TECHNICAL PAPERS
Jun 1, 2007

Project Manager’s Decision Aid for a Radical Project Cycle Reduction

Publication: Journal of Construction Engineering and Management
Volume 133, Issue 6

Abstract

Currently there are no formal decision tools or guidelines to assist owners and project managers in choosing delivery systems and project strategies that would allow significant reductions in the project cycle time. The development of a decision aid that would allow a project manager to prioritize and apply project cycle reduction techniques would be a valuable tool for achieving project cycle time reduction in projects. This paper presents a new high performance project delivery system called “project manager’s game planner” (PMGP) designed to assist a decision maker in identifying and utilizing an optimal set of radical reduction techniques (RRTs) with the greatest potential for success in achieving cycle time reduction. Additionally, the PMGP can assist the user in identifying the top RRTs during any of the five project phases: preproject planning, design, material management, construction, and start-up. Most projects can utilize this PMGP to improve the project performance whether to achieve significant cycle time reduction or to simply achieve effective project execution.

Get full access to this article

View all available purchase options and get full access to this article.

Acknowledgments

The writers would like to thank the Construction Industry Institute for sponsoring this research and also all the members of the Radical Reduction in Project Cycle Time research team who contributed greatly to the formulation of the research methodology and its products.

References

CII. (1986a). “Costs and benefits of materials management systems.” Research summary 7-1, Univ. of Texas, Austin, Tex.
CII. (1986b). “Evaluation of design effectiveness.” Research summary 8-1, Univ. of Texas, Austin, Tex.
CII. (1988). “Concepts and methods of schedule compression.” Research summary 6-7, Univ. of Texas, Austin, Tex.
CII. (1993a). “Preview of constructability implementation.” Research summary 34-1, Univ. of Texas, Austin, Tex.
CII. (1993b). “Zero injury techniques.” Research summary 32-1, Univ. of Texas, Austin, Tex.
CII. (1994). “Preproject planning: Beginning a project: The right way.” Research summary 39-1, Univ. of Texas, Tex.
CII. (1995). “Schedule reduction.” Research Summary 41-1, Univ. of Texas, Austin, Tex.
CII. (1997). “Preproject planning tools: PDRI and alignment.” Research summary 113-1, Univ. of Texas, Austin, Tex.
CII. (1998). “Determining the impact of information management on project schedule and cost.” Research Rep. No. 125-11, Univ. of Texas, Austin, Tex.
CII. (2000). “Reengineering the EPC process.” Research Rep. No. 124-11, Univ. of Texas, Austin, Tex.
CII. (2004). “Radical reduction in project cycle time.” Research Rep. No. PT 193-11, Univ. of Texas, Austin, Tex.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 133Issue 6June 2007
Pages: 437 - 446

History

Received: Apr 10, 2006
Accepted: Nov 30, 2006
Published online: Jun 1, 2007
Published in print: Jun 2007

Permissions

Request permissions for this article.

Authors

Affiliations

Makarand Hastak
Associate Professor, School of Civil Engineering, Purdue Univ., West Lafayette, IN 47907. E-mail: [email protected]
Sanjiv Gokhale
Associate Professor, Dept. of Civil and Environmental Engineering, Vanderbilt Univ., Nashville, TN 37235. E-mail: [email protected]
Kartik Goyani
Project Manager, North Florida Land Development Division, Lennar Development, Tampa, FL 33634.
TaeHoon Hong
Assistant Professor, Dept. of Architectural Engineering, Univ. of Seoul, Seoul, Korea (corresponding author). E-mail: [email protected]
Bhavin Safi
Formerly, Graduate Assistant Researcher, School of Civil Engineering, Purdue Univ., West Lafayette, IN 47907. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share