Construction Delays in Hong Kong Civil Engineering Projects

Publication: Journal of Construction Engineering and Management
Volume 132, Issue 6

Abstract

Construction delays are common in civil engineering projects in Hong Kong, inevitably resulting in contractual claims and increased project cost. This study was aimed, first, at gathering the perceptions of civil construction practitioners on how significant are the causes of delay; and, second, investigating whether the suggestions as stated in the report of the Construction Industry Review Committee (the Committee comprises members with good standing and knowledge in the construction and related fields as well as those from other professions who are responsible for examining the current state of the construction industry in terms of its output quantity, the quality of work, its environmental friendliness, site safety, its workforce and the system of supervision) are applicable to and effective at mitigating the corresponding delays with reference to a ranking order established using the mean score method. The extent of the differences in perception among the different respondent groups on these two issues was also examined using the rank agreement factor (RAF), percentage agreement (PA), and percentage disagreement (PD). The differences in the perceptions of the respondents on the significance of delays and the actual causes of delays for the six projects studied were also examined. The results of the study showed that the respondents tended to admit their own faults as shown in the top ten significant causes of delay. A strong consensus was found between the client and consultant groups on the significance of the various causes of delay (PA=74%) and the effectiveness of mitigation measures (PA=67%) compared with the other pairs of groups. The consultant and contractor groups held extremely different perceptions regarding the significance of various delay causes ( RAF=4.9 and PD=32% ) and the effectiveness of corresponding mitigation measures ( RAF=6.2 and PD=47% ). It is believed that the findings can provide much more insight for the construction practitioners as well as the researchers and thus help to improve the productivity and overall performance of civil construction projects in Hong Kong.

Get full access to this article

View all available purchase options and get full access to this article.

References

Al-Khall, M. I., and Al-Ghafly, M. A. (1999). “Important causes of delay in public utility projects in Saudi Arabia.” Constr. Manage. Econom., 17(5), 647–655.
Al-Momani, A. H. (2000). “Construction delay: A quantitative analysis.” Int. J. Proj. Manage., 18(1), 51–59.
Arditi, D., Akan, G. T., and Gurdamar, S. (1985). “Reasons for delays in public projects in Turkey.” Constr. Manage. Econom., 3, 171–181.
Assaf, S. A., Al-Khalil, M., and Al-Hazmi, M. (1995). “Causes of delay in large building construction projects.” J. Manage. Eng., 11(2), 45–50.
Baldwin, J. R., Mathei, J. M., Rothbart, H., and Harris, R. B. (1971). “Causes of delay in the construction industry.” J. Constr. Div., Am. Soc. Civ. Eng., 97(2), 177–187.
Carnell, N. J. (2000). Causation and delay in construction disputes, Blackwell Science Ltd., Oxford, U.K.
Chan, D. W. M., and Kumaraswamy, M. M. (1995). “Differing perceptions as to general causes of construction time overruns in Hong Kong.” Proc., 11th Annual ARCOM Conf., Association of Researchers in Construction Management, U.K., 318–329.
Chan, D. W. M., and Kumaraswamy, M. M. (1996). “Reasons for delay in civil engineering projects—The case of Hong Kong.” Hong Kong Inst. Eng. Trans., 2(3), 1–8.
Construction Industry Review Committee (CIRC. (2001). Construct for excellence, Hong Kong Special Administrative Region, Hong Kong.
Dlakwa, M. M., and Culpin, M. F. (1990). “Reasons for overrun in public sector construction projects in Nigeria.” Int. J. Proj. Manage., 8(4), 237–241.
Kumaraswamy, M. M., and Chan, D. W. M. (1995). “Determinants of construction durations.” Constr. Manage. Econom., 13(3), 209–217.
Kumaraswamy, M. M., and Chan, D. W. M. (1998). “Contributors to construction delays.” Constr. Manage. Econom., 16(1), 17–29.
Mansfield, N. R., Ugwu, O. O., and Doran, T. (1994). “Causes of delay and cost overruns in Nigerian construction projects.” Int. J. Proj. Manage., 12(4), 254–260.
O’Brien, J. J. (1976). Construction delay: Responsibilities, risk and litigation, Cahners Books International, Inc., Boston.
Ogunlana, S. O., Promkuntong, K., and Jearkjirm, V. (1996). “Construction delays in a fast-growing economy: Comparing Thailand with other economies.” Int. J. Proj. Manage., 14(1), 37–45.
Okpala, D. C., and Aniekwu, A. N. (1988). “Causes of high costs of construction in Nigeria.” J. Constr. Eng. Manage., 114(2), 233–244.
Pickavance, K. (2000). Delay and disruption in construction contracts, 2nd Ed., LLP, London.
Sekaran, U. (1992). Research methods for business, 2nd Ed., Wiley, New York.
Semple, C., Hartman, F. T., and Jergeas, G. (1994). “Construction claims and disputes: Causes and cost/time overruns.” J. Constr. Eng. Manage., 120(4), 785–795.

Information & Authors

Information

Published In

Go to Journal of Construction Engineering and Management
Journal of Construction Engineering and Management
Volume 132Issue 6June 2006
Pages: 636 - 649

History

Received: Mar 17, 2004
Accepted: May 16, 2005
Published online: Jun 1, 2006
Published in print: Jun 2006

Permissions

Request permissions for this article.

Authors

Affiliations

Tommy Y. Lo [email protected]
Associate Professor, Dept. of Building & Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Kowloon, Hong Kong (corresponding author). E-mail: [email protected]
Ivan W. Fung [email protected]
University Lecturer, Dept. of Building & Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Kowloon, Hong Kong. E-mail: [email protected]
Karen C. Tung [email protected]
Research Student, Dept. of Building & Construction, City Univ. of Hong Kong, 83 Tat Chee Ave., Kowloon, Hong Kong. E-mail: [email protected]

Metrics & Citations

Metrics

Citations

Download citation

If you have the appropriate software installed, you can download article citation data to the citation manager of your choice. Simply select your manager software from the list below and click Download.

Cited by

View Options

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Get Access

Access content

Please select your options to get access

Log in/Register Log in via your institution (Shibboleth)
ASCE Members: Please log in to see member pricing

Purchase

Save for later Information on ASCE Library Cards
ASCE Library Cards let you download journal articles, proceedings papers, and available book chapters across the entire ASCE Library platform. ASCE Library Cards remain active for 24 months or until all downloads are used. Note: This content will be debited as one download at time of checkout.

Terms of Use: ASCE Library Cards are for individual, personal use only. Reselling, republishing, or forwarding the materials to libraries or reading rooms is prohibited.
ASCE Library Card (5 downloads)
$105.00
Add to cart
ASCE Library Card (20 downloads)
$280.00
Add to cart
Buy Single Article
$35.00
Add to cart

Media

Figures

Other

Tables

Share

Share

Copy the content Link

Share with email

Email a colleague

Share