Determinants of Successful Design-Build Projects
Publication: Journal of Construction Engineering and Management
Volume 134, Issue 5
Abstract
A construction project is mostly initiated by the needs of the client. In order to satisfy the client’s requirements in terms of time, cost, and quality, various procurement methods are recommended for selection to increase the chance of success for the complex sequence of activities. Design-build (D&B) integrates design and construction to overcome some of the hurdles inherent in the traditional design-bid-build method. It has been extensively used worldwide and its distinctive features are claimed to deal with the problems of the traditional design-bid-build method. An investigation into the determinants of successful D&B projects can therefore help set a benchmark study for industry practitioners to compare their project performance. To better indicate the success level of D&B projects, the writers developed a project success index for D&B projects in the Hong Kong context, which is assessed by the key project performance indicators of time, cost, quality, and functionality. Multiple regression analysis is then applied to show that the project nature, the effective project management action, and the adoption of innovative management approaches are the critical success factors for D&B projects. The identification of success criteria can furnish project participants with indicators to attain success for their D&B projects for benchmarking and control purposes. The predictors for D&B project success were also determined to enrich the knowledge base for the D&B procurement system.
Get full access to this article
View all available purchase options and get full access to this article.
References
Akintoye, A., and Fitzgerald, E. (1995). “Design and build: A survey of architects’ views.” Eng., Constr., Archit. Manage., 2(1), 27–44.
Arditi, D., and Lee, D. E. (2003). “Assessing the corporate service quality performance of design-build contractors using quality function deployment.” Constr. Manage. Econom., 21(2), 175–185.
Belsley, D. A., Kuh, E., and Welsch, R. E. (1980). Regression diagnostics: identifying influential data and sources of collinearity. Wiley, New York.
Black, K. (1997). Business statistics: Contemporary decision making, West Publishing Company, St. Paul.
Chan, A. P. C. (1996). “Determinants of project success in the construction industry of Hong Kong.” Unpublished Ph.D. thesis, Univ. of South Australia, Adelaide, Australia.
Chan, A. P. C. (2000). “Evaluation of enhanced design and build system—A case study of a hospital project.” Constr. Manage. Econom., 18(8), 863–871.
Chan, A. P. C., Chan, D. W. M., Fan, L. C. N., Lam, P. T. I., and Yeung, J. F. Y. (2004). “A comparative study of project partnering practices in Hong Kong.” Summary Rep., Research Rep. No. 1, Construction Industry Institute, Hong Kong, ISBN 988-98153-1-1.
Chan, A. P. C., Scott, D., and Lam, E. W. M. (2002). “Framework of success criteria for design/build projects.” J. Manage. Eng., 18(3), 120–128.
Cheng, R. T. L. (1995). “Design & build—contractor’s role.” Proc., Design and Build Projects—International Experiences, International Congress on Construction, Singapore, 232–241.
Deakin, P. (1999). “Client's local experience on design and build projects.” Seminar Proc. on Design and Build Procurement System, Hong Kong, 11–16.
Ernzen, J. J., and Schexnayder, C. (2000). “One company’s experience with design/build: Labor cost risk and profit potential.” J. Constr. Eng. Manage., 126(1), 10–14.
Hair, J. F., Anderson, R. E., Tatham, R. L., and Black, W. C. (1998). Multivariate data analysis, Prentice-Hall, Upper Saddle River, N.J.
Hemlin, D. (1999). “Contractor’s local experience on design/build projects.” Seminar Proc., Design and Build Procurement System, Hong Kong, 17–26.
Kaiser, H. F. (1974). “An index of factorial simplicity.” Psychometrika, 39, 31–36.
Kim, J. O., and Mueller, C. W. (1978). Factor analysis—Statistical methods and practical issues, Sage, Beverly Hills, Calif.
Lam, E. W. M., Chan, A. P. C., and Chan, D. W. M. (2007). “Benchmarking the performance of design-build projects: Development of Project Success Index.” Benchmarking: An Int. J., 14(5), 624–638.
Leung, K. S. (1999). “Characteristics of design and build projects.” Seminar Proc., on Design and Build Procurement System, Hong Kong, 1–10.
Li, B., Akintoye, A., Edwards, P. J., and Hardcastle, C. (2005). “Critical success factors for PPP/PFI projects in the UK construction industry.” Constr. Manage. Econom., 23(5), 459–471.
Ling, F. Y. Y. (2003). “Managing the implementation of construction innovations.” Constr. Manage. Econom., 21(6), 635–649.
Ling, F. Y. Y., Ibbs, C. W., and Kumaraswamy, M. M. (2005). “Enablers that help foreign architectural, engineering, and construction firms win construction contracts in China.” J. Manage. Eng., 21(2), 63–69.
Ling, F. Y. Y., and Liu, M. (2004). “Using neural network to predict performance of design-build projects in Singapore.” Build. Environ., 39(10), 1263–1274.
MacCallum, R. C., Widaman, K. F., Zhang, S., and Hong, S. (1999). “Sample size in factor analysis.” Psychol. Methods, 4, 84–99.
Molenaar, K. R., and Gransberg, D. D. (2001). “Design-builder selection for small highway projects.” J. Manage. Eng., 17(4), 214–223.
Naoum, S. G. (1994). “Critical analysis of time and cost of management and traditional contracts.” J. Constr. Eng. Manage., 120(4), 687–705.
Ndekugri, I., and Church, R. (1996). “Construction procurement by the design and build approach: A survey of problems.” Proc., CIB W92 Procurement Systems North meets South: Developing Ideas, Durban, South Africa, 452–462.
Ndekugri, I., and Turner, A. (1994). “Building procurement by design and build approach.” J. Constr. Eng. Manage., 120(2), 243–256.
Norusis, M. J. (1993). SPSS for windows professional statistics Release 6.0. SPSS Inc., Chicago, Ill.
Norusis, M. J. (2002). SPSS 11.0 guide to data analysis, Upper Saddle River, NJ, Prentice Hall.
Pearson, M., and Skues, D. (1999). “Control of projects implemented through design and build contracts.” Proc., Seminar Design and Build Procurement System, Hong Kong, 49–60.
Ratnasabapathy, S., and Rameezdeen, R. (2006). “Design-bid-build vs design—build projects: Performance assessment of commercial projects in sri lanka.” Sustainability and value through construction procurement, ⟨http://www.irbdirekt.de/daten/iconda/CIB1890.pdf⟩ (October 13, 2006), 474–481.
Rowlinson, S. (1997). “Procurement systems: the view from Hong Kong.” Proc., CIB W92 Procurement—A key to innovation, Univ. de Montreal, Montreal, 665–672.
Rowlinson, S. M., and Walker, A. (1995). The construction industry in Hong Kong, Longman, Hong Kong.
Sharma, A. (1996). Applied multivariate techniques, Wiley, New York.
Shen, Q., Li, H., Chung, J., and Hui, P. Y. (2004). “A framework for identification and representation of client requirements in the briefing process.” Constr. Manage. Econom., 22(2), 213–221.
Smith, L. I. (2002). “A tutorial on principal components analysis.” ⟨nz/cosc453/student_tutorials/principal_components.pdf⟩ (November 23, 2006).
Sohail, M., and Baldwin, A. N. (2004). “Performance indicators for ‘micro-projects’ in developing countries.” Constr. Manage. Econom., 22(1), 11–23.
Songer, A. D., and Molenaar, K. R. (1996). “Selection factors and success criteria for design-build in the US and UK.” J. Constr. Procure., 2(2), 69–82.
Songer, A. D., and Molenaar, K. R. (1997). “Project characteristics for successful public-sector design-build.” J. Constr. Eng. Manage., 123(1), 34–40.
Information & Authors
Information
Published In
Copyright
© 2008 ASCE.
History
Received: Nov 2, 2006
Accepted: Sep 18, 2007
Published online: May 1, 2008
Published in print: May 2008
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.