Stability of Concrete Dam: Case History
Publication: Journal of Energy Engineering
Volume 109, Issue 3
Abstract
The stability of Claytor Dam was reevaluated under probable maximum flood conditions. The structure is a concrete gravity dam with a gated spillway. The foundation is karstic limestone that was treated before construction. The anchor wall at the upstream face of the dam plays an important role in the stability of the structure. The pressure relief wells' efficiency is examined in detail as well as the hydraulic conditions used in the stability analyses. Drilling and laboratory test results of rock and concrete including direct tensile tests of the critical core‐rock interface are described. Stability analysis using two different uplift assumptions are discussed and a method of determining the increase head above tailwater level at the line of drains caused by flooding conditions are given.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
“Asphalt in Hydraulic Structures,” Manual Series No. 12 (MS‐12), Asphalt Institute, College Park, Md., Mar., 1965, pp. 119–124.
2.
Buhac, J., “Stability Analysis PMF Condition, Claytor Hydroelectric Project,” American Electric Power Service Corporation, New York, N.Y., Jan., 1980.
3.
Casagrande, A., “Control of Seepage through Foundations and Abutments of Dams,” First Rankine Lecture, The Institution of Civil Engineers, London, England, 1961.
4.
Corns, C. F., “Stability During A Probable Maximum Flood (PMF), Claytor Dam, New River, Virginia,” July 23, 1981.
5.
Design of Gravity Dams, “Design Data and Criteria,” Chapter III, U.S. Bureau of Reclamation, 1976.
6.
Gravity Dam Design, U.S. Army Corps of Engineers, Engineer Manual 1110‐2‐2200, 1960.
7.
Goodman, R., and Amadei, B., “Analysis of Uplift Pressure in a Hypothetical Crack Below Claytor Dam,” paper presented at the October 25–29, 1982, ASCE Annual Convention, held at New Orleans, La.
8.
Lin, A. C., “2nd Supplement to Dambreak Inundation Evaluation—Using Unsteady Flow Flood Routing Technique,” American Electric Power Service Corporation, New York, N.Y., June, 1982.
9.
Macinkevich, E. A., and Ephros, A. Z., “Dam Anchored to Foundation to Withstand Flood,” Civil Engineering, ASCE, Apr., 1978, pp. 55–59.
10.
Milanovic, P. T., “Karst Hydrogeology,” chapter 10, Water Resources Publication, Littleton, Colo., 1981.
11.
“Probable Maximum Flood Study for Claytor Hydroelectric Project, New River,” Nunn, Snyder & Associates, Fairfax, Va., Nov., 1972.
12.
Recommended Guidelines for Safety Inspections of Dams, Volume I, Appendix D, of the National Program for Safety Inspections of Dams, U.S. Army Corps of Engineers, 1975.
13.
Stelle, W. W., Rubin, D. I., Buhac, H. J., and Anderson, P. H., “New Role of Drainage Systems in Dam Stability,” paper presented at the October 25–29, 1982, ASCE Annual Convention, held at New Orleans, La.
14.
Tolle, J. M., Simard, P. W., and Brown, L. A., “Modern Engineering Saves Troubled Dam,” Civil Engineering, ASCE, June, 1979, pp. 18–80.
Information & Authors
Information
Published In
Copyright
Copyright © 1983 ASCE.
History
Published online: Sep 1, 1983
Published in print: Sep 1983
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.