Measurement of Transfer Lengths on Pretensioned Concrete Elements
Publication: Journal of Structural Engineering
Volume 123, Issue 5
Abstract
This paper reports an experimental program conducted to measure the transfer lengths (or transmission lengths) of pretensioned seven-wire strands in pretensioned concrete specimens. The primary goals of the research were to investigate the ability of the larger 15.2 mm (0.6 in.) strand to reliably transfer its prestressing forces within a reasonable transfer length, and to evaluate the current design provisions for transfer lengths. Eight specimens were pretensioned with 12.7 mm (0.5 in.) diameter strands and 10 specimens were pretensioned with 15.2 mm (0.6 in.) strands. Experimental results indicate that the larger 15.2 mm (0.6 in.) diameter strands require longer transfer lengths and cause more distress than the smaller 12.7 mm (0.5 in.) strands. However, the tests indicate that 15.2 mm (0.6 in.) strands can be readily employed for pretensioned concrete structures. Additionally, the results demonstrate that current design practice estimating transfer lengths can lead to unsafe designs and that a more reliable expression for transfer lengths should be adopted.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Buckner, C. D.(1995). “A review of strand development length for pretensioned concrete members.”PCI J., 40(2), 85–105.
2.
“Building code requirements for reinforced concrete and commentary.” (1995). ACI 318-95, Am. Concrete Inst. (ACI), Detroit, 353.
3.
Castrodale, R. W., Kreger, M. E., and Burns, N. H. (1988a). “A study of pretensioned high strength concrete girders in composite highway bridges—design considerations.”Res. Rep. 381-4F, Ctr. for Transp. Res., Univ. of Texas at Austin, 281.
4.
Castrodale, R. W., Kreger, M. E., and Burns, N. H. (1988b). “A study of pretensioned high strength concrete girders in composite highway bridges—laboratory tests.”Res. Rep. 381-3, Ctr. for Transp. Res., Univ. of Texas at Austin, 210.
5.
Cousins, T. E., Johnston, D. W., and Zia, P. (1986). “Bond of epoxy coated prestressing strand.”Rep. FHwA/NC/87-005, Ctr. for Transp. Engrg. Studies, Dept. of Civ. Engrg., North Carolina State Univ., Raleigh, N.C., 191.
6.
Cousins, T. E., Johnston, D. W., and Zia, P.(1990). “Transfer length of epoxy-coated prestressing strand.”ACI Mat. J., 87(3), 309–318.
7.
Edwards, A. D., and Picard, A.(1972). “Bonding properties of 0.5 inch diameter strand.”J. ACI, 69(11), 684–689.
8.
Hanson, N. W., and Kaar, P. H.(1959). “Flexural bond tests of pretensioned prestressed beams.”J. ACI, 30(7), 783–802.
9.
Hanson, N. W.(1969). “Influence of surface roughness of prestressing strand in bond performance.”PCI J., 14(1), 32–45.
10.
Janney, J. R.(1954). “Nature of bond in pre-tensioned prestressed concrete.”J. ACI, 25(9), 717–736.
11.
Janney, J. R.(1963). “Report of strand transfer length studies on 270K prestressing strand.”PCI J., 8(1), 41–45.
12.
Kaar, P. H., LaFraugh, R. W., and Mass, M. A.(1963). “Influence of concrete strength on strand transfer length.”PCI J., 8(5), 47–67.
13.
Kaar, P. H., and Magura, D. D.(1965). “Effect of strand blanketing on performance of pretensioned girders.”PCI J., 10(6), 20–34.
14.
Kaar, P. H., and Hanson, N. W. (1975). “Bond fatigue tests of beams simulating pretensioned concrete crossties.”PCI J., (20)5, 65–80.
15.
Mitchell, D., Cook, W. D., Khan, A. A., and Tham, T.(1993). “Influence of high strength concrete on transfer and development length of prestressing strand.”PCI J., 38(3), 52–66.
16.
Russell, B. W., and Burns, N. H. (1993). “Design guidelines for transfer, development and debonding of large diameter seven wire strands in pretensioned concrete girders.”Res. Rep. 1210-5F, Ctr. for Transp. Res., Univ. of Texas at Austin, 286. Standard specifications for highway bridges, 14th Ed. (1989). Am. Assn. of State Hwy. and Transp. Officials (AASHTO), Inc., Washington, D.C.
17.
Tabatabai, H., and Dickson, T. J.(1993). “The history of the prestressing strand development length equation.”PCI J., 38(6), 64–75.
18.
Thorsen, N.(1965). “Use of large tendons in pre-tensioned concrete.”J. ACI, 27(6), 650–659.
19.
Unay, I. O., Russell, B. W., Burns, N. H., and Kreger, M. E. (1991). “Measurement of transfer length on prestressing strands in prestressed concrete specimens.”Res. Rep. 1210-1, Ctr. for Transp. Res., Univ. of Texas at Austin, 135.
20.
Zia, P., and Mostafa, T.(1977). “Development length of prestressing strands.”PCI J., 22(5), 36–51.
Information & Authors
Information
Published In
Copyright
Copyright © 1997 American Society of Civil Engineers.
History
Published online: May 1, 1997
Published in print: May 1997
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.