Capacity Expansion of Sao Paulo Water Supply
Publication: Journal of Water Resources Planning and Management
Volume 111, Issue 2
Abstract
A capacity expansion model has been developed to facilitate the planning and the optimal timing and sizing of the proposed Juquia River system in Sao Paulo, Brazil. The proposed system consists of the construction of a series of reservoirs and pumping stations in the Juquia River basin to develop firm water supplies to meet the projected future water demands for the city of Sao Paulo. A monthly simulation model that utilizes rational operation rules and simulates the optimal operation mode is imbedded in the capacity expansion model so that the optimized results are consistent and hydrologically feasible. Forty‐two years of historical streamflows are used in the simulation model. Future water demands up to a time horizon are specified, and a forward dynamic programming algorithm is used to minimize the present worth of total project costs.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Becker, L., and Yeh, W. W.‐G., “Optimal Timing, Sequencing and Sizing of Multiple Reservoir, Surface Water Supply Facilities,” Water Resources Research, Vol. 10, No. 1, Feb., 1974, pp. 57–62.
2.
Becker, L., and Yeh, W. W.‐G., “Timing and Sizing of Complex Water Resource Systems,” Paper of the Technical Council on Water Resources Planning and Management, Journal of the Hydraulics Division, ASCE, Vol. 100, No. HY10, Proc. Paper 10883, Oct., 1974, pp. 1457–1470.
3.
Bogle, M. G. V., and O'Sullivan, M. J., “Stochastic Optimization of Water Supply Expansion,” Water Resources Research, Vol. 15, No. 5, Oct., 1979, pp. 1229–1237.
4.
Butcher, W. S., Haimes, Y. Y., and Hall, W. A., “Dynamic Programming for the Optimal Sequencing of Water Supply Projects,” Water Resources Research. Vol. 5, No. 6, Dec., 1969, pp. 1196–1204.
5.
Erlenkotter, D., “Sequencing of Interdependent Hydroelectric Projects,” Water Resources Research, Vol. 9, No. 1, Feb., 1973, pp. 21–27.
6.
Erienkotter, D., “Sequencing Expansion Projects,” Operations Research, Vol. 21, No. 2, Mar.–Apr., 1973, pp. 542–553.
7.
Erienkotter, D., Comments on “Optimal Timing, Sequencing, and Sizing of Multiple Reservoir Surface Water Supply Facilities,” by L. Becker and W. W. G. Yeh, Water Resources Research, Vol. 11, No. 2, Apr., 1975, pp. 380–381.
8.
Erienkotter, D., “Coordinating Scale and Sequencing Decisions for Water Resources Projects,” Economic Modeling for Water Policy Evaluations, North‐Holland/TIMS Studies in the Management Science, Vol. 3, 1976, pp. 97–112.
9.
Jacobsen, S., “Heuristic Procedures for Dynamic Plant Locations,” The Institute of Mathematical Statistics and Operations Research, The Technical University of Denmark, DK‐2800, Lyngby, Denmark, Working Paper, Aug., 1977.
10.
Jacoby, H. D., and Loucks, D. P., “Combined Use of Optimization and Simulation Models in River Basin Planning,” Water Resources Research, Vol. 8, No. 6, Dec., 1972, pp. 1401–1414.
11.
Kolo, D. E., and Haimes, Y. Y., “Capacity Expansion and Operational Planning for Regional Water Resource Systems,” Journal of Hydrology, Vol. 32, 1977, pp. 363–381.
12.
Luss, H., “Operations Research and Capacity Expansion Problems: A Survey,” Bell Laboratories, Holmdel, N.J., Jan., 1981.
13.
Moore, N. Y., and Yeh, W. W.‐G., “Economic Model for Reservoir Planning,” Journal of the Water Resources Planning and Management Division, ASCE, Vol. 106, No. WR2, Proc. Paper 15520, July, 1980, pp. 383–400.
14.
Morin, T. L., “Optimal Sequencing of Capacity Expansion Projects,” Journal of the Hydraulics Division, ASCE, Vol. 99, No. HY9, Proc. Paper 9972, Sept., 1973, pp. 1605–1622.
15.
Morin, T. L., and Esogbue, A. M. O., “Some Efficient Dynamic Programming Algorithms for the Optimal Sequencing and Scheduling of Water Supply Projects,” Water Resources Research, Vol. 7, No. 3, June, 1971, pp. 479–484.
16.
O'Laoghaire, D. T., and Himmelblau, D. M., “Optimal Capital Investment in the Expansion of an Existing Water Resources Systems,” Water Resources Bulletin, Vol. 7, No. 6, Dec., 1971, pp. 1194–1209.
17.
O'Laoghaire, D. T., and Himmelblau, D. M., “Modeling and Sensitivity Analysis for Planning Decisions in Water Resources Expansion,” Water Resources Bulletin, Vol. 8, No. 4, Aug., 1972, pp. 653–668.
18.
O'Laoghaire, D. T., and Himmelblau, D. M., Optimal Expansion of a Water Resources System, Academic Press, New York, N.Y., 1974.
19.
Trott, W. J., and Yeh, W. W.‐G., “Optimization of Multiple Reservoir System,” Journal of the Hydraulics Division, ASCE, Vol. 99, No. HY10, Proc. Paper 10065, Oct., 1973, pp. 1865–1884.
20.
Tsou, C. A., Mitten, L. G., and Russel, S. O., “Search Technique for Project Sequencing,” Journal of the Hydraulics Division, ASCE, Vol. 99, No. HY5, May, 1973, pp. 833–839.
21.
Yeh, W. W.‐G., “Stage of the Art Review: Theories and Applications of Systems Analysis Techniques to the Optimal Management and Operation of a Reservoir System,” UCLA‐ENG‐82‐52, University of California, Los Angeles, Calif., June, 1982.
22.
Young, G. K., Moseley, J. C., and Evenson, D. E., “Time Sequencing of Element Construction in a Multi‐Reservoir System,” Water Resources Bulletin, Vol. 6, No. 4, 1970, pp. 528–541.
Information & Authors
Information
Published In
Copyright
Copyright © 1985 ASCE.
History
Published online: Apr 1, 1985
Published in print: Apr 1985
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.