Project Performance Evaluation Based on Statistical Process Control Techniques
Publication: Journal of Construction Engineering and Management
Volume 134, Issue 10
Abstract
The earned value management (EVM) method is considered as a powerful tool that supports the management of project scope, time, and cost. However, conventional EVM may cause some project managers to ignore the information that it can provide about the performance variations of their projects as well as their causes and effects. This paper attempts to refine and improve the performance of traditional EVM by the introduction of statistical control chart techniques. Individual control charts are used as tools to monitor project performance data so that adverse changes can be detected in a timely manner. This allows analysis of in-progress project cost and schedule performance variations and highlights possible needs for corrective action. A comparative analysis between traditional EVM and the new approach is undertaken to identify the effectiveness of the new approach.
Get full access to this article
View all available purchase options and get full access to this article.
References
Anbari, F. T. (2003). “Earned value project management method and extensions.” Comments Mol. Cell. Biophys., 29(2), 12–23.
Brandon, J., and Daniel, M. (1998). “Implementing earned value easily and effectively.” Proj. Manage. J., 29(2), 11–18.
Carey, R. G., and Lloyd, R. C. (1995). Measuring quality improvement in healthcare, Quality Resource, New York.
Corbett, C. J., and Pan, J. N. (2002). “Evaluating environmental performance using statistical process control techniques.” Eur. J. Oper. Res., 139(1), 68–83.
Department of Defense (DOD). (1996). Earned value management implementation guide, Washington, D.C.
Fleming, Q., and Koppelman, J. (1996). Earned value project management, Project Management Institute, Upper Darby, Pa.
Fleming, Q. W., and Koppelman, J. M. (1994). “The essence of evolution of earned value.” J. Cost Eng., 36(11), 21–29.
Florac, W. A., and Carleton, A. D. (1999). Measuring the software process, Addison–Wesley, Reading, Mass.
Griffith, G. K. (1996). Statistical process control methods for long and short runs, 2nd Ed., ASQC Quality Press, Milwaukee.
Howes, R. (2000). “Improving the performance of earned value analysis as a construction project management tool.” J. Constr. Archit. Manage., 7(4), 399–411.
Kume, H. (1985). Statistical methods for quality improvement, AOTS, Tokyo.
Levinson, W. A., and Tumbelty, F. (1997). SPC essentials and productivity improvement: A Manufacturing approach, ASQ Quality Press, Milwaukee.
Lipke, W. (2002). “Statistical process control of project performance.” J. Def. Softw. Eng., 15(3), 15–18.
Lock, K., and Gordon, J. (1991). Critical path analysis, 5th Ed., Pitman, London.
McConnell, D. R. (1985). “Earned value technique for project performance.” J. Manage. Eng., 1(2), 79–94.
Montgomery, D. C. (1996). Introduction to statistical quality control, 3rd Ed., Wiley, New York.
Pitt, H. (1995). SPC for the rest of us, Addison-Wesley, Reading, Mass.
Pyzdek, T. (1990). Pyzdek’s guide to SPC: Fundamentals, Vol. 1, ASQC Quality Press, Milwaukee.
Slemaker, C. M. (1985). The principles and practice of cost/schedule control systems, Petrocelli Books, Princeton, N.J.
Western Electric Company. (1956). Statistical quality control handbook, New York.
Information & Authors
Information
Published In
Copyright
© 2008 ASCE.
History
Received: Apr 11, 2005
Accepted: Feb 4, 2008
Published online: Oct 1, 2008
Published in print: Oct 2008
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.