Procedure for Estimating Surface‐Water Intake Costs
Publication: Journal of Environmental Engineering
Volume 110, Issue 2
Abstract
Previously developed cost estimating procedures for surface‐water intakes have been based primarily on a simple correlation of intake cost with one design parameter (e.g., design flow or total system cost). The cost estimating procedures presented in this paper correlate intake cost with a number of system components such as pipeline type and length (subaqueous or bridge‐supported), bridge type (pedestrian or vehicle), and pumping requirements (pumps and pump housing). Capital and operation and maintenance costs are determined for two types of intake structures: (1) Submerged; and (2) exposed tower. Costs generated by this procedure are compared with actual project costs. The average absolute value percent error in comparing these costs is 13.9 with a range of 1.3%–26.8%. This procedure is also compared to existing cost estimating methodologies. Costs derived by the procedure presented in this paper are believed to be more accurate due to the consideration of several site‐specific variables.
Get full access to this article
View all available purchase options and get full access to this article.
References
1.
Clark, R. M., “Cost Estimating for Conventional Water Treatment,” Journal of the Environmental Engineering Division, ASCE, Vol. 108, No. EE5, 1982, 819–834.
2.
Day, S., Wanning, H., and Debo, T., “A Guide to Investment in Water Systems for Local Officials,” Engineering Experiment Station and Department of City Planning, Georgia Institute of Technology, Atlanta, Ga., 1979.
3.
Gumerman, R. C., Culp, R. L., and Hansen, S. P., “Estimating Water Treatment Costs,” EPA‐600/2‐70‐162, U.S. Environmental Protection Agency, Cincinnati, Ohio, 1979.
4.
Hinomoto, H., “Capital Cost Functions of a Surface Water Treatment Plant and Its Components,” Water Resources Research, Vol. 13, No. 6, 1977, pp. 873–876.
5.
Koenig, L., “Costs of Conventional Water Supply, In: Principles of Desalinization,” K. S. Spiegler, ed., Academic Press, New York, N.Y., 1966, pp. 515–551.
6.
Lindsey, A. K., and Walski, T. M., “Verification of Cost Estimating Procedures for MAPS Computer Program,” Technical Report EL‐82‐3, U.S. Army Engineer Waterways Experiment Station, Vicksburg, Miss., 1982.
7.
Office of the Chief of Engineers, “MAPS User's Guide and Documentation,” Engineering Manual 1110‐2‐502, Washington, D.C., 1980.
8.
Office of the Chief of Engineers, “Planning Level Cost Estimates and Selection of Sanitary Facilities at Recreational Areas,” Draft Engineering Manual 1110‐2‐401, Washington, D.C., 1983.
9.
U.S. Army Engineer Division, North Pacific, “Hydropower Cost Estimating Manual,” Portland, Oreg., 1979.
10.
Walski, T. M., “MAPS—A Planning Tool for Corps of Engineers Regional Water Supply Studies,” Water Resources Bulletin, Vol. 16, No. 2, 1980, pp. 215–219.
Information & Authors
Information
Published In
Copyright
Copyright © 1984 ASCE.
History
Published online: Apr 1, 1984
Published in print: Apr 1984
Authors
Metrics & Citations
Metrics
Citations
Download citation