TECHNICAL PAPERS
Feb 1, 2007

Residential Building Projects: Building Cost Indicators and Drivers

Publication: Journal of Construction Engineering and Management
Volume 133, Issue 2

Abstract

Time and costs are considered to be substantial success factors of building construction projects. In Germany, early cost estimates are provided by multiplying the cost indicator with the gross floor area. When preparing these estimates, the question arises as to which specific cost indicator has to be selected? The relevant cost drivers provide guidance for this selection. Drivers show which parameters are the determinants for the selection of the project-specific cost indicators. However, currently these drivers are not known for building construction projects in the German-speaking region. The relevant cost drivers for residential properties in Germany are identified by using regression analysis. These drivers are the median floor height, the share of the ancillary area for services, the construction duration, and the compactness of the building. Of the four cost drivers, the median floor height proved to have the greatest explanatory significance. The method proves to be suitable for answering the research question. However, some theoretically relevant drivers were not available for the properties being examined. Therefore, these drivers have to be followed up and examined during future studies. Detailed information should be included especially about materials, the planning and construction process, and specific data about various dimensions of the building.

Get full access to this article

View all available purchase options and get full access to this article.

References

Attalla, M., and Hegazy, T. (2003). “Predicting cost deviation in reconstruction projects: Artificial neural networks versus regression.” J. Constr. Eng. Manage., 129(4), 405–411.
Boussabaine, A. H. (2001). “A comparative approach for modeling the cost of energy in sport facilities.” Facilities, 19(5/6), 194–203.
DIN Deutsches Institut für Normung (DIN). (1993). DIN 276 Kosten im Hochbau (building costs), Beuth, Berlin.
DIN Deutsches Institut für Normung (DIN). (2005). DIN 277 grundflächen und rauminhalte von bauwerken im hochbau (Plan areas and volumes in building), Beuth, Berlin.
Emsley, M. E., Lowe, D. J., Duff, A. R., Harding, A., and Hickson, A. (2002). “Data modeling and the application of a neural network approach to the prediction of total construction costs.” Constr. Manage. Econom., 20(6), 465–472.
Love, P. E. D. (2002). “Influence of project type and procurement method on rework costs in building construction projects.” J. Constr. Eng. Manage., 128(1), 18–29.
Love, P. E. D., Tse, R. Y. C., and Edwards, D. J. (2005). “Time–cost relationships in Australian building construction projects.” J. Constr. Eng. Manage., 131(2), 187–194.
Picken, D. H., and Ilozor, B. D. (2003). “Height and construction costs of buildings in Hong Kong.” Constr. Manage. Econom., 21(2), 107–111.
Ruf, H.-U. (2003). “Verfahren der kostenermittlung, kostenkontrolle und kostensteuerung.” Handbuch Kostenplanung I Hochbau, BKI, Stuttgart, Germany, 90–109.
Skitmore, R. M. (1990). “Developments in contract price forecasting and bidding techniques.” Quantity surveying techniques: New directions, P. S. Brandon, ed., BSP Professional Books, London, 75–120.
Skitmore, R. M., and Ng, S. T. (2003). “Forecast models for actual construction time and cost.” Build. Environ., 38(8), 1075–1083.
Statistisches Bundesamt Deutschland. (2005). “Preisindizes für den Neubau von wohngebäuden insgesamt.” Statistisches bundesamt Deutschland, Wiesbaden, Germany.
Thalmann, P. (1998). “A low-cost construction price index based on building functions.” Proc., 15th Int. Cost Engineering Congress, ICEC, Rotterdam, The Netherlands.
Wheaton, W. C., and Simonton, W. E. (2005). “The secular and cyclic behavior of ‘true’ construction costs.” Proc., 21st American Real Estate Society Conf., ARES, Santa Fe, Calif.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 133Issue 2February 2007
Pages: 139 - 145

History

Received: Jul 11, 2005
Accepted: Jul 6, 2006
Published online: Feb 1, 2007
Published in print: Feb 2007

Permissions

Request permissions for this article.

Authors

Affiliations

Christian Stoy [email protected]
Visiting Scholar, Graduate School of Design, Harvard Univ., 9 Kidder Ave., Somerville, MA 02144 (corresponding author). E-mail: [email protected]
Hans-Rudolf Schalcher [email protected]
Full Professor of Planning and Management, Institute of Construction Engineering and Management, Swiss Federal Institute of Technology, Zurich, Switzerland. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share