm for its use in optimal sequencing problems is presented. The dynamic‐programming submodel (DPM) generates the alternative possible combinations of hydropower and thermal power stations (i.e., states) and analyzes the different sequences of hydropower station development. The mixed‐integer programming submodel (MIPM) simulates the operation of the power system and determines the minimum fuel‐cost operating policy. The MIPM requires an auxiliary flow regulation submodel (FRM). The combined use of the DPM, MIPM, and the FRM provides investment and operation decisions in one run. Therefore, the optimal development sequence of the hydropower stations and the timing of installation of power‐generating units in each station are obtained from the solution of the DPM‐MIPM‐FRM model. This model is applied to the preliminary planning of hydropower stations on the Wujiang River in the southwestern region of China, and the results are described.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Butcher, W. S., Haimes, Y. Y., and Hall, W. A. (1969). “Dynamic programming for the optimal sequencing of water supply projects,” Water Resour. Res., 5(6), 1196–1204.
2.
Kuiper, J., and Ortolano, L. (1973). “A dynamic programming‐simulation strategy for the capacity expansion of hydroelectric power systems.” Water Resour. Res., 9(6), 1497–1510.
3.
Morin, T. L., and Esogbue, A. M. O. (1971). “Some efficient dynamic programming algorithms for the optimal sequencing and scheduling of water supply projects.” Water Resour. Res., 7(3), 479–484.
4.
O'Laoghaire, D. T., and Himmelblau, D. M. (1972). “Modeling and sensitivity analysis for planning decisions in water resource.” Water Resour. Bull., 8(4), 653–668.
5.
Report on the Main Stream of the Wujiang River planning. (1987). The Office of the Yangtze River Basin Planning, and Guiyang Hydroelectric Investigation and Design Institute, Peoples Republic of China.
6.
Rohde, F. G., and Kalas, P. J. (1975), “Economic optimization and evaluation of hydroelectric power systems.” Water Power Dam Constr., 27(4), 145–151.
7.
Trott, W. J., and Yeh, W. W.‐G. (1973). “Optimization of multiple reservoir system.” J. Hydr. Div., ASCE, 99(10), 1965–1984.
Information & Authors
Information
Published In
Copyright
Copyright © 1989 ASCE.
History
Published online: May 1, 1989
Published in print: May 1989
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.