Optimal Work Zone Lengths for Two-Lane Highways
Publication: Journal of Transportation Engineering
Volume 125, Issue 1
Abstract
Highway pavement maintenance is very expensive not only in terms of costs to the responsible agencies, but also in terms of disruptive delays to users. Construction and maintenance activities on two-lane, two-way highways often require the closure of one travel lane. Longer work zones and the longer cycle times associated with such zones tend to increase the user delay costs. Maintenance work can be performed more efficiently, i.e., with fewer repeated setups, in longer zones. A mathematical model is developed to optimize the work zone length and traffic control on two-lane, two-way highways where one lane at a time is closed. The objective is to minimize the total cost, including the agency cost and user delay cost. Unbalanced traffic flows in both directions are considered. The optimized variables (e.g., work zone length and cycle time) and the sensitivity results generated from a numerical example are presented in this study.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Cassidy, M. J., and Han, L. D. ( 1992). “Predicting vehicle delays, and queue lengths on two-lane highways during maintenance activity.” TRB 71st Annu. Meeting, Transportation Research Board, Washington, D.C.
2.
Dudek, C. L., and Richard, S. H. ( 1982). “Traffic capacity through urban freeway work zones in Texas.” Transp. Res. Rec. 869, Transportation Research Board, Washington, D.C., 14–18.
3.
Dudek, C. L., Richard, S. H., and Buffington, J. L. ( 1986). “Some effects of traffic control on four-lane divided highways.” Transp. Res. Rec. 1086, Transportation Research Board, Washington, D.C., 20–30.
4.
Highway capacity manual. (1985). Spec. Rep. 209. Transportation Research Board, Washington, D.C.
5.
Janson, B. N., Anderson, R. B., and Cummings, A. ( 1987). “Mitigating corridor travel impacts during reconstruction: An overview of literature, experiences, and current research.” Transp. Res. Rec. 1132, Transportation Research Board, Washington, D.C., 34–41.
6.
Krammers, R. A., and Lopez, G. O. ( 1994). “Updated capacity values for short-term freeway work zone lane closures.” TRB 73rd Annu. Meeting, Transportation Research Board, Washington, D.C.
7.
Lewis, R. M. ( 1989). “Work-zone traffic control concepts and terminology.” Transp. Res. Rec. 1230, Transportation Research Board, Washington, D.C., 1–11.
8.
Manual on uniform traffic control devices for streets and highways (MUTCD). (1988). Federal Highway Administration, Washington, D.C.
9.
Martineli, D. R., and Xu, D. (1996). “Delay estimation and optimal length for four-lane divided freeway work zones.”J. Transp. Engrg., ASCE, 122(2), 114–122.
10.
McCoy P. T., Pang, M., and Post, E. R. ( 1980). “Optimum length of two-lane, two-way, no-passing traffic operation in construction and maintenance zones on rural four-lane divided highways.” Transp. Res. Rec. 773, Transportation Research Board, Washington, D.C., 20–24.
11.
McCoy P. T., and Peterson, D. J. ( 1987). “Safety effects of two-lane, two-way segment length through work zones on normally four-lane divided highways.” Transp. Res. Rec. 1163, Transportation Research Board, Washington, D.C., 15–21.
12.
Memmott, J. L., and Dudek, C. L. ( 1984). “Queue and cost evaluation of work zones (QUEWZ).” Transp. Res. Rec. 979, Transportation Research Board, Washington, D.C., 12–19.
13.
Pain, R. F., McGee H. W., and Knapp, B. G. ( 1981). “Evaluation of traffic control for highway work zones.” Nat. Cooperative Hwy. Res. Program Rep. No. 236.
14.
Richard, S. H., and Dudek, C. L. ( 1986). “Implementation of work-zone speed control measures.” Transp. Res. Rec. 1086, Transportation Research Board, Washington, D.C., 36–42.
15.
Rouphail, N. M., and Tiwari, G. ( 1985). “Flow characteristics at freeway lane closures.” Transp. Res. Rec. 1035, Transportation Research Board, Washington, D.C., 50–58.
16.
Rouphail, N. M., Yang, Z. S., and Fazio, J. ( 1988). “Comparative study of short and long term urban freeway work zones.” Transp. Res. Rec. 1163, Transportation Research Board, Washington, D.C., 4–14.
17.
Underwood, C. ( 1994). “Time to re-cast the 1994/5 structure maintenance programme.” Hwy. and Transp., 14–15.
18.
Zhou, G.-C. ( 1996). “Combined costs of vehicle user and maintenance operation in four-lane divided highways by simulation analysis,” Scholarly paper, Transp. Studies Ctr., Univ. of Maryland, College Park.
Information & Authors
Information
Published In
History
Received: Jan 21, 1998
Published online: Jan 1, 1999
Published in print: Jan 1999
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.