Improving Air-Cooled Condenser Performance in Combined Cycle Power Plants
Publication: Journal of Energy Engineering
Volume 132, Issue 2
Abstract
It has been recognized in recent times that air-cooled condensers (ACCs) are environmentally preferable to the traditional water-cooled condensers for rejecting heat in combined-cycle power plants (CCPPs). However, a drawback of ACCs is that their performance can decline with increasing ambient air temperature. A new approach is proposed in this paper that has the potential to alleviate this drawback of ACCs. In this approach, a chilled-water thermal energy storage system (TES) is used to precool the inflow air to the ACC whenever the ambient air temperature increases above the design air inlet temperature. The temperature of the TES system is maintained by an absorption refrigeration system (ARS) driven by low-quality waste heat from the CCPP. A process model integrating the CCPP with the ARS and the TES has been developed to optimize the volume of the TES. A CCPP with steam turbine net output of was chosen to evaluate the application of this approach for a power plant to be located in southern New Mexico. This analysis showed that a tank volume of will be required to maintain the air temperature at the inlet to the ACC at the design value of throughout the year. Simulations under ambient air temperatures up to indicated that the proposed system is capable of maintaining the rated net power output of the plant with minimal fluctuations. Simulations also showed that TES tank volume is most sensitive to the design air inlet temperature to the ACC—an increase of this temperature by can result in at least 25% reduction in the volume.
Get full access to this article
View all available purchase options and get full access to this article.
References
Alva, L. H., and Gonzalez, J. E. (2002). “Simulation of an air-cooled solar-assisted absorption air conditioning system.” J. Sol. Energy Eng., 124, 219–232.
Al-Waked, R., and Behnia, M. (2004). “Performance evaluation of dry-cooling systems for power plant applications.” Appl. Therm. Eng., 28, 147–161.
Cengel, Y. A., and Boles, M. A. (2002). Thermodynamics: An engineering approach, McGraw-Hill, New York, 543–547.
Conradie, A. E., Buys, J. D., and Kroger, D. G. (1998). “Performance optimization of dry-cooling systems for power plants through SQP methods.” Appl. Therm. Eng., 18(1–2), 25–45.
Conradie, A. E., and Kroger, D. G. (1996). “Performance evaluation of dry-cooling systems for power plant applications.” Appl. Therm. Eng., 16(3), 219–232.
Conradie, T. A., and Kroger, D. G. (1991). “Enhanced performance of a dry-cooled power plant through air precooling.” Proc., Int. Power Generation Conf., ASME, San Deigo, 1–6.
Dincer, I. (2002). “Thermal energy storage system as key technology in energy conservation.” Int. J. Energy Res., 26(1), 568–569.
Electric Power Research Institute (EPRI. (2004). “Spray cooling enhancement of air-cooled condensers.” http://www.energy.ca.gov/reports/2004-03-09 500-03-109.PDF .
Gupta, A. K., and Gorton, R. L. (1973). “Combined dry tower–cooling pond systems for power plant cooling.” Proc., Winter Annual Meeting Presentation, ASME, Detroit, 127–138.
Kearney, D. W., and Boyack, B. E. (1973). “Plume behavior and potential environmental effects of large dry cooling towers.” Proc., Winter Annual Meeting Presentation, AMSE, Detroit, 35–48.
Larinoff, M. W. (1973). “Dry cooling tower power plant design specifications and performance characteristics.” Proc., Winter Annual Meeting Presentation, AMSE, Detroit. 49–56.
Lees, M. (1995). “The economics of wet versus dry cooling for combined cycle.” Proc. Inst. Mech. Eng., Part B, 209, 37–44.
Leung, P. (1973). Dry cooling tower plant operation: An economic loading approach, ASME, Detroit, 77–84.
Moore, F. K. (1973). “The minimization of air heat–exchanger surface areas of dry cooling towers for large power plants.” Proc., Winter Annual Meeting Presentation, ASME, Detroit, 13–24.
Rossie, J. P., and Williams, W. A., Jr. (1973). “The economics of using conventional nuclear steam turbine-generators with dry cooling systems.” Proc., Winter Annual Meeting Presentation, ASME, Detroit, 49–56.
Schimmoller, B. K. (2001). “The hot and cold of dry of cooling.” http://pepei.pennnet.com/Articles/Article Display.cfm?Section:=Archi&Subsection=Display&P=6 &ARTICLE ID=125215&KEYWORD=The%20Hot%20and%20Cold%20of%20Dry%20cooling .
Streng, A. (1998). “Combined wet/dry cooling towers of cell-type construction.” J. Energy Eng., 124, 104–121.
Su, M. D., Tang, G. F., and Fu, S. (1999). “Numerical simulation of fluid flow and thermal performance of a dry-cooling tower under cross wind condition.” J. Wind. Eng. Ind. Aerodyn., 79, 289–306.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Received: Apr 5, 2005
Accepted: Nov 2, 2005
Published online: Aug 1, 2006
Published in print: Aug 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.