Discussion of “Modeling a Contractor’s Markup Estimation” by Min Liu and Yean Yng Ling
This article is a reply.
VIEW THE ORIGINAL ARTICLEPublication: Journal of Construction Engineering and Management
Volume 132, Issue 6
Get full access to this article
View all available purchase options and get full access to this article.
References
Ahmad, I., and Minkarah, I. (1988). “Questionnaire survey on bidding in construction.” J. Manage. Eng., 4(3), 229–243.
Akintoye, A., and Fitzgerald, E. (2000). “A survey of current cost estimating practices in the UK.” Constr. Manage. Econom., 18(2), 161–172.
Frayman, Y. (1999). “Fuzzy neural networks for control of dynamic systems.” Ph.D. thesis, Deakin Univ., Australia.
Goh, B. H. (1996). “Residential construction demand forecasting using economic indicators: A comparative study of artificial neural networks and multiple regression.” Constr. Manage. Econom., 14(1), 25–34.
Haykin, S. (1999). Neural networks: A comprehensive foundation, Prentice-Hall, Upper Saddle River, N.J.
Lin, C. T., and Lee, C. S. G. (1996). Neural fuzzy systems: A neuro-fuzzy synergism to intelligent systems, Prentice-Hall, Upper Saddle River, N.J.
Liu, P. Y., and Li, H. X. (2004). Fuzzy neural network theory and application, World Scientific, Singapore.
Low, S. P., and Chan, Y. M. (1997). Managing productivity in construction—JIT operations and measurements, Ashgate Publishing, U.K.
Mak, S., and Picken, D. (2000). “Using risk analysis to determine construction project contingencies.” J. Constr. Eng. Manage., 126(2), 130–136.
Malhotra, N. K. (1982). “Information overload and consumer making.” J. Consum. Res., 8(4), 419–430.
Shash, A. A. (1993). “Factors considered in bidding decision by top U.K. contractors.” Constr. Manage. Econom., 11(1), 111–118.
Shash, A. A., and Abdul-Hadi, N. H. (1992). “Factors affecting a contractor’s mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 10(5), 415–429.
Shash, A. A., and Abdul-Hadi, N. H. (1993). “The effect of contractor size on mark-up size decision in Saudi Arabia.” Constr. Manage. Econom., 11(3), 421–429.
Shen, L. Y., Li, Q. M., Drew, D., and Shen, Q. P. (2004). “Awarding construction contracts on multicriteria basis in China.” J. Constr. Eng. Manage., 130(3), 385–393.
Shen, L. Y., Lu, W. S., Li, H., and Shen, Q. P. (2003). “Computer-aided decision support system for assessing contractor’s competitiveness.” Autom. Constr., 12(5), 577–587.
Stowa. (2005). “Neuro-fuzzy and hybrid approaches.” Stichting Toege-past Onderzoek Waterbeheen, ⟨http://www.stowa-nn.ihe.nl/NFS.htm⟩ (July 1, 2005).
Thompson, A., and Perry, J. G. (1992). Engineering construction risks: A guide to project risk analysis and risk management, Thomas Telford, London.
Unisearch, Ltd. (2002). Workplace regulation, reform and productivity in the international building and construction industry, Royal Commission into the Building and Construction Industry, Australia.
Information & Authors
Information
Published In
Copyright
© 2006 ASCE.
History
Published online: Jun 1, 2006
Published in print: Jun 2006
Authors
Metrics & Citations
Metrics
Citations
Download citation
If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.