TKUPAV: Stress Analysis and Thickness Design Program for Rigid Pavements
Publication: Journal of Transportation Engineering
Volume 125, Issue 4
Abstract
An alternative procedure for the determination of critical stresses and the thickness design of rigid pavements is presented. The effects of a finite slab size, different gear configurations, widened outer lane, tied concrete shoulder, second layer, and thermal curling are investigated. The well-known ILLI-SLAB finite-element program was used for the analysis. The program's applicability for stress estimation is further validated by reproducing very favorable results to the test sections of Taiwan's second northern highway, the AASHO road test, and the Arlington road test. Prediction models for stress adjustments are developed using a projection pursuit regression technique. A simplified stress analysis procedure is proposed and implemented in a user-friendly program (TKUPAV) to facilitate instant stress estimations at three critical locations of the slab; namely, the edge, corner, and interior. A modified Portland Cement Association stress analysis and thickness design procedure is also proposed and incorporated into the TKUPAV program. This program may be utilized for various structural analyses and designs of jointed concrete pavements in both the metric system and the U.S. customary system.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Darter, M. I., and Barenberg, E. J. (1977). “Design of zero-maintenance plain jointed concrete pavement: Final report.” Rep. No. FHWA-RD-77-111, Vol. 1, Federal Highway Administration, Washington, D.C.
2.
The design for concrete highway and street pavements. (1984). Portland Cement Association, Skokie, Ill.
3.
Friedman, J. H., and Stuetzle, W. (1981). “Projection pursuit regression.” J. Am. Statistical Assn., 76, 817–823.
4.
“The AASHO road test, report 5: Pavement research.” (1962). Spec. Rep. 61E, Publ. 954, Highway Research Board, HRB. National Research Council, Washington, D.C.
5.
Ioannides, A. M. ( 1984). “Analysis of slabs-on-grade for a variety of loading and support conditions,” PhD dissertation, University of Illinois, Urbana, Ill.
6.
Ioannides, A. M., Thompson, M. R., and Barenberg, E. J. (1985). “The Westergaard solutions reconsidered.” Transp. Res. Rec. 1043, Transportation Research Board, Washington, D.C., 13–23.
7.
Korovesis, G. T. ( 1990). “Analysis of slab-on-grade pavement systems subjected to wheel and temperature loadings,” PhD dissertation, University of Illinois, Urbana, Ill.
8.
Lee, Y. H. ( 1993). “Development of pavement prediction models,” PhD dissertation, University of Illinois, Urbana, Ill.
9.
Lee, Y. H., and Darter, M. I. (1994a). “Loading and curling stress models for concrete pavement design.” Transp. Res. Rec. 1449, Transportation Research Board, Washington, D.C., 101–113.
10.
Korovesis, G. T. ( 1990). “Analysis of slab-on-grade pavement systems subjected to wheel and temperature loadings,” PhD dissertation, University of Illinois, Urbana, Ill.
11.
Lee, Y. H. ( 1993). “Development of pavement prediction models,” PhD dissertation, University of Illinois, Urbana, Ill.
12.
Lee, Y. H., and Darter, M. I. (1994a). “Loading and curling stress models for concrete pavement design.” Transp. Res. Rec. 1449, Transportation Research Board, Washington, D.C., 101–113.
13.
Lee, Y. H., and Darter, M. I. (1994b). “New predictive modeling techniques for pavements.” Transp. Res. Rec. 1449, Transportation Research Board, Washington, D.C., 234–245.
14.
Lee, Y. H., and Lee, Y. M. (1995). “Theoretical investigation of corner stress in concrete pavements using dimensional analysis.” Final Rep. NSC83-0410-E032-009 and NSC84-2211-E032-022, National Science Council, Taiwan (in Chinese).
15.
Lee, Y. H., and Lee, Y. M. (1996). “Corner stress analysis of jointed concrete pavements.” Transp. Res. Rec. 1525, Transportation Research Board, Washington, D.C., 44–56.
16.
Lee, Y. H., Lee, Y. M., and Yen, S. T. (1996a). “Corner loading and curling stress analysis of concrete pavements.” Proc., 1996 Int. Rd. Fed.—Asia and Pacific Regional Meeting, Vol. III, 109–123.
17.
Lee, Y. H., Lee, Y. M., Yen, S. T., Bair, J. H., and Lee, C. T. (1996b). “Development of new stress analysis and thickness design procedures for jointed concrete pavements.” Phase I and Phase II, Final Rep., National Science Council, Taiwan (in Chinese).
18.
Lee, Y. H., Bair, J. H., Lee, C. T., Yen, S. T., and Lee, Y. M. (1997). “Modified PCA stress analysis and thickness design procedures.” Transp. Res. Rec. 1568, Transportation Research Board, Washington, D.C., 77–88.
19.
Microsoft FORTRAN PowerStation professional development system: User's and reference manuals. (1994). Microsoft Taiwan Corp.
20.
Microsoft visual basic (Ver. 4.0) programmer's guide and language reference. (1995). Microsoft Taiwan Corp.
21.
S-PLUS for Windows (ver. 3.3) user's manual and reference manual. (1995). Seattle, Wash.
22.
Tayabji S. D., and Colley, B. E. (1986). “Analysis of jointed concrete pavement.” Rep. No. FHWA-RD-86-041, Federal Highway Administration, Washington, D.C.
23.
Teller, L. W., and Sutherland, E. C. (1943). “The structural design of concrete pavements—Part 5: An experimental study of analysis of stress condition in concrete pavement slabs of uniform thickness.” Public Roads, 23(8).
24.
Thompson, M. R., Barenberg, E. J., Carpenter, S. H., Darter, M. I., Dempsey B. J., and Ioannides, A. M. (1990). “Calibrated mechanistic structural analysis procedures for pavement.” NCHRP 1-26, Final Rep. and Appendices, University of Illinois, Urbana, Ill.
25.
Westergaard, H. M. (1926). “Computation of stresses in concrete roads.” Proc., 5th Annu. Meeting of the Hwy. Res. Board, Part I, National Research Council, Washington, D.C., 90–112.
26.
Westergaard, H. M. (1927). “Analysis of stresses in concrete pavements due to variations of temperature.” Proc., 6th Annu. Meeting of the Hwy. Res. Board, National Research Council, Washington, D.C., 201–217.
27.
Yen, T., and Lin, P. S., et al. (1994). “Practical design study of rigid pavements in Taiwan.” Final Rep. of Phase I and Phase II, Taiwan Area National Expressway Engineering Bureau, Taiwan.
Information & Authors
Information
Published In
History
Received: Aug 4, 1998
Published online: Jul 1, 1999
Published in print: Jul 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.