Factors Influencing Building Contractors’ Pricing for Time-Related Risks in Tenders

Publication: Journal of Construction Engineering and Management
Volume 135, Issue 3

Abstract

The contractors’ pricing for contract risks in tenders determines how much the employers have to pay for the risk transfer. Therefore, understanding the factors influencing the contractors’ pricing for contract risks is crucial for employers to optimize the cost effectiveness of risk allocation in contracts. This study investigates the factors that contractors perceive to be important when they are pricing “time-related” contract risks. A questionnaire survey was designed for collecting data from building contractors currently operating in Hong Kong. Contractors were not only required to rate the importance of individual factors, but also to state the cost implications when compared with normal pricing in the absence of the concerned factor. The findings reveal that a single factor may have two-sided implications (both inflating and deflating the prices) for which they can be in unequal scales. These scales vary according to the contractor size and the reasons of the differences are investigated. The findings also assist employers in formulating a cost effective contract strategy by equipping them with the necessary knowledge.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

Acknowledgement is given to all parties who have made themselves available for participating in the research survey and to J. Wong, I. Young, and R. Yuen for taking part in related discussions and giving advice during their coursework exercises with the second writer. This research is supported by funding provided by the Research Grant Committee of the Hong Kong Polytechnic University.

References

Ahmad, I., and Minkarah, I. A. (1988). “Questionnaire survey on bidding in construction.” J. Manage. Eng., 4(3), 229–243.
Akintoye, A. (2000). “Analysis of factors influencing project cost estimating practice.” Constr. Manage. Econom., 18, 77–89.
Chua, D. K. H., and Li, D. (2000). “Key factors in bid reasoning model.” J. Constr. Eng. Manage., 126(5), 349–357.
Dozzi, S. P., AbouRizk, S. M., and Schroeder, S. L. (1996). “Utility-theory model for bid mark-up decisions.” J. Constr. Eng. Manage., 122(2), 119–124.
Drew, D. S., and Skitmore, R. M. (1997). “The effect of contract type and size on competitiveness in bidding.” Constr. Manage. Econom., 15, 469–489.
Dulaimi, M. F., and Shan, H. G. (2002). “The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore.” Constr. Manage. Econom., 20, 601–610.
Fayek, A. (1998). “Competitive bidding strategy model and software system for bid preparation.” J. Constr. Eng. Manage., 124(1), 1–10.
Kish, L. (1965). Survey sampling, Wiley, New York, 45–53.
Li, H., and Love, P. (1999). “Combining rule-based expert systems and artificial neural networks for mark-up estimation.” Constr. Manage. Econom., 17, 169–176.
Shash, A. A. (1993). “Factors considered in tendering decisions by top UK contractors.” Constr. Manage. Econom., 11, 111–118.
Shash, A. A., and Abdul-Hadi, N. H. (1992). “Factors affecting a contractor’s mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 10, 415–429.
Shash, A. A., and Abdul-Hadi, N. H. (1993). “The effect of contractor size on mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 11, 421–429.
Skitmore, R. M. (1991). “The construction contract bidder homogeneity assumption: An empirical test.” Constr. Manage. Econom., 9(5), 403–429.
Smith, G. R., and Bohn, C. M. (1999). “Small to medium contractor contingency and assumption of risk.” J. Constr. Eng. Manage., 125(2), 101–108.
Wallwork, J. W. (1999). “Is there a right price in construction bids?” Cost Eng., 40(2), 41–43.
Wanous, M., Boussabaine, A. H., and Lewis, J. (2000). “To bid or not to bid: A parametric solution.” Constr. Manage. Econom., 18, 457–466.
Wanous, M., Boussabaine, A. H., and Lewis, J. (2003). “A neural network bid/no bid model: The case for contractors in Syria.” Constr. Manage. Econom., 21, 737–744.
Xu, T., and Tiong, R. (2001). “Risk assessment on contractors’ pricing strategies.” Constr. Manage. Econom., 19, 77–84.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 135Issue 3March 2009
Pages: 135 - 145

History

Received: Nov 28, 2005
Accepted: Sep 11, 2008
Published online: Mar 1, 2009
Published in print: Mar 2009

Permissions

Request permissions for this article.

Authors

Affiliations

Edwin H. Chan [email protected]
Professor, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong SAR, China. E-mail: [email protected]
Maria C. Au
Ph.D. Student, Dept. of Building and Real Estate, Hong Kong Polytechnic Univ., Hung Hom, Kowloon, Hong Kong SAR, China.

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share