Abstract

The need to match project managers’ (PMs) performance measures onto projects of both unique and similar characteristics has long since been acknowledged by researchers. The need for these measures to reflect the various phases of the project life cycle has also been contended in the recent past. Here, a competency-based multidimensional conceptual model is proposed for mass house building projects (MHBPs). The model reflects both performance behaviors and outcome in predicting the PMs’ performances at the conceptual, planning, design, tender, construction, and operational phases of the project life cycle. Adopting a positivist approach, data elicited for the construction phase is analyzed using multiple regression techniques (stepwise selection). Out of a broad range of behavioral metrics identified as the independent variables, the findings suggest the best predictors of PMs’ performances in MHBPs at the construction phase are: job knowledge in site layout techniques for repetitive construction works; dedication in helping works contractors achieve works schedule; job knowledge of appropriate technology transfer for repetitive construction works; effective time management practices on house units; ability to provide effective solution to conflicts, simultaneously maintaining good relationships; ease with which works contractors are able to approach the PM and volunteering to help works contractors solve personal problems. ANOVA, multicollineriality, Durbin–Watson, and residual analysis, confirm the goodness of fit. Validation of the model also reflected reasonably high predictive accuracy suggesting the findings could be generalized. These results indicate that the model can be a reliable tool for predicting the performance of PMs in MHBPs.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The Government of Ghana is acknowledged for providing the scholarship funding. The writers also wish to thank Mr. William K. Ahadzie and Dr. Theophilus Adjei-Kumi for facilitating the distribution of the RIs in Ghana. Sincere thanks to Nii Tieku-Okine, an executive member at the GREDA Secretariat for assisting with the list of GREDA members. The writers wish to also thank all the participants who responded to the survey. Finally, they wish to thank two anonymous reviewers who made useful contributions to improve the quality of the paper.

References

Ahadzie, D. K. (2007). “A model for predicting the performance of project managers in mass house building projects in Ghana.” Ph.D. thesis, Univ. of Wolverhampton, West Midlands, U.K.
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2004). “Meeting housing delivery targets in developing countries: the contribution of project managers in Ghana.” Globalization and construction in developing countries, S. Ogunlana, ed., AIT Conference Centre, Bangkok, Thailand, 620–630
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2005a). “Construction performance measurement systems: Emerging research needs.” 5th Int. Postgraduate Research Conf., 736–746.
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2005b). “Project management performance measures: a fresh perspective.” 21st ARCOM Conf., Vol. 1, School of Oriental and African Studies (SOAS), University College of London, London, 3–14.
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2006a). “Development of research instrument for project managers performance measures.” D. Boyd, ed., 22nd ARCOM Conference, 165–175.
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2007a). “Critical success criteria for mass house building projects in developing countries.” Int. J. Proj. Manage. 9(6), in press.
Ahadzie, D. K., Proverbs, D. G., and Olomolaiye, P. (2007b). “Towards developing competency-based measures for construction project managers: Should contextual performance behaviours be distinguished from task performance behaviours.” Int. J. Proj. Manage., 9(11), in press.
Ahadzie, D. K., Proverbs, D. G., Olomolaiye, P., and Gameson, R. (2006b). “A conceptual predictive model for evaluating the performance of project managers in mass house building projects.” Construction Sustainability and Innovation/CIB W 89, Int. Conf. on Building Education and Research.
Ashley, D. B. (1980). “Simulation of repetitive—Unit construction.” J. Constr. Div., Proc., ASCE, 106(Co2), 185–198.
Bailey, D. K. (1987). Methods of social research, Conlier Macmillan, London.
Barber, E. (2004). “Benchmarking the management of projects: A review of current thinking.” Int. J. Proj. Manage., 22, 301–307.
Belout, A., and Gauvreau, C. (2004). “Factors influencing project success: the impact of human resource management.” Int. J. Proj. Manage., 22, 1–11.
Blaikie, N. (2003). Analyzing quantitative data, Sage, London.
Borman, W. C., and Motowidlo, S. T. (1997). “Task performance and contextual performance: The meaning for personnel selection research.” J. Hum. Perform., 10(2), 99–109.
Brace, N., Kemp, R., and Snelgar, R. (2003). SPSS for psychologists: A guide to data analysis using SPSS for Windows.
Burgess, R. A., and White, G. (1979). Building production and construction processes, The Construction Press, London.
Campbell, J. P., McCloy, R. A., Opler, S. H., and Sager, C. E. (1993). “A theory of performance.” Personnel selection in organizations, F. Schmidt and W. C. Borman, eds., BASS, San Francisco, Calif., 35–70.
Chan, D. W. M. and Kumaraswamy, M. M. (1999). “Forecasting construction durations for public housing projects: A Hong Kong perspective.” Build. Environ., 34, 633–646.
Cheng, M. I., Dainty, A. R. J., and Moore, D. R. (2005). “What makes a good project managers?” J. Hum. Resour Manage, 15(1), 25–37.
Clarke, A. (1999). “A practical use of key success factors to improve the effectiveness of project management.” Int. J. Proj. Manage., 17(3), 139–145.
Conway, J. (1999). “Distinguishing contextual performance from task performance for managerial jobs.” J. Appl. Psychol., 84(1), 3–13.
Cooke-Davies, T. (2002). “The real success factors on project.” Int. J. Proj. Manage., 20, 185–190.
Crawford, L., Pollack, J., and Englund, D. (2006). “Uncovering the trend in project management: Journal emphases over the last 10 years.” Int. J. Proj. Manage., 24, 175–184.
Dainty, A. R. N., Cheng, M.-I., and Moore, D. R. (2003). “Redefining performance measures for construction project managers: An empirical evaluation.” Constr. Manage. Econom., 21, 209–218.
Dainty, A. R. J., Cheng, M.-I., and Moore, D. R. (2004). “A competency—Based performance model for construction project managers.” Constr. Manage. Econom., 22, 877–886.
Dainty, A. R. J., Cheng, M.-I., and Moore, D. (2005). “Competency-based model for predicting construction project managers’ performance.” J. Manage. Eng., 21(1), 2–9.
Edmonds, G. A., and Miles, D. W. J. (1984). Foundations for change: Aspects of the construction industry in developing countries, Intermediate Technology Publications, London.
Egbu, C. O. (1999). “Skills, knowledge, and competencies for managing construction refurbishment works.” Constr. Manage. Econ., 17, 29–43.
Elbeltagi, E., Hegazy, T., Hosny, A. H., and Eldosouky, A. (2001). “Schedule-dependent evolution of site layout planning.” Constr. Manage. Econom., 19, 689–697.
Enshassi, A. (1997). “Site organization and supervision in housing projects in the Gaza strip.” Int. J. Proj. Manage., 15(2), 93–99.
Field, A. (2005). Discovering statistics using SPSS, Sage, London.
Fryer, B. G. (1990). The practice of construction management, BSP Professional Books.
Fraser,C., and Zakrada-Fraser, C. (2003). “Investigating the effectiveness of project managers using an analysis of stakeholder perceptions.” Journal of Management Development, 22(9), 726–783.
Gellatly, I. R., and Irving, R. G. (2001). “Personaltiy, automony and contextual performance of managers.” Human Performance, 14(3), 231–245.
Good, I. P., and Hardin, J. W. (2003). Common errors in statistics (and how to avoid them), Wiley, London.
Guadagnoli, E., and Velicar, W. (1988). “Relation of sample size to the stability of component patterns.” Psychol. Bull., 103, 265–275.
Holloway, J. A., Hinton, C. M., Mayle, D. T., and Francis, G. A. W. (1997). “Why benchmarking? understanding the process of best practice benchmarking.” Proc., Business Track, British Academy of Management Conference, British Academy of Management, London, 271–291.
Hunter, J. (1983). “A causal analysis of cognitive ability, job knowledge, job performance and supervisory ratings.” Performance measurement and theory, F. Landy, S. Zedeck, and J. Cleveland, eds., Erlbaum, Hillsdale, N.J., 257–266.
Hyari, K., and El-Rayes, K. (2005). “Optimal planning and scheduling for repetitive construction projects.” J. Manage. Eng., 22(1), 11–19.
Latham, G. P., Fay, C., and Saari, L. M. (1979). “The development of behavioral observations scales for appraising the performance of foremen.” Personnel Psychology, 32, 299–311.
Leung, M. Y., Liu, A. M. M., and Ng, T. S. (2005). “Is there a relationship between construction conflicts and participants satisfaction?” Eng., Constr., Archit. Manage., 12(2), 149–167.
Lim, C. S., and Mohammed, Z. (1999). “Criteria of project success: An exploratory re-examination.” Int. J. Proj. Manage., 17, 243–248.
Lyon, P. (2003). “Influencing performance improvement using skills charting.” J. Eur. Indust. Train., 27(8), 398–404.
Mahdi, I. M. (2004). “A new LSM approach for planning repetitive housing projects.” Int. J. Proj. Manage., 22, 339–346.
Maylor, M. (1999). Project management, Gower, London.
Mehta, R., and Bridwell, L. (2005). “Innovative construction technology for affordable mass housing in Tanzania, East Africa.” Constr. Manage. Econom., 23, 69–79.
Meyers, L., et al. (2006). Applied multivariate research: Design and interpretation, Sage, London.
Motowidlo, S. J., Borman, W. C., and Schimt, J. M. (1997). “A theory of individual differences in task and contextual performance behaviors.” Journal of Human Performance, 10(2), 71–83.
Muhlemann, A., Oakland, J., and Lockyer, K. (1992). Production and operations management, Pitman, London.
Ngowi, A. B. (2001). “Creating competitive advantage by using environment-friendly building processes.” Build. Environ., 36, 291–298.
Ogunlana, S., Siddiqui, Z., Yisa, S., and Olomolaiye, P. (2002). “Factors and procedures used in matching project managers to construction projects in Bangkok.” Int. J. Proj. Manage., 20, 385–400.
Organ, D. W., and Piane, J. B. (1999). “A new kind of performance for industrial and organizational pyschology.” Int. Rev. of Ind. and Organiz. Psychol., 14, 337–368.
Pheng, L. S., and Hui, M. K. (1999). “The application of JIT philosophy to construction: A case study in site layout.” Constr. Manage. Econom., 17, 657–668.
Pheng, S. L., and Chuan, Q. T. (2006). “Environmental factors and work performance of project managers in the construction industry.” Int. J. Proj. Manage., 24, 24–37.
Pickett, L. (1998). “Competencies and managerial effectiveness: putting competencies to work.” Public Personnel Management, 27(1), 103–114.
Pinto, J. K. and Slevin, D. P. (1988). “Project success: Definition and measurement techniques.” Proj. Manage. J., 19(1), 67–71.
Sadeghpour, F., Moselhi, O., and Alkass, T. S. (2006). “Computer aided site layout planning.” J. Constr. Eng. Manage., 132(2), 143–151.
Schmidt, F. L., Hunter, J. E., and Outrbridge, A. N. (1986). “Impact of job experience and ability on job knowledge, work sample performance and supervisory ratings of job performance.” J. Appl. Psychol., 71, 432–439.
Schwartzkopf, W. (1995). Calculating lost labour productivity in construction claims, John Wiley & Sons, New York.
Scullen, S. E., Judge, T. A., and Mount, M. K. (2003). “Evidence of the construct validity of development ratings of managerial performance.” J. Appl. Psychol., 88(1), 50–66.
Skipper, C. O., and Lansford, C. B. (2006). “Assessment with 360 degrees evaluations of leadership behaviour in construction project managers.” J. Manage. Eng., 22(2), 75–80.
Tam, C. M., and Tong, T. K. L. (2003). “GA-ANN model supply for optimizing the location of tower crane and supply points for high-rise public housing construction.” Constr. Manage. Econom., 21, 257–266.
Tett, R. P., Guterman, H. L., Bleier, A., and Murphy, P. J. (2000). “Development and content validation of a hyperdimensional taxonomy of managerial competence.” Human Performance, 13(3), 205–251.
Toole, M. (1998). “Uncertainty and home builders’ adoption of technological innovations.” J. Constr. Eng. Manage., 124(4), 323–332.
Van Scotter, J. R., and Motowidlo, S. J. (1996). “Interpersonal facilitation and job dedication as separate facets of contextual performance.” J. Appl. Psychol., 81(5), 525–531.
Walliman, N. (2001). Your research project: A step-by-step guide for the first time researcher, Sage Publications.
Yang, L. R., O’Connor, J. T., and Wang, C. C. (2006). “Technology utilization on different sizes of projects and associated impacts on composite project success.” Int. J. Proj. Manage., 24, 96–105.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 134Issue 8August 2008
Pages: 618 - 629

History

Received: Oct 12, 2006
Accepted: Jan 14, 2008
Published online: Aug 1, 2008
Published in print: Aug 2008

Permissions

Request permissions for this article.

Authors

Affiliations

D. K. Ahadzie
Research Fellow, Center for Settlement Studies, Kwame Nkrumah Univ. of Science and Technology, Kumasi, Ghanan; formerly, Ph.D. Candidate, School of Engineering and the Built Environment, Univ. of Wolverhampton, Wolverhampton, WV1, 1SB, U.K. (corresponding author). E-mail: [email protected]
D. G. Proverbs
Professor of Project Management and Head of Construction and Infrastructure, School of Engineering and the Built Environment, Univ. of Wolverhampton, Wolverhampton, WV1 1SB, U.K. E-mail: [email protected]
P. O. Olomolaiye
Professor of Project Management and Dean, School of Engineering and the Built Environment, Univ. of Wolverhampton, Wolverhampton, WV1 1SB, U.K. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share