Construction Process Reengineering by Integrating Lean Principles and Computer Simulation Techniques
Publication: Journal of Construction Engineering and Management
Volume 134, Issue 5
Abstract
A construction process reengineering framework and its corresponding methodologies have been developed by integrating lean principles and computer simulation techniques. Instead of classifying activities into value-adding and non-value-adding activities, or into conversion and flow activities as is common in lean production practices, this framework classifies activities into main and supportive activities and/or into normal and interactive activities. This classification makes it more effective in modeling the construction workflow and reengineering the construction process. It also avoids the confusion of the classification of activities into value-adding and non-value-adding activities encountered in the construction industry. In addition, computer simulation techniques are incorporated into the framework to virtually simulate and assess the efficiency and effectiveness of the reengineered construction process that is achieved based on lean principles. Simulation makes it easier to quantify and assess the effectiveness and efficiency of the reengineered construction process.
Get full access to this article
View all available purchase options and get full access to this article.
References
AbouRizk, S. M., and Hajjar, D. (1998). “A framework for applying simulation in the construction industry.” Can. J. Civ. Eng., 25(3), 604–617.
Agbulos, A., and AbouRizk, S. M. (2003). “An application of lean concepts and simulation for drainage operations maintenance crews.” Proc., Winter Simulation Conf., New Orleans, 1534–1540.
Al-Sudairi, A. A., Diekman, J. E., Songer, A. D., and Brown, H. M. (1999). “Simulation of construction processes: Traditional practices versus lean construction.” Proc., 7th Int. Group for Lean Construction Conf., Univ. of California at Berkeley, Berkeley, Calif., 39–50.
Ballard, G. (1999). “Improving work flow reliability.” Proc. 7th Int. Group for Lean Construction Conf., Univ. of California at Berkeley, Berkeley, Calif., 275–286.
Ballard, G., and Howell, G. (1994). “Implementing lean construction: Stabilizing work flow.” Proc. 2nd Annual Meeting of the Int. Group for Lean Construction, Santiago, Chile.
Centeno, M. A. (1996). “An introduction to simulation modeling.” Proc., Winter Simulation Conf., Coronado, Calif., 15–22.
Christian, J., and Hachey, D. (1995). “Effects of delay times on production rates in construction.” J. Constr. Eng. Manage., 121(1), 20–26.
Davenport, T. (1993). Process innovation: Reengineering work through information technology, Harvard Business School Press, Boston.
David, K. H. C., and Li, G. M. (2001). “Modeling construction operations with RISim.” J. Comput. Civ. Eng., 15(4), 320–328.
Farrar, J. M., AbouRizk, S. M., and Mao, X. (2004). “Generic implementation of lean concepts in simulation models.” Lean Constr. J., 1(1), 1–23.
Frontier-Kemper Constructors, Inc. (2004). “FKC-Lake Shore vertical conveying systems.” Vertical Belts, http://www.frontier-kemper.com/verticalbelts.html (October 12, 2004).
Hajjar, D., and AbouRizk, S. M. (2002). “Unified modeling methodology for construction simulation.” J. Constr. Eng. Manage., 128(2), 174–185.
Halpin, D. W. (1973). “An investigation of the use of simulation networks for modeling construction operations.” Ph.D. thesis, Univ. of Illinois, Urbana-Champaign, Ill.
Halpin, D. W. (2003). “Simulation in construction using CYCLONE and MicroCYCLONE.” https://engineering.purdue.edu/CEM/People/Personal/Halpin/Sim/index_html (April 21, 2003).
Halpin, D. W., and Kueckmann, M. (2002). “Lean construction and simulation.” Proc. Winter Simulation Conf., December, San Diego, 1697–1703.
Hammer, M., and Champy, J. (1993). Reengineering the corporation, Harper Collins, New York.
Howell, G. A. (1999). “What is lean construction?” Proc., 7th Annual Conf. of the Int. Group for Lean Construction, Berkeley, Calif., 1–10.
Ikovenko, S. (2004). “TRIZ as a lean thinking tool.” ETRIA TRIZ Future Conf., Florence, Italy, 157–164.
Koskela, L. (1992). “Application of the new production philosophy to construction.” Technical Rep. 72, Center for Integrated Facility Engineering, Dept. of Civil Engineering, Stanford Univ., Palo Alto, Calif.
Kotelnikov, V. (2006). “Lean production: Doing more with less.” http://www.1000ventures.com/business_guide/lean_production_main.html (March 15, 2006).
Project Management Institute (PMI) (2000). A guide to the project management body of knowledge, PMI, Newtown Square, Pa., 211.
TACS-GMBH. (2004). “ACS guidance system—System review.” http://www.tacsgmbh.de/en/tacs_prod_acs_overview.htm (August 8, 2004).
Womack, J. P., and Jones, D. (1996). Lean thinking: Banish waste and create wealth in your corporation, Simon & Schuster, New York, 352.
Womack, J. P., Jones, D. T., and Roos, D. (1990). The machine that changed the world, Rawson Associates, New York, 323.
Xu, J., and AbouRizk, S. M. (1999). “Product-based model representation for integrating 3D CAD with computer simulation.” Proc., Winter Simulation Conf., Phoenix, 971–977.
Zeigler, B. P. (1987). “Hierarchical, modular discrete-event modeling in an object-oriented environment.” Simulation, 49(5), 219–230.
Information & Authors
Information
Published In
Copyright
© 2008 ASCE.
History
Received: Nov 13, 2006
Accepted: Oct 18, 2007
Published online: May 1, 2008
Published in print: May 2008
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.